GovChime
Notice ID: 0aca6f94a8464936b3c5b0617f2f48c5Award NoticeAwardedArchived

H312--NEW Fire and Smoke Dampers Reinspection and Repair Danville, VAMC

Awarded on April 15, 2026. Full description on SAM.gov.

Awarded tounder 36C25226P0316 (source: SAM.gov award notice)• $13.1K

Overview

Posted
April 15, 2026
Notice type
Award Notice
NAICS
561621: Security Systems Services (except Locksmiths)
Agency
Department of Veterans Affairs

Notice details

Office
252-NETWORK CONTRACT OFFICE 12 (36C252)
Place of performance
VA Illiana Health Care System 1900 E. Main St., Danville, IL, 61832
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov
Award date
Apr 15, 2026
Award amount (SAM.gov award notice)
$13.1K

Identifiers

Solicitation number
36C25226Q0256
Notice ID
0aca6f94a8464936b3c5b0617f2f48c5
Award number (PIID)
36C25226P0316

Description

The Department of Veterans Affairs, Great Lakes Acquisition Center (GLAC) is searching for vendors with the capabilities to provide the reinspection of (53) Fire/Smoke Dampers FSD at the VA Illiana Health Care System (VAIHCS) that were inaccessible or failed during initial inspection. This will be a one-time buy, Firm-fixed price contract. During inspection, if any repairs are needed to dampers which were inaccessible during prior inspection, the vendor will perform those repairs, then perform required inspections to ensure FSDs meet NFPA and Joint Commission requirements. The Contractor shall provide all personnel, equipment, material, parts, software, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for execution of the work to be performed under this Contract. The North American Industry Classification System (NAICS) code for this procurement is 561621. All interested, responsible sources must submit a capability statement by February 12th , 2026 at 9:00 AM CST, to Makena.James@VA.gov to include the following: DUNS number, organization name, organization address, point of contact, business size under NAICS 561621, and socioeconomic status. This Sources Sought is issued solely for information and planning purposes to determine availability of qualified vendors and does not constitute a solicitation. All information received in response to this Sources Sought that is marked as proprietary will be handled accordingly. Please note that this is not a request for proposal and the Government is seeking information for market research purposes only. The Government may or may not issue solicitation documents. Please Look for any further information in Contract Opportunities. Telephone inquiries will not be returned. Please see below SOW for more details.

Full description on SAM.gov

Award Overview

Award Number

36C25226P0316

Award Amount (SAM.gov award notice)

$13.1K

Award Date

Apr 15, 2026

Awardee

Awardee UEI

ZDLJEETX7QQ8

Awardee CAGE Code

30MG1

Awardee Address

LOUISVILLE, KY 40203, KYRGYZSTAN

Original Solicitation

Notice ID: 0aca6f94a8464936b3c5b0617f2f48c5

Posted Date: Apr 15, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Makena James
Contract Specialist

Documents

Files (1)

  • 36C25226P0316_1.docx

    13 KBAdded in Award Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    H312--NEW Fire and Smoke Dampers Reinspection and Repair Danville, VAMC

    Notice 0aca6f94a8464936b3c5b0617f2f48c5 on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeFeb 9, 2026

