52000QR260028280-CGC PIKE Fire System Inspection
Archived on October 7, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- September 16, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 561621: Security Systems Services (except Locksmiths)
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- SFLC PROCUREMENT BRANCH 1(00080)
- Place of performance
- Ketchikan, Alaska, 99901
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 52000QR260028280
- Notice ID
- a3a9424c0bf443eea1ae22161132c3be
Description
Solicitation Amendment #1
During the evaluation phase of initial proposals, the Government determined that it was unable to establish price reasonableness based on the proposals received. The purpose of this amendment is to reopen the solicitation to maximize competition and allow offerors the opportunity to submit competitive revised quotations.
The Government has:
- Reopened the Solicitation to promote full and open competition and ensure the receipt of fair and reasonable pricing.
- Updated the Period of Performance (PoP) within the Statement of Work (SOW) to reflect revised performance dates.
- Extended the Closing Date to allow existing offerors and new prospective vendors adequate time to prepare and submit proposals.
Revisions to Period of Performance (PoP) / SOW
The Statement of Work (SOW) has been updated solely to reflect the revised Period of Performance as follows:
- Previous Period of Performance: 21 September 2026 and 30 September 2026
- Revised Period of Performance: 25 September 2026 and 30 September 2026
No other revisions have been made to the technical requirements, tasks, or deliverables of the SOW.
Instructions to Offerors:
All other terms and conditions of the original solicitation remain unchanged.
If a previous proposal was submitted by the first closing window and no response or revised proposal is received from the bidder on this amendment, the original proposal will be deemed final and binding and evaluated as-is. It is the sole responsibility of the interested party to monitor the solicitation for all modifications.
Prospective offerors who did not submit a proposal prior to the original deadline are invited and encouraged to submit a complete proposal.
The new closing date for this solicitation is Tuesday, 22 September 2026, 10:00AM EST. Proposals must be received by this deadline to be considered.
CGC PIKE FIRE SYSTEM INPECTION
This synopsis/ solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13. This requirement is of an unusual and compelling urgency in accordance with FAR 13.106-1(b)(1). The inspection is necessary to ensure safety and mission readiness. Delay in award would result in unacceptable risk to government operations.
This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ) Number 52000QR260028280. This procurement will be processed in accordance with FAR Part 12.
The North American Industry Classification System (NAICS) is 561621. The small business size standard is $25M. This is a total small business set aside. All responsible small business sources may submit quotations that will be considered. This synopsis/solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13.
THE UNITED STATED COAST GUARD SURFACE FORCE LOGISTICS CENTER REQUEST THE CONTRACTORS TO PROVIDE PRICING FOR THE FOLLOWING REQUIREMENT:
The contractor shall provide CGC PIKE with inspection and hydrostatic testing of installed Engine Room CO2 & Galley APC Systems.
A. REQUIREMENT:
1. Inspection and hydrostatic testing of installed Engine Room CO2 & Galley APC Systems onboard CGC PIKE IAW SOW.
2. Location of Performance (FOB Destination)
CGC PIKE
1300 Stedman St
Ketchikan, AK 99901
3. REQUIRED PERIOD OF PERFORMANCE: Upon contract award, the Contractor shall contact the CGC PIKE Point of Contact (POC) within two (2) business days to coordinate and confirm final performance dates. Once a start date is set and the Contractor is prepared to conduct services, the actual period of performance shall not exceed a total of five (5) days. All work shall fall within the window of availability between 21 September 2026 and 30 September 2026, with all services completed no later than (NLT) 30 September 2026.
Interested Vendors shall provide product/service details, Product Data Sheet, and cost breakdown IAW SOW for technical review. Vendors shall provide a detailed cost breakdown to include all the specifications to be reviewed by a technical rep.
NOTE: The USCG/Government reserves the right to Award on an All or None Basis, i.e., the Government may issue a Purchase Order (PO) to the offeror that submits the lowest aggregate price, rather than issue a PO to each offeror based on the lowest quotation on each item.
As stated below, the provision at FAR 52.212-2- Evaluation-Commercial Products and Commercial Services-applies with the following addenda:
Award of a contract will be based on the following criteria: The purchase order will be awarded as a firm-fixed price contract using simplified acquisition procedures in accordance with FAR Part 13.
