GovChime

M--RTP Facilities Operations and Maintenance located at EPA Research Triangle Park

Overview

Posted
April 23, 2026
Notice type
Presolicitation

Notice details

Office
CONSTRUCTION, FINANCE, ADMINISTRATIVE & IA DIVISION
Place of performance
US Environmental Protection Agency, Research Triangle Park, North Carolina, 27709
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
68HERF26R0010
Notice ID
a9e7d06c6e5d492fa4de4e727002ba3d

Description

Facilities Operations, Maintenance and Support Services for U.S. EPA Facilities at Research Triangle Park (RTP), North Carolina

The United States Environmental Protection Agency (EPA), Research Triangle Park (RTP) Facilities located at 109 T.W. Alexander Drive, RTP, NC 27711 has a requirement for facilities, maintenance and support services. The Government anticipates the award of a Firm Fixed Priced type contract (with a fixed price redetermination retrospective contract line item, a cost reimbursement contract line item and three IDIQ line items) with a twelve-month base period and four (4) twelve-month option periods.

The EPA's facilities on the RTP Campus consists of 1.3 million square feet of offices, laboratories, computer and conference spaces, and child care facilities. The EPA RTP facilities are classified as a Centers for Disease Control (CDC) Bio- Safety Level II Research Facility and AAALAC (Association for Assessment and Accreditation of Laboratory Animal care International) facilities.

The purpose is to provide facilities operations, maintenance and support services for the U.S. EPA RTP facilities on a twenty-four hour, seven days a week basis. The Contractor shall provide all management, training, licensed personnel, tools, and labor necessary to perform all functions, operations, and tasks, in accordance with all applicable industry performance standards, to include but not be limited to, National, state and local codes; OSHA regulations; Federal specifications; EPA facility standards; and EPA-RTP policies and procedures. The Contractor shall establish, implement, and maintain facilities management services that are responsive to the Government’s stewardship. The Contractor is expected to maintain an acute awareness of the quality, efficiency, and cost effectiveness of all services to be provided with a continuing emphasis on devising and developing better methods and/or procedures to enhance the ability of OCSFO-RTP to meet the needs of its clients. The Government envisions the O&M Contract to be divided into three (3) primary areas and consists of Base Contract Requirements, Standing Task Orders, and Task Orders.

The Fixed Priced Base Contract requirements include all routine and predictable services such as Building Automation System operations, Facility Trouble Desk, Administrative Support, Program Management Support, Key Personnel, Quality Management, and the Preventative Maintenance Program.

The ID/IQ efforts on the contract are issued via task orders for the required services, subject to the Service Contract Labor Standards (SCLS) / Collective Bargaining Agreement (CBA) or for construction services subject to the Construction Wage Rate Requirements Statute (CWRRS).

The successful contractor of any resultant contract will be expected to provide all necessary labor, materials, and services in support of the efforts delineated by the Performance Work Statement (PWS). The DRAFT PWS is attached with this notice.

This acquisition is being conducted as a full and open competition with no small business set-aside(s), all responsible offerors may submit a proposal. The requirement will be awarded using FAR part 15 procedures. The North American Industry Classification System (NAICS) code is 561210 (Facilities Support Services) with a size standard of $47 Million.

It is anticipated that the solicitation will be posted on the www.FedConnect.net website on or about May 11, 2026. Point of contact for this requirement is Amber Hawkins, Contract Specialist, at Hawkins.amber@epa.gov.

The solicitation 68HERF26R0010 will be available for downloading at FedConnect® located at the following internet address: www.fedconnect.net. Questions relating to the solicitation are required to be submitted electronically through FedConnect®. ONLY those questions posted through FedConnect® will be accepted. All responses to questions will be released on FedConnect®. At this Internet site you will be able to register with FedConnect®, enabling you to download the solicitation once released, join the mailing list, and to submit questions. If you need technical assistance in registering or for any other FedConnect® function, call the FedConnect® Help Desk at (800) 899-6665 or email at support@fedconnect.net.