    H312--Fire and Smoke Dampers Reinspection and Repair One time buy

    Notice 56198070082046108c72d4775394008e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Under Statutory Authority 41 U.S.C. § 1901 the VA Great Lakes Acquisition Center (GLAC) intends to negotiate a sole source contract with Johnson Controls Fire Protection. The contractor shall furnish all labor, material, tools, equipment, supervision, transportation, and expertise to perform Fire/smoke alarm testing and fire suppression systems in accordance with all current regulations to perform service to all fire alarm devices and equipment located at the Captain James A. Lovell Federal Health Care Center. This acquisition is conducted under the authority of 41 U.S.C. § 1901 Simplified acquisition procedures as implemented in RFO 12.102 only one responsible source and no other supplies or services will satisfy agency requirements. This will be a firm fixed price contract for a base plus (4) four option year contract. The NAICS Code is 561621. This Notice of Intent is not a request for competitive quotes. No solicitation documents are available and telephone requests will not be honored. However, if a firm believes it can meet the requirements it must furnish information about its products and services, as well as references from other customers who are using these products and services to the Contracting Officer by 9:00AM LOCAL TIME 10/28/2026. Supporting evidence must be furnished in sufficient detail to demonstrate the ability to comply with the above requirements. Responses received will be evaluated. However, a determination by the Government not to compete the proposed procurement based upon responses to this notice is solely within the discretion of the Government. If no responses are received, the Contracting Officer will proceed with the sole source negotiation with the Johnson Controls Fire Protection. Capability statements shall be submitted by email only as a MS Word or Adobe PDF attachment to Lori Eastmead at Lori Eastmead@va.gov. TELEPHONIC INQUIRIES WILL NOT BE ACCEPTED. STATEMENT OF WORK (SOW) Fire Alarm System Monitoring/ Programming 1. GENERAL Captain James A. Lovell Federal Health Care Center (FHCC), located at 3001 Green Bay Road, North Chicago, IL 60064 requires 24/7 365 Monitoring of Fire alarm and suppression systems. Including, tech labor for programming with monthly visits twice per month. 2. SCOPE The contractor shall furnish all labor, material, tools, equipment, supervision, transportation, and expertise to perform Fire/smoke alarm testing and fire suppression systems in accordance with all current National Fire Protection Agency (NFPA) / The Joint Commission regulations and perform service to all fire alarm devices and equipment to include all devices located at the Captain James A. Lovell Federal Health Care Center. Contractor shall provide service personnel which are certified on a Simplex Grinnell system to include access to proprietary programing to perform service to all Station Fire Systems. 3. PERIOD OF PERFORMANCE The anticipated period of performance, (POP) will include a one (1) year base period, plus four (4) one-year option periods; that are to be exercised at the Government s discretion. 4. CONFORMANCE STANDARDS Contractors shall ensure that the equipment functions in conformance with The Joint Commission Elements of Performance EC.02.03.05, the latest published edition of National Fire Protection Association (NFPA) Codes, Occupational Safety and Health Administration (OSHA), Veterans Administration (VA) standards, International Organization of Standard (ISO) 9000, and manufacturer/industry standards. Must comply with records management guidelines outlined in the following web link https://www.archives.gov/records-mgmt/policy/records-mgmt-language . 5. QUALIFICATIONS Contractor shall provide qualified technicians that shall have at minimum National Institute for Certification in Engineering Technologies (NICET) level II or higher. Contractor shall provide service and monitoring of all fire alarm systems and fire suppression systems on station. The monitoring Contractor must be listed for central station service (UL 827 or FM-approved) and issue a Certificate of Alarm Service to the protected premises. 6. SERVICES TO BE PROVIDED Contractors must provide 24 hours per day, seven (7) days per week monitoring with designated fire department notification upon all alarms. Covers Tech Labor during normal working hours. Contractor shall provide 2 technician scheduled visits a month at facility to provide ongoing service. These visits shall be scheduled to occur on the 2nd Thursday of the month and the last Thursday of the month. This is to ensure even number of visits are spread out to maximize effectiveness. 7. HOURS OF SERVICES A schedule of Technician visits shall be established to be completed during the working hours, Monday through Friday, 7:00 AM Local Time until 3:30 PM Local Local Time to the extent possible. National and Federal Holidays shall be exempt. The service schedule shall be confirmed between the Contractor and Contracting Officer Representative (COR) prior to the first working day of the month. National and Federal Holidays that shall be exempt: New Years' Day Labor Day Martin Luther King, Jr Birthday Columbus Day President s Day Veterans Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day Any other day specifically declared by the President of the United States to be a National or Federal Holiday. When a holiday falls on a Sunday, the following Monday shall be observed as a National or Federal Holiday by U.S. Government agencies. When a holiday falls on a Saturday, the preceding Friday shall be observed as a National or Federal Holiday. 