GovChime
Notice ID: 564337b517d94b1ab14c2b47e62b221dCombined Synopsis/Solicitation

California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

Responses closed . Full description on SAM.gov.

Overview

Response deadline
4:30 PM PDT
Posted
April 23, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Place of performance
Vallejo, California, 94592
PSC
Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12363N23Q4035
Notice ID
564337b517d94b1ab14c2b47e62b221d

Description

12363N23Q4035

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart  12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and proposals are being requested.


PROJECT DESCRIPTION: California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

The California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement is a National BPA that will consist of a variety of work including both Road Maintenance service types of work and Road Construction types of work. The BPA will have a period of performance from early spring 2023 through March 2033 and can be utilized on all California Federal Forests and Grasslands and is available for all federal agencies to utilize. This solicitation is issued as a request for quotation (RFQ). This solicitation will remain Open and Continuous to add vendors when determined necessary for the 10-year period it is active. Make sure your firm is updated and registered in the System for Award Management system (SAM) and current to conduct government business. Due to recent storm damage, emergency repairs are necessary to repair road infrastructure and we expect to issue calls before the closing date. As vendors are being evaluated for zones, we may issue call orders to early offerors before the due date.

Please read the entire solicitation thoroughly to ensure all requirements in your response are included. 

PROJECT LOCATION: Projects shall covers the state of California including the following forests; Angeles, Cleveland, Eldorado, Humboldt-Toiyabe, Inyo, Klamath, Lake Tahoe Basin Management Unit, Lassen, Los Padres, Mendocino, Modoc, Plumas, San Bernardino, Sequoia, Shasta-Trinity, Sierra, Six Rivers, Stanislaus, and Tahoe National Forests and Butte Valley National Grassland. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky.

Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around March 15, 2023. Engineering point of contact is Douglas Anderson, telephone: (707) 373-6265. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business.

ALL QUOTES SHALL BE EMAILED TO:

chad.bullock@usda.gov; james.kaminski@usda.gov & B_01_QU.r8ld7xo1wy1sggsv@u.box.com on or BEFORE MARCH 15, 2023, 4:30 PM PACIFIC TIME.

All documents will be submitted electronically; follow this naming convention for your 2 attachments

California FERM-VendorName-Quote     AND        California FERM-VendorName-Technical.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (29)

  • Amendment 1.pdf

    411 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Award Notice for SAM Updated V1.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Award Notice for SAM.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • WD Ventura.pdf

    151 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Svc Statewide.pdf

    60 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Tulare.pdf

    141 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD San Luis O.pdf

    156 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD San Bern.pdf

    154 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD San Diego.pdf

    163 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Santa Barb.pdf

    152 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Riverside.pdf

    149 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Multi 1.pdf

    373 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Multi 2.pdf

    244 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Orange.pdf

    160 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD DHLM.pdf

    145 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD LA.pdf

    160 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Inyo Kern Mono.pdf

    165 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • WD Imperial.pdf

    152 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Single Lane Gate Detail.pdf

    197 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Rolling Dip Typical.pdf

    17 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Region 5 2021 Road Maintenance Specs.pdf

    1.2 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • R5 FERM Spec Descriptions_Assumptions.pdf

    154 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Pre Bid Inquiries.pdf

    151 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Fire Plan 2022.pdf

    268 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Earthen Barricade Typical.pdf

    80 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 840-2 INSTALL (1).pdf

    447 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 840-2 DRAWING.pdf

    188 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • CA FERM Quote Package.pdf

    478 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • CA FERM BPA.pdf

    892 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

    Notice 779b377795704eefacca47a1b604d20e on SAM.gov

  2. 2
    Version 2Combined Synopsis/Solicitation

    California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

    Notice 6be47146b6384f5ea2ece9ee26636395 on SAM.gov

  3. 3
    Version 3Combined Synopsis/Solicitation

    California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

    Notice 8daff637e2b14e8a924db23f53366171 on SAM.gov

  4. 4
    Version 4Combined Synopsis/Solicitation

    California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

    Notice 4dbbe24f73114001b9a49b5ef45663dc on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationCurrent

    California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

    Notice 564337b517d94b1ab14c2b47e62b221d on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

12363N23Q4035

Archive Date

Feb 14, 2033

Office Address

Washington, DC, 202501138