GovChime
Notice ID: 57bbb388a13948ceb47d8dfb2994953cAward NoticeAwarded

Monroe Harbor Advanced Maintenance Dredging

Awarded on February 18, 2026. Full description on SAM.gov.

Awarded tounder W911XK26CA007 (source: SAM.gov award notice)• $2.6M

Overview

Posted
February 19, 2026
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST DETROIT.W072 ENDIST DETROIT
Place of performance
48162
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Feb 18, 2026
Award amount (SAM.gov award notice)
$2.6M

Identifiers

Solicitation number
W911XK26CA007
Notice ID
57bbb388a13948ceb47d8dfb2994953c
Award number (PIID)
W911XK26CA007

Description

Award from Solicitation No. W911XK26BA013 for the Monroe Harbor Advanced Maintenance Dredging (AMD) project.

Full description on SAM.gov

Award Overview

Award Number

W911XK26CA007

Award Amount (SAM.gov award notice)

$2.6M

Award Date

Feb 18, 2026

Awardee

Awardee UEI

YRGTDQLHAH26

Awardee CAGE Code

5Y029

Awardee Address

629 N MAIN ST, CHEBOYGAN, MI 49721, UNITED STATES

Original Solicitation

Notice ID: 57bbb388a13948ceb47d8dfb2994953c

Posted Date: Feb 19, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W912P426FA032
    MORRISH-WALLACE CONSTRUCTION, INC.
    Department of DefenseNAICS 237990
    $5.3MSigned Aug 6, 2026
  • W912P426DA005
    MORRISH-WALLACE CONSTRUCTION, INC.
    Department of DefenseNAICS 237990
    —Signed Aug 3, 2026
  • W912P426FA027
    MORRISH-WALLACE CONSTRUCTION, INC.
    Department of DefenseNAICS 237990
    $628.0KSigned Jul 22, 2026
  • W912P626DA004
    MORRISH-WALLACE CONSTRUCTION, INC.
    Department of DefenseNAICS 237990
    —Signed Jul 20, 2026
  • W912P423D0007
    MORRISH-WALLACE CONSTRUCTION, INC.
    Department of DefenseNAICS 237990
    —Signed Jul 20, 2026

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • Bid Abstract - Monroe AMD (Final).pdf

    273 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    Monroe Harbor Advanced Maintenance Dredging

    Notice d527c64a431c47e49db0a14a7f9be825 on SAM.gov

  2. 2
    Version 2Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    Monroe Harbor Advanced Maintenance Dredging

    Notice 57bbb388a13948ceb47d8dfb2994953c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
FY25 Lexington Harbor Maintenance Dredging. Mobilize to Lexington, Michigan and dredge the federal navigation channel as indicated in the contract drawings and specifications. Place dredged material as indicated in the contract drawings and specifications. Demobilize when dredging work is completed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
100%
AwardedOpen
***Bid abstract has been posted.*** FY25 Lexington Harbor Maintenance Dredging. Mobilize to Lexington, Michigan and dredge the federal navigation channel as indicated in the contract drawings and specifications. Place dredged material as indicated in the contract drawings and specifications. Demobilize when dredging work is completed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
100%
Solicitation03/26/2026
Award from Solicitation No. W911XK26BA009 for the Alpena Harbor Maintenance Dredging
100%
AwardedOpen
***Posting of Bid Abstract***Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.
100%
Solicitation01/21/2026
****Amendment 0002 is posted****Amendment 0001 is posted****This project includes Mobilize dredge to both St. Joseph Outer Harbor, located in Berrien County, MI and Holland Outer Harbor, located in Ottawa County, MI. St. Joseph Outer Dredge will take place within the stationing: -25+00 to -14+00. Nearshore Placement the in the 8?-12? contour. Holland Outer Dredge will take place within the stationing: -14+00 to -8+50. Nearshore Placement the in the 8?-12? contour. Demobilize when dredging work at both harbors is completed
96%
Solicitation12/18/2025

Additional Details

Solicitation Number

W911XK26CA007

Archive Date

Feb 19, 2027

Office Address

DETROIT, MI, 48226-5000