8. DOCUMENTATION The contractor shall provide documentation records upon request in regard to monitoring. Contractor shall provide documentation after every visit to the COR to properly document repairs and history for recordkeeping and Joint commission requirements. 9. PERFORMANCE MONITORING COR shall monitor all documentation to ensure compliance with all regulations and proposals. Any regulation changes or requirements shall be provided to Contractor via email by Contracting Officer Representative or their designee. 10. SECURITY REQUIREMENTS Test and maintenance personnel shall be required to obtain FHCC issued Contractor Identification badges from Building 135 PIV Office. Contractor shall be responsible for keeping the credentials renewed as required. The identification shall be always worn visible while on FHCC property. 11. CHECK-IN/CHECK-OUT The contractor shall check-in with Captain James A. Lovell Federal Health Care Center Controls personnel in Building 188. Contractor shall check-out with Captain James A. Lovell Federal Health Care Center Controls personnel in Building 188 upon completion of services or at the duration of the day, whichever shall be completed first. 12. GOVERNMENT-FURNISHED EQUIPMENT (GFE)/GOVERNMENT-FURNISHED INFORMATION (GFI) No GFE or GFI will be furnished. 13. Key Personnel The contractor shall provide a contract manager who shall be responsible for the performance of work. The name of the designated manager and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager shall have full authority relating to the daily operation of this contract. The contract manager shall be available between 7:00am and 3:30pm Local Time Monday through Friday except for Federal holidays. 14. SERVICE TABLE Service Frequency Number of Inspections per POP Service Month(s) Monitoring for Partitions Monthly Continuous (24/7/365) April, May, June, July, August, September Service Visits Tech Labor Twice a month 2nd Thursday and Last Thursday of the Month April, May, June, July, August, September 15. TABLE 2 INVENTORY OF BUILDINGS a. Medical Buildings Building # Wet System Dry System Fire Pump 131 X X 133 X X X 133CA X X (quantity of 2) X 133EF X 7 X X 11 X X 66 X X b. Long-Term Care Buildings Building # Wet System Dry System Fire Pump 201 X 202 X 205 X 206 X 134 X X X c. General Buildings Building # Wet System Dry System Fire Pump Notes 1 X X Vacant/construction 3 X X 4 X X 5 X X Under construction 6 X X 9 X X 32 X 37 X 46 X X 48 Vacant/construction 92(new fire panel will be installed) X Installation in progress 132 135 X X 138 X 139 X 140 X 187 188 X Co-Gen X Fisher House X 16. SYSTEM MONITORING All buildings listed in tables 2 (a, b, c) require monitoring 24 hours per day, 7 days per week, 365 days per year of all fire systems. The buildings that are under construction are highlighted in red. Building 1 is unoccupied but still needs to maintain life/safety as well as building 48. Building 5 is currently close to completion and will be active in the future. The partition for Building 5 has already been created and will need to be maintained in the monitoring agreement and eventually requires testing once released to FHCC ownership. 17. TYPICAL DISPATCH SCENARIOS FOR ANY ALARM RECEIVED a. Fire Dispatch fire department and notify facility b. Supervisory/Trouble Alarms Notify Facility- do not dispatch Fire Dept. (currently fire dept will be dispatched for supervisory alarms and even some trouble alarms. This is not necessary and common industry standards are notification only.) c. Placing systems on bypass/test A list of approved FHCC staff will be provided and maintained at the COR discretion that will be authorized to call into monitoring. This is to prevent anyone with the password to place a system on test/bypass without FHCC s knowledge and to accurately track the outages and maintain security and safety of the facility. 18. BILLING All invoices submitted shall be detailed in description of work and match the contract line-item totals so that the approval process is straightforward. Services shall be billed as follows: Monitoring shall be billed monthly matching the line items in the contract for schedule of services. It shall list all partitions and buildings covered in one invoice. Labor/service shall be billed monthly and consist of a clear description of services provided and cost matching the contract schedule of line items amounts exactly. This will provide quicker processing of invoices. *Invoices will be rejected if they do not meet the minimum requirements listed. Fire Alarm System Monitoring/ Programming
-Special Notice10/28/2026