Contractor registration in the Government’s System for Award Management (SAM) is required in order to be eligible for contract award. Registration may be completed and information regarding the registration process may be obtained at http://www.sam.gov. Once issued, solicitation documents will be available electronically for download at https://www.fedconnect.net. Hard copies of the solicitation package will not be distributed. Electronic copies of responses will be required and must be submitted via FedConnect® (https://www.fedconnect.net).

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Sep 30, 2026

NAICS

561210

Agency

Environmental Protection Agency

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1PresolicitationCurrent

    M--RTP Facilities Operations and Maintenance located at EPA Research Triangle Park

    Notice a9e7d06c6e5d492fa4de4e727002ba3d on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeJan 22, 2026

    Sources Sought (EPA – RTP Facility Maintenance and Support Services)

    Notice 9bd506ac38e4429e801f59286c647399 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (JOFOC) Research Triangle Park (RTP) Facilities Operations & Maintenance Support Services Proposed Action: To execute the six-month contract extension pursuant FAR 52.217-8 Option to Extend Services (October 1, 2026 - March 31, 2027). Statutory Authority: 41 U.S.C. 3304(a)(1) - only one responsible source (RFO FAR 6.103-1) 1. Agency and contracting activity U.S. Environmental Protection Agency, Office of Acquisition Solutions, Construction, Finance, Administrative and Interagency Agreements Division (CFAIAD), Construction, A/E Branch, Section 1 (Regions 1-4), Cincinnati, Ohio. 2. The nature and description of the actions being approved The purpose of this justification for other than full and open competition is to execute the extension of services clause pursuant to FAR 52.217-8 that was not evaluated as part of the original contract award. Contract 68HERD21D0001 is a single-award indefinite-delivery / indefinite-quantity (ID/IQ) hybrid contract (RFO FAR Subpart 16.5) for operations and maintenance of the EPA Research Triangle Park campus. Contract Number: 68HERD21D0001 Contractor: VGS Infrastructure Services, Inc. UEI: M3F3BNAJHDN5 Estimated dollar amount of the modification: REDACTED The estimated dollar amount of the modification is depicted in the table below:(REDACTED/See Attached) 3. A description of the supplies or services required to meet the agency’s needs The Agency requires continuation of operations and maintenance support services (facility repair, replacement, and construction) on a twenty-four-hour, seven-day-a-week basis at RTP facilities provided both on the basic contract and under existing task orders that have schedules extending beyond the current completion date of the contract. This includes providing comprehensive management, training, licensed personnel with facility access, tools, and labor necessary to perform all functions, operations, and tasks. Specific critical areas of the PWS are the routine inspection and monitoring of the facility infrastructure, including electrical, plumbing, and HVAC systems. Maintaining the building automation systems (BAS) controls. Emergency response preparedness, such as backup power, fire protection system maintenance, chemical spills, water damage/leaks, and inclement weather. Without ongoing support for these functions, the risks to personnel health, government property, and ongoing research would be unacceptable. Please refer to the attached contract performance work statement for a complete description of the support required under the contract. 4. Statutory authority 41 U.S.C. 3304(a)(1) - the supplies or services are available from only one responsible source, and no other supplies or services will satisfy agency requirements, as implemented at RFO FAR 6.103-1 (the successor to FAR 6.302-1 under the Revolutionary FAR Overhaul, adopted at EPA by class deviation IPN 25-06 / RFO-2025-06). 5. A statement demonstrating the unique qualifications of the contractor or the nature of the actions requiring use of authority Due to the critical nature of the RTP facilities operation and maintenance support services provided via this contract, a lapse in services cannot occur. Any interruptions to the services required to maintain buildings on the campus that house active laboratories present unacceptable operational and safety risks to the Agency and employees who occupy these spaces. In accordance with FAR 52.217-8, because the six-month extension was not evaluated in the initial competition, the Government does not treat its exercise as pre-competed and instead justifies it here as available from only one responsible source. Only the current contractor, VGS Infrastructure Services, Inc., can provide uninterrupted continuation of the required services. VGS infrastructure Services, Inc, possesses the necessary site clearances, staffing, infrastructure, and institutional knowledge necessary to continue to support and execute the contract requirements for