Y1DA--656-20-130, Repair Building 50 Basement Kitchen 36C26326C0022 PO; 656C0058
Awarded on February 26, 2026. Full description on SAM.gov.
Overview
- Posted
- February 26, 2026
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- NETWORK CONTRACT OFFICE 23 (36C263)
- Place of performance
- Saint Cloud VA HCS 4801 Veterans Dr, St Cloud,, Minnesota, 56303
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
- Award date
- Feb 26, 2026
- Award amount (SAM.gov award notice)
- $2.9M
Identifiers
- Solicitation number
- 36C26326B0009
- Notice ID
- 176d676e549a416ab732cd2d13686c78
- Award number (PIID)
- 36C26326C0022
Description
The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phased implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. The PoP is 320 Days
Award Overview
Award Number
36C26326C0022
Award Amount (SAM.gov award notice)
$2.9M
Award Date
Feb 26, 2026
Awardee
Awardee UEI
J96QTKC5KVD4
Awardee CAGE Code
5B1A9
Awardee Address
WEST FARGO, ND 58078, ND
Original Solicitation
Notice ID: 176d676e549a416ab732cd2d13686c78
Posted Date: Feb 26, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $6.4MSigned Nov 4, 2026
- $13.9MSigned Oct 20, 2026
- $13.8MSigned Oct 9, 2026
- $23.2MSigned Oct 6, 2026
- $22.9MSigned Sep 11, 2026
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
36C26326C0022_1.docx
13 KBAdded in Award Notice version 3Posted
Lifecycle
- 3Version 3Award NoticeArchivedCurrent
Y1DA--656-20-130, Repair Building 50 Basement Kitchen 36C26326C0022 PO; 656C0058
Other notices for this solicitation
- Pre-SolicitationRelated noticeNov 26, 2025
Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002
- SolicitationRelated noticeDec 30, 2025
Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002
- SolicitationRelated noticeJan 2, 2026
Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002
- SolicitationRelated noticeJan 5, 2026
Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Work shall include, but shall not be limited to providing all abor, materials, equipment, etc necessary to complete Fargo VA Health Care System project 437- 22-108, Place Chilled Water Pumps on Emergency Power, in accordance with this Scope of Work, NEC, VHA Directive 1028 (Electrical Power Distribution Systems), the contract documents, all applicable federal, state and local codes as well as all NFPA requirements. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path (from panel in), aswell as breaker location switching and replacement for pumps 8, 9, 12, 13, 14,15, 16, 17, 18, and 19, with Motor Control Center (MCC) bucket swapping and relocation for pumps 8 and 9, with all necessary conduit and wire demolition, intercepting, rerouting, and installation to bring them onto emergency equipment branch power. Some pieces of electrical distribution equipment will require commissioning services to be obtained by the Contractor and include at a minimum, the automatic transfer switch. The Contractor shall account for and be prepared to replace all necessary devices, cabling, and conduit as needed and per specifications. As part of commissioning, the Contractor shall be responsible for testing all equipment installed per NEC, and the best practices and standards issued by the National Electrical Testing Association (NETA), and the Institute of Electrical and Electronics Engineers (IEEE). Period of Performance =270 calendar Days | - | Pre-Solicitation | 02/06/2026 |
438-21-403, Renovate First Floor Kitchen | - | Solicitation | 11/12/2026 |
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials. | - | Solicitation | 09/02/2026 |
This is a Pre-Solicitation Notice regarding project: 438-21-403, Renovate First Floor Kitchen at the Sioux Falls VA Health Care System, Sioux Falls, South Dakota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Firm-Fixed-Price contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal. Estimated SOLICITATION DATE: on or about 08/20/2026 Estimated AWARD DATE: 10/31/2026 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 236220, Commercial and Institutional Building Construction $45.0 Million PROJECT MAGNITUDE: Between $10,000,000 and $20,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. SCOPE OF WORK 438-21-403, Renovate First Floor for New Kitchen Sioux Falls VA Healthcare System GENERAL INFORMATION Base Bid: The Contractor must provide all supervision, tools, labor, materials, equipment, services, and testing necessary to accomplish the Renovate First Floor for New Kitchen project per the construction drawings and specifications. The project must be accomplished by the contract drawings and specifications for the project 438-21-403. Follow OSHA and all VA regulations as outlined in specifications 01 00 00. This work includes but is limited to: Demolition as described on the design plans and specifications. The contractor is responsible for locating all the existing utilities within the project site before any excavation or site work begins. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Construction consists of, but is limited to: Site work includes fencing, excavation, grading, paving, and protection of existing utilities. Demolition of walls, floors, ceilings, equipment, heating/cooling ventilation, and electrical. Construction consists of architectural, structural, mechanical and electrical improvements. Installation of owner furnished equipment The existing kitchen is located on the 2nd floor of building 5. The project consists of renovating first floor of building 5. There are phases to ensure the kitchen and VA staff provide meals for the impatient staff during the construction. Phasing is required to keep the existing kitchen operational. Additional construction projects will be occurring at the same time and near the kitchen renovation space. Contractors are expected to coordinate with the other contractors to minimize the disruption to the hospital. Owner furnished equipment will be provided for contractor installation. Once the equipment is received the contractor must store the equipment on site in a humidity and temperature-controlled storage unit. Maintain 50% relative humidity and a temperature of 60 - 70 degrees Fahrenheit. VA will be badging all construction employees. Badging requires background checks and personal information on each contract employee that will be on site. Forms to be filled out by the contractors and submitted for the badging process. Submittal exchange shall be procured and managed by the contractor for all submittals; Phasing is required to ensure the hospital is functional throughout the request for information (RFI), architectural supplemental information (ASI), VA purchased contractor installed equipment, shop drawings, and other project tracking needs for the duration of the project. Specification section 11 40 00 and plan sheet FS101 and plan sheet FS103 include the owner furnished kitchen equipment for a line item to be included in submittal exchange for review and acceptance. Night and weekend work will be expected to keep the campus fully functional during the construction activities that cannot be accomplished during business hours. After-hours are typically 5:00pm and before 6:00am. A dedicated site superintendent managing the construction effort and a site safety health officer shall be present during all construction activities. A dedicated quality control manager for the quality of the construction effort must be provided by the contractor per specification 01 45 00. Other construction will be occurring during the project. Coordination with other contractors is expected to ensure no disruption to the hospital s daily functions. Accuracy of the Planned Information: Bidders are highly encouraged to conduct a thorough site visit to investigate all as-built conditions of the project area in this SOW. Discrepancies in Planning Information: The prime contractor must promptly report to the Contracting Officer in writing any discrepancies between plans and specifications and as-built conditions. The Prime Contractor shall make no adjustments to their work due to discrepancies prior to review by the Contracting Officer. Ownership of Drawings: All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be the sole property of the US Government. The Prime Contractor shall provide a list of all items specified for which no substitutions will be accepted. This list shall identify each item with the specification section in which the item is defined. Performance Period:  The contractor shall complete the work required under this SOW, Monday through Friday in 550 calendar days or less from Notice to Proceed, unless otherwise directed by the Contracting Officer (CO). Construction at the Government site shall not take place on Federal holidays or weekends unless approved by the project engineer. Tentative Schedule:  Contract Award A Pre-construction Conference A+7 Notice to Proceed D (A+12) Construction Start D+22 Construction Completion D+550 | - | Pre-Solicitation | 09/01/2026 |
Amendment 2 for additional questions received | - | Solicitation | 08/03/2026 |
Additional Details
Solicitation Number
36C26326B0009
Archive Date
Apr 27, 2026
Office Address
Saint Paul, MN, 55101