The purpose of this amendment is to provide a revised Testing Block One. Please disregard Testing Block-One-10-07-2026 as provided in amendment 0002 and refer to the one attached to this amendment for additional device locations and testing requirements. Attachments " Testing Block-7.1-7.6-10-07-2026" and "Testing Block 7.8-10-07-2026" as provided by amendment 0002 are still valid. Testing must comply with NFPA 25 to fully test the main drain, fire pump and standpipe. No NFPA 25 work exclusions will be permitted. All work listed on the solicitation and detailed in the Statement of Work must be completed and included in the quoted price-any quotation with exclusions will be rejected. Quotes must be received by the contract specialist at stacie.hill@va.gov no later than November 16, 2026 at 10:00 ET. See attachment Price Schedule Revised. See attachment Copy of Testing Block-One-11-04-2026-FINAL
-Solicitation11/16/2026
This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. The NAICS code for this procurement is 56121 - Security system services except locksmiths, PSC H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00. Responses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available. THE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government. The Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below: STATEMENT OF WORK (SOW) Fire Alarm Testing and Inspection 1. Contracting Officer s Representative (COR): TBD 2. Contract Title. Fire Alarm Testing and Inspection 3. Background. The Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. 4. Scope. Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106. Fire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements. Some testing requirements will be met during off-hours or weekends. 5. Specific Tasks. 5.1. Task 1 Annual Testing Provide COR with testing schedule indicating dates of required testing. All Annual testing requirements (except elevator associated devices) will be started and completed in the month of January. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.2. Subtask 2 Semi-Annual Testing Provide COR with testing schedule indicating dates of required testing. All Semi-annual testing requirements will be started and completed in the month of July. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.3. Subtask 3 Quarterly Testing Provide COR with testing schedule indicating dates of required testing. All Quarterly testing requirements will be started and completed in the months of January, April, July, and October. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.4 Subtask 4 Elevator Device Testing All testing requirements for elevator associated devices will be started and completed in the month of February. Inspection reports shall consist of the following: Fire System Generated report identifying First page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up. Pass or Fail for each device Date and time of each device tested Microsoft Excel report Duplicating fire system generated report in well-organized divided sheets Report divided into tabs by device type Tab contents organized by device address First tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up 5.5 Subtask 5 Kitchen Hood Testing Provide COR with testing schedule indicating dates of required testing. Kitchen Hood Testing: Completed two times per year after 7pm M-F, June and December Report on company letterhead contains Company name Date of test Items tested and inspected Pass Fail for each item tested Pass Fail for each exhaust hood Itemized requiring corrective action follow-up 6. Deliverables: Fire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval. SOW Task# Deliverable Title Format Number Calendar Days After Start 1 Site Specific Safety Plan Word - PDF >30 days 2 Annual Testing Schedule Email Word - Excel >30 days 3 Semi-Annual Testing Schedule Email Word Excel >30 days 4 Quarterly Testing Schedule Email Word Excel >30 days 5 Live Testing Schedule Email Word Excel >30 days 6 HVAC Testing Schedule Email Word - Excel >30 days 7 Atrium Smoke Detector Testing Schedule Email Word Excel >30 days 8 Annual Test Report Email PDF - Excel 14 Days 9 Semi-Annual Test Report Email PDF Excel 14 Days 10 Quarterly Test Report Email PDF Excel 14 Days 11 Elevator Device Test Report Email PDF Excel 14 Days 12 Kitchen Hood Test Report Email PDF - Excel 14 Days 7. Contractor Responsibility: Prior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an "as-is" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. This contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC. The SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards. Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System. The existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because of new construction or renovation during the performance period. Quarterly meetings will be conducted with CO, COR, and contractor leadership. Quarterly meetings may be in-person or virtual. Contractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment. At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW. Offerors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact. The awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period. The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes. The Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday. COR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW. COR will ensure inspection reports are completed timely and uploaded into the VA maintenance records. 8. Check In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. 9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required. 9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. 