the short period of time authorized under FAR 52.217-8, until a follow-on contract is awarded. Securing these critical support services from an alternative source would require the execution of a competitive procurement process that cannot be awarded before the current contract period of performance expiration on September 30, 2026. No other source can complete the in-progress tasks/services under the current orders and any other source would be required to begin the work again. Furthermore, re-procuring the unfinished balance of non-severable services that are currently underway under existing task orders issued pursuant to the ID/IQ portion of the contract, is not feasible and would result in the termination of these tasks for the Government’s convenience, the need to reprocure unfinished construction projects with divided design responsibility, duplicated mobilization expense, and warranty fragmentation on installed equipment. Another contractor would need to obtain the necessary site-security clearances which would result in months of unacceptable delays on systems serving active laboratories. The costs incurred by the Government to reprocure this requirement before the current expiration date are not in the best interest of the Government and would likely exceed the price of the contemplated extension. The requested extension is for a six-month period, priced at the contract’s existing competed rates, which were previously negotiated and determined fair and reasonable. 6. A description of efforts to ensure that offers were solicited from as many potential sources as possible, including whether a notice was or will be publicized as required by FAR Part 5 and, if not, which exception under Part 5 applies. A Notice of Intent for Sole Source Modification was posted on SAM.gov on August 27, 2026, and closed on September 11, 2026. No sources other than the current contractor were solicited due to the Government’s need to maintain uninterrupted continuation of the incumbent’s services. Moreover, by its own terms, FAR 52.217-8 applies only to the current contractor. The underlying contract was placed under the competitive procedures applicable at award and FAR 52.217-8 was included in the solicitation for the contract. Therefore, potential offerors were on notice that EPA might exercise the option. 7. The anticipated dollar value and a determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable The Contracting Officer determines the anticipated cost associated with this extension to be fair and reasonable. The extension costs are based on the contractor’s existing Option Period IV pricing for a total increase of (Redacted) for the six-month extension period. In accordance with 52.217-8, it is noted there may be potential for variance subject to any adjustments the Department of Labor issues to the prevailing labor rates. 8. The market research conducted and the results or a statement of the reason market reach was not conducted. Formal market research for this action was not conducted, as market research would not result in an alternative source of service. Extensive market research has been conducted relative to the follow-on acquisition in accordance with RFO FAR 10.001 and the follow-on contract will be competed as full and open competition. 9. Any other facts supporting the use of other than full and open competition a) Basis for Exercise of FAR 52.217-8. At the time of contract award, the Government did not request or receive pricing associated with the FAR 52.217-8 six-month extension, and therefore it was not evaluated. Consistent with GAO’s treatment of unevaluated options, the Government therefore does not rely on the option’s pre-competed status. It instead justifies the extension under 41 U.S.C. 3304(a)(1) as available from only one responsible source. The procedural requirements for exercising the clause have otherwise been satisfied. Written preliminary notice of the Government’s intent to extend was furnished to the contractor on July 20, 2026 - seventy-two days before the current period ends on September 30, 2026 - and was acknowledged by the contractor the same day. The exercise will be executed by unilateral modification before the current period expires. The six-month extension exhausts the clause. No further extension is available under FAR 52.217-8. b) Period. The six-month extension period aligns with the procurement schedule. Acquisition planning for the follow-on procurement was temporarily halted due to the departure of personnel whose roles were essential to the procurement process which necessitated adjustments to the procurement strategy. This extension will allow for the needed transition phase-in/phase-out period from the current incumbent contract to the new successor contract. Because O&M services support vital EPA building infrastructures, the transition is critical to prevent operational disruptions. 