Notice ID: 5303ed2f35e04de2ab762679a960b99aPresolicitation

15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

Active, no response deadline listed. Full description on SAM.gov.

Overview

Posted
October 27, 2026
Notice type
Presolicitation
Set-aside
Small Business Set Aside - Total
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.ENDIST TULSA.W076 ENDIST TULSA
Place of performance
Paradise Hill, Oklahoma
PSC
Y1NZ: CONSTRUCTION OF OTHER UTILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912BV26RA032
Notice ID
5303ed2f35e04de2ab762679a960b99a

Description

*This Pre-Solicitation Notice is being updated to notify industry that the solicitation number for this requirement has been updated to W912BV27RA003. The Solicitation has been posted on 27 OCT 2026. 

Pre-solicitation Notice

For

15kV Switchgear & Station Service Replacement

at Lake Tenkiller, OK

This is a PRE-SOLICITATION NOTICE for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.

Project Description:

The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers.

  • Removal of existing 500 kVA, 13.8 kV/480V station service transformer
  • Removal of existing 15 kV switchgear and breakers located beneath control room
  • Removal of 480V station service switchgear in control room
  • Removal of the existing 15kV cables to the switchyard
  • Removal of existing potheads for the 15kV cable transition to switchyard bus
  • Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel
  • Installation of new 15kV cables to the switchyard
  • Installation of new potheads for the 15kV cable transition to switchyard bus
  • Installation of new cable trays containing the new 15kV cables in cable tunnel
  • Installation of front accessible double-ended 480V switchgear beneath control room with feeder

circuit breakers

  • Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA

13.8kV/480V, high-resistance grounded wye station service transformers

  • Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding

resistor.

  • New control and annunciation wiring for new 480V and 15kV switchgear where existing cables

are not reused.

  • Modifications to protective relay settings and new protection relays for the new station service

feeders.

  • Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc

flash mitigation switches.

  • Replacement and relocation of existing Lighting Transformer

The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000.

The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M.

The Product Service Code is: Y1NZ (Construction of Other Utilities)

Estimated duration of construction of this project is 900 calendar days.

Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchived

    15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

    Notice fc07f25c548d4fd0806083693005097f on SAM.gov

  2. 5
    Version 5Presolicitation

    Type changed from Sources Sought to Presolicitation

    15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

    Notice 630ba2e721314e859bd60380d335a32f on SAM.gov

  3. 7
    Version 7Presolicitation

    15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

    Notice cc992f08d37743bb8d6c092e3b5a9d84 on SAM.gov

  4. 8
    Version 8PresolicitationCurrent

    15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

    Notice 5303ed2f35e04de2ab762679a960b99a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912BV26RA032

Archive Date

Nov 10, 2026

Office Address