9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation. 10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. 11. VA Information Custodial Language: 11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). 11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated. 12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). No government furnished equipment will be issued to complete the requirements of this contract. 13. Other Pertinent Information or Special Considerations. Louis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas: Cares Tower Main Facility Atrium Women s Health Annex Learning Exchange Parking Garage The fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system. Upgrade project will not be completed within the next 12 months Fire Alarm Reports will come from both systems to be complete. Coordination with fire alarm project will be required to schedule testing. Proof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years. All Annual testing requirements (except elevator associated devices) will be started and completed in the month of January. All testing requirements for elevator associated devices will be started and completed in the month of February. All Semi-annual testing requirements will be started and completed in the month of July. All Quarterly testing requirements will be started and completed in the months of January, April, July, and October. Kitchen Hood Testing: Completed two times per year after 7pm M-F June and December Weekly Fire Pump testing will be completed and documented by VA personnel Testing will require the following to complete: Climbing, bending, crawling Ladder use Vertical Scissor Lift. Lift not supplied by government. Magnet Notifier Keys Canned Smoke Laptop or Tablet to access CLSS Gateway network Any other tools/equipment contractor determines necessary to complete testing VA personnel will assist contactor as needed to complete the following: Gain access to secure areas Locate difficult to find areas. Efforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing. May require after hours or weekend testing to support patient care. Federal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing. Elevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop. Testing requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday) Live Testing: Contractor shall provide requested schedule for required live testing no less than 30 days before required testing month. Live testing will be completed during an identified weekend during the annual testing period. Sundays are preferred testing day for live testing. Pull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility. Pull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month. Pull station testing can be coordinated to be completed over an approved weekend. HVAC duct detector testing: Will be conducted in conjunction with the HVAC shop Testing schedule will be generated in advance and approved by all necessary parties Test results must verify and document the following: Fire damper activates HVAC unit shuts down HVAC unit able to be reset to normal after testing: Yes-No Atrium Smoke Detectors Tested will be conducted on a scheduled Saturday (8 hours) Requires use of scissor lift Contractor will provide lift and lift operator. Ceiling height to atrium smoke detectors is 40 feet. Tamper and Water Flow Testing Under TJC.02.03.05 and NFPA 25 Water Flow devices require quarterly testing (4 times per year January, April, July, October) NFPA 25 requirements include requirements for water to flow during this testing. Must operate flow valve and flow water to activate signal Tamper switches require semiannual testing (2 times per year January and July) At bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC. Contractor must demonstrate access to the following fire alarm system, vendor support and parts procurement: Notifier Dealer Notifier programming capability Notifier parts Notifier technical support Gateway / CLSS Testing reports generated through CLSS gateway at no additional cost to the government Parking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking. a. Identification of Possible Follow-on Work. Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. b. Identification of Potential Conflicts of Interest (COI). None c. Identification of Non-Disclosure Requirements. Not Applicable d. Packaging, Packing and Shipping Instructions. None e. Inspection and Acceptance Criteria. Contractor will be responsible for meeting all inspection and timelines listed in this SOW. 14. Risk Control Work performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility. 15. Place of Performance. Louis Stokes VA Medical Center 10701 East Blvd Cleveland, Ohio 44106 16. Period of Performance. Base Year: A date of award for duration of. 365 calendar days & 4 Option Years
-Market Research10/30/2026
The Richard L Roudebush VA Medical Center has a requirement to inspect, maintain and provide minor repairs to both the electrical and mechanical portions of the fire alarm and suppression systems located in the main hospital building and several out-buildings on the campus of the medical center and at the Cold Springs Road remote site.
-Pre-Solicitation10/14/2026
-Special Notice10/06/2026

Additional Details

Solicitation Number

36C25226Q0256

Archive Date

May 5, 2026

Office Address

MILWAUKEE, WI, 53214