10. A listing of the sources that expressed, in writing, an interest in the acquisition No additional sources have expressed an interest in performing these services and as explained above, no other source could practicably provide the required services under a six-month bridge. Sources interested in the follow-on requirement will be able to compete under the follow-on acquisition. 11. A statement of the actions the agency may take to remove or overcome barriers to competition before any subsequent acquisition. The Government’s continuing requirement will be satisfied through a competitive follow-on acquisition, which is currently in the acquisition planning phase. Market research will be conducted in accordance with RFO FAR 10.001. It is anticipated that the recurring severable services will be transitioned to the follow-on vehicle no later than March 31, 2027. The requested extension will not extend the incumbent’s ordering rights or impede competition for the re-procurement effort.
97%
Sole Source / J&AOpen
This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of 8(a) small business firms for a potential Government requirement which the Government intends to compete as a competitive 8(a). NO SOLICITATION IS AVAILABLE. Requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE:The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for facilities and utilities maintenance services at U.S. Army Military Ocean Terminal Concord (MOTCO) in Concord, California. USACE SPKs intent is to solicit and award a competitive 8(a) small business requirement.Project Description: This is a non-personal services project to provide Facilities and Utilities Maintenance at U.S. Army Military Ocean Terminal Concord (MOTCO) across the following functional areas: Maintenance Management Services, Electrical Plants and Distribution Systems, Water Distribution Systems, Wastewater Systems, Stormwater Systems, Fire Protection Systems, Buildings and Structures and Installed Equipment, Pest Management, Roads and paved surfaces, Pier Maintenance and various miscellaneous maintenance requirements, and repair requirements including minor construction in accordance with the Performance Work Statement. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items, and non-personal services. The Contractor is fully responsible for provisioning all parts required to execute both Preventive Maintenance Orders (PMOs) and Demand Maintenance Orders (DMOs). The potential requirement may result in a firm-fixed-price solicitation with a 6-month or 12-month to include one month Phase-in Period for the base period with four 1-year option periods. The Government intends to issue the solicitation on or around November 2026. If solicited, the Government intends to award the anticipated requirement by approximately June 2027. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 561210, Facilities Support Services. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $47,000,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be M1AZ, Operation of Other Administrative Facilities and Service Buildings.Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements.CAPABILITY STATEMENT:Industry is highly encouraged to fill out the market survey form at: MOTCO Facilities and Utilities Maintenance Services - Prefilled formResponses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted or the capability statements received. Please provide responses with the above link or submit questions by e-mail to the Contract Specialist, Melita Doyle, at (Melita.S.Doyle@usace.army.mil) by 1400 / 2:00 P.M. (Pacific Time) 08 October 2026. Please include the Sources Sought Notice number W9123826X1CDK in the e-mail subject line.
65%
Market Research10/08/2026
T-BOS Acquisition Update–19 Aug 2026: Notice of Scope Revision and Strategic Procurement Pause The 764th Enterprise Sourcing Squadron is issuing this update to inform industry of a significant scope revision and subsequent schedule delay for the Türkiye Base Operating Support (T-BOS) acquisition. 1. Cancellation of Current Descoping Actions / Restoration of Current Requirement Following the conclusion of mediation between the U.S. Government and the Turkish labor union (Türk Harb-İş) regarding the new 2-year Collective Labor Agreement (CLA), the Government made a strategic decision to continue all BOS functions as a consolidated requirement. The previously announced strategy to immediately descope approximately 175 Full-Time Equivalent (FTE) positions from the core T-BOS solicitation has been cancelled 2. Impact on Local Contract Actions The 39th Contracting Squadron (39 CONS) at Incirlik AB is currently in the process of formally cancelling the four associated local contract actions and solicitations for these services. All offerors and awardees involved in those local 39 CONS actions will receive separate, direct communications from their respective Contracting Officers. 