1. Please provide any warranty information.
2. Vendors MUST have an active registration in www.sam.gov
The USCG/Government intends to award a purchase order resulting from this synopsis/solicitation to the responsible contractor whose quote conforms to the solicitation and is most advantageous and the best value to the Government, price and other factors considered. The Government will utilize the simplified evaluation procedures outlined in FAR 13.106-2.
Please Note: Interested Offerors having the expertise as required are invited to submit a Firm Fixed Price quotation that will be considered by the agency. Quotations must be submitted on company letterhead stationery and must include the following information:
(1) Cost Breakdown
(2) Unit Cost
(3) Extended Price
(4) Total Price
(5) Payment Terms
(6) Discount offered for prompt payment
(7) Company Unique Entity ID (UEI) and Cage Code..
Quotes must be received no later than 22 September 2026 at 10 A.M. Eastern Standard Time. Email quotes are acceptable and shall be sent to SK2 Ilai Medina Velazquez at: Ilai.g.medinavelazquez@uscg.mil and carbon copy Contracting Officer, SKC Karla Balint at karla.p.balint@uscg.mil.
Any questions or concerns regarding any aspect of the RFQ must be forwarded to SK2 Ilai Medina Velazquez at email address Ilai.g.medinavelazquez@uscg.mil and carbon copy Contracting Officer SKC Karla Balint via email karla.p.balint@uscg.mil.
The following FAR Clauses and Provisions apply to this acquisition:
- FAR 52.204-7 – System for Award Management (Nov 2024). To facilitate payment, contractors shall be registered in SAM.gov with an active Unique Entity Identifier (UEI) prior to submitting a quotation. A UEI and SAM registration can be obtained via https://www.sam.gov.
- FAR 52.212-1 - Instructions to Offerors – Commercial Products and Commercial Services (Sep 2023)
- FAR 52.212-2 - Evaluation - Commercial Products and Commercial Services (Nov 2021) Award will be made to the Offeror proposing the Best Value to the Government considering specification, price, past performance and quality.
- FAR 52.212-3 - Offeror Representations and Certifications - Commercial Products and Commercial Services (Oct 2025) to include Alt I (Feb 2024). Offeror shall complete annual representations and certification electronically via the System for Award Management (SAM) website accessed through https://www.sam.gov.
- FAR 52.212-4 - Contract Terms and Conditions - Commercial Products and Commercial Services (Nov 2023)
- FAR 52.212-5 - Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services (Mar 2026)
- FAR 52.252-2 - Clauses Incorporated by Reference (Feb 1998)
The following clauses, and others as directed by the Contracting Officer as applicable, shall apply to this awarded contract:
- FAR 52.222-3 - Convict Labor (Jun 2003)
- FAR 52.222-19 - Child Labor Cooperation with Authorities and Remedies (Mar 2026) (E.O.13126).
- FAR 52.222-35 - Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
- FAR 52.222-36 - Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
- FAR 52.222-37 - Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
- FAR 52.222-50 - Combating Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O. 13627).
- FAR 52.225-1 - Buy American Supplies (Oct 2022) (41 U.S.C. chapter 83).
(51) - 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
- FAR 52.232-33 - Payment by Electronic Funds Transfer - Systems for Award Management (Oct 2018)
- FAR 52.233-3 - Protest After Award (Aug 1996)
- FAR 52.233-4 - Applicable Law for Breach of Contract Claim (Oct 2004)
NOTE: In addition to the listed clauses, please review the attached FAR Clause Matrix for all clauses applicable to this requirement.
*The above clauses are incorporated by reference, entire clause(s) available at https://acquisition.gov.
NOTICE TO OFFERORS CONCERNING REPRESENTATIONS AND CERTIFICATIONS:
This solicitation contains FAR Clause 52.204-7, System for Award Management and FAR Provision 52.204-8, Annual Representations and Certifications. In accordance with FAR 4.1201 (a), prospective contractors shall complete electronic annual representations and certifications via SAM accessed through https://www.sam.gov. Please ensure completion prior to submitting a quotation. Paragraph (b) of FAR 52.204-8 applies.
