GovChime
Notice ID: 5597ff662796412689dd4218dbbe7edaSolicitationArchived

SOR Waterline Repair

Archived on October 2, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MDT
Posted
September 11, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE GLOBAL STRIKE COMMAND.FA9401 377 MSG PK
Place of performance
0, New Mexico, 87117
PSC
C1NE: ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA940126R0023
Notice ID
5597ff662796412689dd4218dbbe7eda

Description

The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and pre-packaged pump station at the SOR site.

A site visit will be held on 03 September 2026 at 1300 MST and all parties will meet at the Truman Gate Visitors Center to be sponsored onto base at 1200 MST.

Please submit the full names, date of birth, and citzenship of your attendees NLT COB 28 August 2026 and advise if you require base passes to access Kirtland AFB to the Mrs. Abigail Crespin, abigail.crespin@us.af.mil and TSgt Hillarie Johnson, hillarie.johnson@us.af.mil.

All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.

Equitable Adjustments will be IAW RFO 52.212-4.

Contractor Access to CUI attachments: If a contractor is accessing request to a restricted, government only document, they would need to submit the DD2345 for their company as part of their request.  The justification (relevant business activity) in Block 4 of the DD2345 is used to determine access to controlled information they are requesting.  Typically, companies include something about bidding on contracts as part of their relevant business activity. Submit a completed copy of the DD 2345 to the JCP link. Refer to the attachment  04. DD2345 JPC Guide and 04a. DD 234. 

Site Visit Access and Directions (see attachment for directions and map):

Attachment: 11X17 B29999 Route (Map)

Attachment: Directions and Access Notice (Security requirments and written directions)

Security & Base Access Verification:

All attendees must fulfill one of the security verification pathways below to enter the installation and access the project area:

Option 1: Physical Documents (Required on Person During Site Visit)

Attendees must bring an original valid U.S. Passport or certified Birth Certificate directly with them. Please note that attendees will need to retain these documents on their person throughout the event, as they are mandatory to gain entry to the actual site location as well as the main gate.

Option 2: Advance Verification Letter (Deadline: Tomorrow at 09:00 AM MST)

Your organization may submit an official access roster containing the attendee's Full Name, Date of Birth, Place of Birth, and Social Security Number. Letters must be received prior to tomorrow at 09:00 AM and transmitted via fully encrypted email to safeguard Personally Identifiable Information (PII).

Please ensure all visiting personnel have their credentials in order prior to arrival to prevent access delays. Reach out if you have any questions or require assistance.

2026.09.11_Photos and Questions with responses added, refrence attachments SoR Consolidated Responses and Site Photos. 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (20)

  • SOR Waterline_Consolidated Responses.pdf

    199 KBAdded in Solicitation version 6Posted
    Download
  • Site Photos.pdf

    922 KBAdded in Solicitation version 6Posted
    Download
  • 11x17 B29999 Route.pdf

    1.8 MBAdded in Solicitation version 3Posted
    Download
  • Directions and Access Notice.pdf

    73 KBAdded in Solicitation version 3Posted
    Download
  • Solicitation - FA940126R0023.pdf

    708 KBAdded in Solicitation version 1Posted
    Download
  • Ombudsman and Contractor Access.pdf

    94 KBAdded in Solicitation version 1Posted
    Download
  • Statement of Work - SOR Waterline Repair.pdf

    269 KBAdded in Solicitation version 1Posted
    Download
  • Wage Determination - 08-10-2026.pdf

    238 KBAdded in Solicitation version 1Posted
    Download
  • Evaluation Factors R2-250008-Repair SOR Waterline.pdf

    134 KBAdded in Solicitation version 1Posted
    Download
  • 01a. Attachment A - SOR Waterline Detail.pdf

    2.8 MBAdded in Solicitation version 1Posted
    Requires SAM.gov sign-in
  • 01b. Attachment B - SOR Existing Waterline Layout.pdf

    2.0 MBAdded in Solicitation version 2Posted
    Requires SAM.gov sign-in
  • 01c Attachment C - SOR Pump Station Detail.pdf

    566 KBAdded in Solicitation version 1Posted
    Requires SAM.gov sign-in
  • 01d. Attachment D-Basis of Design Requirements 7 15 2026.pdf

    945 KBAdded in Solicitation version 1Posted
    Download
  • 01d. Attachment D-Basis of Design Requirements 7 15 2026.docx

    240 KBAdded in Solicitation version 1Posted
    Download
  • 01e. Attachment E - KAFB Low and Medium-Voltage Electrical Design and Equipment Requirements_2025.pdf

    179 KBAdded in Solicitation version 1Posted
    Download
  • 02. Front End Specifications.pdf

    8.2 MBAdded in Solicitation version 1Posted
    Download
  • 03. Blank Form for Contractor_s Proposal.xlsx

    74 KBAdded in Solicitation version 1Posted
    Download
  • 03. Blank Form for Contractor_s Proposal.pdf

    203 KBAdded in Solicitation version 1Posted
    Download
  • 04. DD2345 JCP Guide.pdf

    798 KBAdded in Solicitation version 1Posted
    Download
  • 04a. DD 2345.pdf

    61 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    SOR Waterline Repair

    Notice bcb3a338b50e4e0b806cd84674066819 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    SOR Waterline Repair

    Notice 17890c81ac0d479cbf60beb62be2b7f5 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    SOR Waterline Repair

    Notice b242b75f668b4be0b0eaf2c5ba9e27e2 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    SOR Waterline Repair

    Notice c0a371aef19f4bb69c71ed2ccada3b92 on SAM.gov

  5. 6
    Version 6SolicitationArchivedCurrent

    SOR Waterline Repair

    Notice 5597ff662796412689dd4218dbbe7eda on SAM.gov

  6. 9
    Version 9Award NoticeArchived

    Type changed from Solicitation to Award Notice

    SOR Waterline Repair

    Notice ebe96d777195400284ca247329ba4641 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA940126R0023

Archive Date

Oct 2, 2026

Office Address

KIRTLAND AFB, NM, 87117-0001