3. Schedule Impact and Next Steps Because this scope restoration fundamentally alters the PWS, the baseline cost data, and the evaluation criteria previously published in the Draft RFP, the Final RFP will not be released this month as originally projected. The Government will reconvene an Acquisition Strategy Panel (ASP) to thoroughly review the impact of these changes on the overall procurement strategy. Industry partners should anticipate a strategic pause of approximately 90 to 120 days. During this time, the Government will revise the PWS, and sanitized cost baseline estimates to reflect the newly signed CLA. Once an updated plan is formally approved, the Government will post an additional update to outline the revised acquisition strategy, define the future procurement pathway, and publish a new milestone schedule. As part of this comprehensive reassessment, the Government may also issue supplemental requests for information or conduct additional market research to ensure our final approach aligns with current market capabilities. We appreciate the significant time and resources industry has already invested in reviewing our previous draft documents. We remain committed to maximizing transparency as we adapt to these emergent operational realities. John S. McLaurin Contracting Officer 764th Enterprise Sourcing Squadron AF Installation Contracting Center (AFICC) Ramstein AB, DE Subject: T-BOS Draft RFP Update - Workforce Baseline Clarification Description of Update: The Government has updated the Government-Provided Information (GPI) Workforce Baseline package to provide additional information and clarity on the unionized workforce. Summary of Changes: Added CLA Labor Category Sheet: The Government has added a new sheet titled "CLA Labor Category Apr 2026". This sheet maps the total monthly direct labor costs directly to the universal Union Labor Categories (e.g., TN 01, TN 04) Presolicitation / Draft Request for Proposal (RFP) PROJECT TITLE: Türkiye Base Operating Support (T-BOS) Services 1. INTRODUCTION & APPRECIATION TO INDUSTRY The Department of the Air Force, 764th Enterprise Sourcing Squadron (764 ESS), wishes to thank our Industry partners for their robust participation and valuable input during the Market Research and capability assessment phases over the past year. Your feedback has been instrumental in shaping this requirement. The Government is now issuing this Draft Request for Proposal (RFP) for the Türkiye Base Operating Support (T-BOS) contract. The purpose of this posting is to provide the final draft solicitation documents to Industry for review, comment, and question submission prior to the release of the official RFP. 2. IMPORTANT NOTICE: COLLECTIVE LABOR AGREEMENT (CLA) STATUS Prospective Offerors are advised that the next iteration of the Türk Harb-İş Collective Labor Agreement (CLA) is currently under bilateral negotiation between the Host Nation and applicable labor authorities, and has not yet been finalized. As stated in the draft Section L (Instructions to Offerors, Paragraph L.4.2.2), Offerors shall base their current reviews, questions, and initial pricing strategies on the existing 2024-2026 CLA (and its active 27 Sep 2025 Addendum) provided in the attachments below. Once the new CLA is finalized and executed, the Government will formally incorporate the updated CLA, wage rates, and benefits tables into the official solicitation via a formal RFP Amendment. 3. DRAFT SOLICITATION ATTACHMENTS The following documents are attached to this notice for Industry review: Draft Solicitation (FA5641-26-R-0005): Standard Form 33 and contract clauses/provisions. T-BOS Draft Performance Work Statement (PWS): Dated 17 July 2026. Activated Services Matrix- This excel lists sheet the PWS paragraphs that are activated in the PWS by location Instructions to Offerors (Section L) & Evaluation Criteria (Section M): Provided as separate documents for ease of review; these will be incorporated directly into the final official solicitation. T-BOS Technical Data Package (ZIP File): Contains historical workload data, Government-Furnished Property (GFP) listings, and other critical operational data. 2024-2026 Türk Harb-İş Collective Labor Agreement (CLA): The current, active labor agreement. CLA Addendum: Dated 27 September 2025. T-BOS Workforce Baseline (Excel): Provides necessary workforce cost and demographic data regarding the incumbent unionized workforce. 4. SUBMISSION OF QUESTIONS AND COMMENTS Industry is highly encouraged to review the attached drafts and submit questions, comments, or recommended improvements. Deadline: All questions and comments must be submitted no later than Monday, 27 July 2026, at 16:00 Central European Summer Time (CEST). Submission Method: Please submit all questions using the Solicitation Question and Comment Form included in the attachments directly to the Point of Contacts (POCs) listed on this notice. The Multi-Functional Team (MFT) will review and consider all questions and recommended improvements for incorporation into the final solicitation. The Government expects to release the final, official RFP within one month of this posting. 5. DISCLAIMER This posting is a Draft RFP issued solely for informational and planning purposes. It does not constitute a formal Request for Proposal (RFP) or a promise to issue a formal RFP in the future. This draft solicitation does not commit the U.S. Government to contract for any supply or service whatsoever. The Government will not pay for any information or administrative costs incurred in response to this Draft RFP. All costs associated with responding to this notice will be solely at the interested party's expense.