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Additional examples include 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services, and 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
- Download
PIKE_SOW_Revised.docx
29 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Smart Matrix Acquisition.GOV.pdf
88 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
N33005.D_Maintenance Procedure Card.pdf
236 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
52000QR260028280-CGC PIKE Fire System Inspection
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
52000QR260028280-CGC PIKE Fire System Inspection
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers, Southwestern Division (SWD), Tulsa District (SWT) issued a commercial solicitation, W912BV26QA064, for the ROBERT S. KERR MARINE TERMINAL - INSPECTION AND CERTIFICATION OF FIRE SUPPRESSION SYSTEM. | 74% | Combined Synopsis | 05/22/2026 |
This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. The NAICS code for this procurement is 56121 - Security system services except locksmiths, PSC H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00. Responses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available. THE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government. The Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below: STATEMENT OF WORK (SOW) Fire Alarm Testing and Inspection 1. Contracting Officer s Representative (COR): TBD 2. Contract Title. Fire Alarm Testing and Inspection 3. Background. The Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. 4. Scope. Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106. Fire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements. Some testing requirements will be met during off-hours or weekends. 5. Specific Tasks. 5.1. Task 1 Annual Testing Provide COR with testing schedule indicating dates of required testing. All Annual testing requirements (except elevator associated devices) will be started and completed in the month of January. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.2. Subtask 2 Semi-Annual Testing Provide COR with testing schedule indicating dates of required testing. All Semi-annual testing requirements will be started and completed in the month of July. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.3. Subtask 3 Quarterly Testing Provide COR with testing schedule indicating dates of required testing. All Quarterly testing requirements will be started and completed in the months of January, April, July, and October. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.4 Subtask 4 Elevator Device Testing All testing requirements for elevator associated devices will be started and completed in the month of February. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.5 Subtask 5 Kitchen Hood Testing Provide COR with testing schedule indicating dates of required testing. Kitchen Hood Testing: Completed two times per year after 7pm M-F, June and December Report on company letterhead contains Company name Date of test Items tested and inspected Pass Fail for each item tested Pass Fail for each exhaust hood Itemized requiring corrective action follow-up 6. Deliverables: Fire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval. SOW Task# Deliverable Title Format Number Calendar Days After Start 1 Site Specific Safety Plan Word - PDF >30 days 2 Annual Testing Schedule Email Word - Excel >30 days 3 Semi-Annual Testing Schedule Email Word Excel >30 days 4 Quarterly Testing Schedule Email Word Excel >30 days 5 Live Testing Schedule Email Word Excel >30 days 6 HVAC Testing Schedule Email Word - Excel >30 days 7 Atrium Smoke Detector Testing Schedule Email Word Excel >30 days 8 Annual Test Report Email PDF - Excel 14 Days 9 Semi-Annual Test Report Email PDF Excel 14 Days 10 Quarterly Test Report Email PDF Excel 14 Days 11 Elevator Device Test Report Email PDF Excel 14 Days 12 Kitchen Hood Test Report Email PDF - Excel 14 Days 7. Contractor Responsibility: Prior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an "as-is" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. This contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC. The SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards. Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System. The existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because of new construction or renovation during the performance period. Quarterly meetings will be conducted with CO, COR, and contractor leadership. Quarterly meetings may be in-person or virtual. Contractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment. At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW. Offerors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact. The awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period. The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes. The Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday. COR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW. COR will ensure inspection reports are completed timely and uploaded into the VA maintenance records. 8. Check In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. 9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required. 9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. 9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation. 10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. 11. VA Information Custodial Language: 11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). 11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated. 12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). No government furnished equipment will be issued to complete the requirements of this contract. 