64%
Pre-Solicitation11/01/2026
The Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson, is issuing a solicitation for a contractor to provide Base Operations Support Services at the U.S. Army Fort Carson, CO.Description of Services:The Contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. Work includes all required maintenance, labor, materials and repairs to facilities, structures, buildings, and utilities that are classified as real property, and Army Training and Evaluation Center non-real properties, unless otherwise stated in this contract, to include installed building equipment as defined in Army Regulation (AR) 420-1, Army Facilities Management. The following is a list of Common Level of Services (CLS) that will be included in this acquisition: CLS Service Title 404 Grounds Maintenance 408 Pavement Clearance 411 Facility Maintenance - Vertical 420 Facility Maintenance - Horizontal 501 Heating and Cooling Services 503 Wastewater Services Update as of 11 MAY 2026: The Government is working through Source Selection processes. Please continue to monitor Sam.gov for further updates. __________________________________________________ Update as of APR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of MAR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _______________________________________________________ Update as of 26 FEB 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ________________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 2 DEC 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 15 SEP 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of AUG 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 10 JUL 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 18 JUN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 7 APR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 6 MAR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 17 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 DEC 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 26 NOV 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 5 Nov 2024: The Source Selection Evaluation Board is still in progress. _______________________________________________________________ Update as of 5 Aug 2024: The Government is reviewing proposals and conducting Preaward Debriefs. _______________________________________________________________ Update 17 June 2024: Amendment 0002 is attached along with responses to questions submitted by industry, updated attachments, and updates to Section L. ________________________________________________________________ Update 24 MAY 2024: Amendment 0001 is attached along with responses to questions submitted by industry, updated technical exhibits, and attachments. _________________________________________________________________ Update 23 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 28 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov. Currently the Government is projecting the solicition due date as being 28 June 2024. _______________________________________________________________ Update 15 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 20 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov.
64%
Solicitation06/28/2024
NOTICE UPDATE: Draft T-BOS Solicitation Released on 17 July 2026 Please be advised that the Draft Request for Proposal (RFP) has officially been released under a new solicitation number (FA5641-26-R-0005) Interested parties are highly encouraged to navigate to the new notice and click "Follow" to receive future notifications. Link to the new T-BOS Draft RFP Posting: https://sam.gov/workspace/contract/opp/88388155629a4a7da16b5243c1091c08/view ----------------- Amendment 8: AQUISITION UPDATE (01 July 2026): Notice of Procurement Pause – Spain Base Operating Support (S-BOS) Notice to Industry: The 764th Enterprise Sourcing Squadron has determined it is in the best interest of the Government to pause the Spain Base Operating Support (S-BOS) acquisition for approximately twelve (12) months. This strategic pause is necessary to sequence programmatic milestones and prioritize the concurrent Türkiye Base Operating Support (T-BOS) acquisition effort. As a result of this pause, the projected performance start date for the S-BOS contract will shift from January 2028 to January 2029. The Government anticipates releasing the formal RFP for S-BOS in Summer 2027. Please note that this action constitutes a temporary pause, not a cancellation, of the S-BOS requirement. The official communication for the T-BOS requirement can be found at the link below. While this T-S BOS SAM forum will remain active, the requirement, documents and information specific to the T-BOS requirement will be posted on the T-BOS announcement. https://sam.gov/workspace/contract/opp/4c66da2ed0174edda0813864aeaf8b55/view The Government sincerely appreciates the significant time, effort, and high-quality feedback our industry partners have provided thus far. Your dedication has tangibly improved the requirements. Industry partners are advised that the foundational S-BOS framework, including the Performance Work Statement, CLIN structure, contract type, and overall acquisition strategy, will remain substantially unchanged when the procurement resumes. The Government plans to conduct an additional Industry Day/Site Visit closer to the revised RFP release date to ensure all interested offerors are fully briefed on the finalized requirements. All future updates regarding S-BOS will continue to be posted to this SAM.gov notice. Thank you for your continued interest in supporting the United States Air Force mission in Spain. John S. McLaurin Contracting Officer 764th Enterprise Sourcing Sq Ramstein AB, DE ___________________________________________________________________________________________ Amendment 7: AQUISITION UPDATE (03 June 2026): Release of T-BOS pre-RFP site visit documents 1. PURPOSE This acquisition update is provided to all potential offerors for the Türkiye Base Operations Support (T-BOS) requirement. In the interest of transparency and to facilitate early industry feedback, the Government is releasing the slides for the briefings held during the site visit as well as relevant pictures taken during the site visit. 2. DOCUMENTS RELEASED Attachment 21: Incirlik Site Visit Briefing 3. IMPORTANT NOTES FOR OFFERORS Controlled Unclassified Information (CUI): Several of the attachments to this notice are marked as CUI. Access to these documents is restricted. Interested parties must be certified in SAM.gov and must request access to the controlled documents via the SAM.gov notice. Requests will be validated prior to the granting of access. ____________________________________________________________________________________________________ Amendment 6: AQUISITION UPDATE – (16 May 2026) – FINAL DRAFT ACQUISITION UPDATE T-S BOS ACQUISITION 1. PURPOSE & STRATEGIC UPDATE This amendment is provided to all potential offerors for the upcoming Türkiye Base Operations Support (T-BOS) and Spain Base Operations Support (S-BOS) acquisitions. In the interest of continued transparency, and as a result of extensive, valuable feedback from industry, the Government is releasing final draft versions of several key solicitation documents. This release is intended to provide maximum insight into the acquisition strategy and to facilitate offeror preparation prior to the formal release of the final Request for Proposals (RFPs). Please be advised of the following updates to the acquisition schedule: A. New, Separate SAM.gov Postings: While this current notice will remain active for historical purposes, the final RFPs for each requirement will be posted under new, separate, and unique SAM.gov notices. Offerors must monitor SAM.gov for these new, specific solicitations. B. Anticipated RFP Release Dates: The S-BOS (Spain) RFP is forecast for release on or about 15 June 2026. The T-BOS (Türkiye) RFP is forecast for release on or about 30 June 2026. 2.0 DOCUMENTS RELEASED The following DRAFT documents are attached to this notice for industry review: Attachment 14: Draft Performance Work Statement (PWS) - T-S BOS (15 May 2026): This is the most current version of the PWS, containing standardized language applicable to both locations. Attachment 15: DRAFT Section L "Instructions to Offerors" (Spain-Specific): This draft is tailored to the S-BOS requirement but will be used with minimal changes for the T-BOS acquisition. Attachment 16: DRAFT Section M "Evaluation Factors for Award" (Spain-Specific): This draft is tailored to the S-BOS requirement but will be used with minimal changes for the T-BOS acquisition. Attachment 17: DRAFT H-Clause - Liquidated Damages for Key Personnel: This is a revised version of a special contract clause that the Government intends to include in both solicitations. It has been updated based on previous industry feedback. Attachment 18: Türkiye Civil Engineer Maintenance Report: An Excel spreadsheet listing all maintenance items accomplished and documented in the NexGen IT system since 1 January 2025. Attachment 19: T-S BOS Real Property Listing: An Excel workbook detailing all USAF Real Property (e.g., building numbers, square footage, age) for both BOS locations. Attachment 20: Draft CLIN structure for S-BOS requirement. T-BOS structure will look similar adjusted to the requirements IAW the final PWS. 3.0 IMPORTANT NOTES FOR OFFERORS All Documents are DRAFTS: The attached documents are for informational and market research purposes only and are subject to change prior to the release of the final RFPs. The Government is not seeking proposals at this time and will not respond to questions regarding these draft documents. Controlled Unclassified Information (CUI): Several of the attachments to this notice are marked as CUI. Access to these documents is restricted. Interested parties must be certified in SAM.gov and must request access to the controlled documents via the SAM.gov notice. Requests will be validated prior to the granting of access. 