13. Other Pertinent Information or Special Considerations. Louis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas: Cares Tower Main Facility Atrium Women s Health Annex Learning Exchange Parking Garage The fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system. Upgrade project will not be completed within the next 12 months Fire Alarm Reports will come from both systems to be complete. Coordination with fire alarm project will be required to schedule testing. Proof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years. All Annual testing requirements (except elevator associated devices) will be started and completed in the month of January. All testing requirements for elevator associated devices will be started and completed in the month of February. All Semi-annual testing requirements will be started and completed in the month of July. All Quarterly testing requirements will be started and completed in the months of January, April, July, and October. Kitchen Hood Testing: Completed two times per year after 7pm M-F June and December Weekly Fire Pump testing will be completed and documented by VA personnel Testing will require the following to complete: Climbing, bending, crawling Ladder use Vertical Scissor Lift. Lift not supplied by government. Magnet Notifier Keys Canned Smoke Laptop or Tablet to access CLSS Gateway network Any other tools/equipment contractor determines necessary to complete testing VA personnel will assist contactor as needed to complete the following: Gain access to secure areas Locate difficult to find areas. Efforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing. May require after hours or weekend testing to support patient care. Federal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing. Elevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop. Testing requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday) Live Testing: Contractor shall provide requested schedule for required live testing no less than 30 days before required testing month. Live testing will be completed during an identified weekend during the annual testing period. Sundays are preferred testing day for live testing. Pull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility. Pull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month. Pull station testing can be coordinated to be completed over an approved weekend. HVAC duct detector testing: Will be conducted in conjunction with the HVAC shop Testing schedule will be generated in advance and approved by all necessary parties Test results must verify and document the following: Fire damper activates HVAC unit shuts down HVAC unit able to be reset to normal after testing: Yes-No Atrium Smoke Detectors Tested will be conducted on a scheduled Saturday (8 hours) Requires use of scissor lift Contractor will provide lift and lift operator. Ceiling height to atrium smoke detectors is 40 feet. Tamper and Water Flow Testing Under TJC.02.03.05 and NFPA 25 Water Flow devices require quarterly testing (4 times per year January, April, July, October) NFPA 25 requirements include requirements for water to flow during this testing. Must operate flow valve and flow water to activate signal Tamper switches require semiannual testing (2 times per year January and July) At bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC. Contractor must demonstrate access to the following fire alarm system, vendor support and parts procurement: Notifier Dealer Notifier programming capability Notifier parts Notifier technical support Gateway / CLSS Testing reports generated through CLSS gateway at no additional cost to the government Parking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking. a. Identification of Possible Follow-on Work. Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. b. Identification of Potential Conflicts of Interest (COI). None c. Identification of Non-Disclosure Requirements. Not Applicable d. Packaging, Packing and Shipping Instructions. None e. Inspection and Acceptance Criteria. Contractor will be responsible for meeting all inspection and timelines listed in this SOW. 14. Risk Control Work performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility. 15. Place of Performance. Louis Stokes VA Medical Center 10701 East Blvd Cleveland, Ohio 44106 16. Period of Performance. Base Year: A date of award for duration of. 365 calendar days & 4 Option Years | 66% | Market Research | 10/30/2026 |
64% | Awarded | Open | |
Is the fire pump diesel-driven or electric, and are its routine no-flow (churn) tests performed weekly or monthly? The pump is electric. The no-flow tests are performed in-house monthly. There should be a quarterly flow test performed by the contractor. Will VA personnel perform those tests between scheduled inspections, or should we include those visits in our quoted price? Answered above. | 61% | Solicitation | 11/16/2026 |
The requirement consists of inspection and repair services for existing wet-pipe fire sprinkler systems located in Buildings N-104 and T-1002. Required tasks include National Fire Protection Association (NFPA) Standard 25 five-year internal obstruction investigations, sprinkler head surveys, removal and submission of sprinkler heads for Underwriters Laboratories (UL) testing, and the repair or replacement of valves, gauges, pipe sections, hangers, water motor alarms, and related fire protection system components. All work must comply with NFPA 25 (Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems), NFPA 13 (Installation of Sprinkler Systems), NFPA 72 (National Fire Alarm and Signaling Code), NFPA 101 (Life Safety Code), applicable International Code Council (ICC) building codes, and Occupational Safety and Health Administration (OSHA) regulations. The complete description of required tasks is contained in the Government?s Performance Work Statement (PWS).The applicable North American Industry Classification System (NAICS) code is 561210 ? Facilities Support Services, with the corresponding Product Service Code (PSC) H312 ? Inspection and Repair of Fire Control Equipment. | 54% | Combined Synopsis | 12/19/2025 |
Additional Details
Solicitation Number
52000QR260028280
Archive Date
Oct 7, 2026
Office Address
NORFOLK, VA, 23510