4.0 CONCLUSION OF MARKET RESEARCH This release represents the final pre-solicitation communication from the Government. The extensive, iterative market research process for this acquisition is now concluded. The Government thanks all industry partners for their invaluable participation, time, and expertise. Your feedback has been instrumental in shaping a more resilient and competitive acquisition strategy. 5.0 SITE VISIT DETAILS FOR T-BOS AT INCIRLIK AIR BASE Arrival Date: 20 May 2026 Time: 1100 AM (Attendees must arrive 180 minutes prior for processing) Meeting Point: Incirlik AB, Main Gate Required ID: All attendees must present the same valid, government-issued photo ID that was submitted with their registration. Names must match exactly. For Turkish Nationals ONLY: All attendees must provide the following additional documents to receive base access: Genel Bilgi Toplama (GBT) from a Turkish Police Station Adli Sicil Kaydi (Criminal Background Check) from Turkish Authorities/eDevlet Social Security Information Kimlik ______________________________________________________________________________________________ Amendment 5: AQUISITION UPDATE (22 Apr 2026): Release of S-BOS pre-RFP site visit briefing slides and attendees list. Schedule Update for the Türkiye (T) BOS pre-RFP site visit. 1. PURPOSE This acquisition update is provided to all potential offerors for the Spain Base Operations Support (S-BOS) requirement. In the interest of transparency and to facilitate early industry feedback, the Government is releasing the slides for the briefings held during the site visit as well as the site visit attendees list. 2. DOCUMENTS RELEASED Attachment 11: Site Visit Attendees List Attachment 12: 496 ABS Mission Brief dated 15 April 2026 Attachment 13: 496 CE Flight Brief dated 15 April 2026 3. ACCESS REQUIREMENTS Vendors wishing to access these documents must submit a formal request. To be granted access, the request must include an explicit statement confirming that the vendor is authorized to receive Controlled Unclassified Information (CUI) and possesses the capability to safeguard the information in accordance with (IAW) DoDI 5200.48 and all applicable NIST standards. Requests lacking this affirmation will be denied. 4. Türkiye Site Visit Schedule Update The upcoming site visit in Türkiye has been rescheduled and will now take place on 20 - 21 May 2026. Registration Status: All previously submitted registrations for the Türkiye site visit remain valid and will be honored for the new dates. Please note that the Government is not accepting additional registration packages for this event. 5. CONCLUSION The Government is providing this information in the spirit of transparency to foster a more competitive environment. All potential offerors should continue to monitor this official SAM.gov posting for all future updates. ____________________________________________________________________________________________________ Amendment 4: AQUISITION UPDATE (10Apr 2026): Release of Draft PWS and Evaluation Criteria for Spain BOS 1. PURPOSE This acquisition update is provided to all potential offerors for the Spain Base Operations Support (S-BOS) requirement. In the interest of transparency and to facilitate early industry feedback, the Government is releasing several key draft documents from the forthcoming solicitation. This release is intended to provide greater insight into the requirement and evaluation strategy in advance of the S-BOS Site Visit scheduled for 15 April 2026. 2. DOCUMENTS RELEASED The following DRAFT documents are attached to this notice for industry review and comment: Attachment 7: Draft Performance Work Statement (PWS) - Spain BOS. This is the most current draft of the PWS for the Morón Air Base requirement. Attachment 8: Draft Section M, Factor 1 - Past Performance and Section M, Factor 2 - Technical (Partial). This document contains the complete, detailed draft criteria for the Past Performance evaluation, including definitions for Recency, Relevancy, and the evaluation of Joint Venture and the draft evaluation criteria for Subfactor 1 - Program Leadership/Staffing & Continuity only. The criteria for Subfactor 2 will be released at a later date. Attachment 9: Draft H-Clause - Liquidated Damages for Key Personnel. This is a draft of a special contract clause that the Government intends to include in both the Spain and Türkiye solicitations to address key personnel vacancies. 3. IMPORTANT NOTES FOR OFFERORS All Documents are DRAFTS: The attached documents are for informational and market research purposes only and are subject to change prior to the release of the final Request for Proposal (RFP). The Government is not seeking proposals at this time. RFP Release Date: The anticipated release date for the final RFP has been updated to on or around 01 June 2026. Spain Site Visit: The site visit for the Spain (S-BOS) requirement at Morón AB is still scheduled to proceed on 15 April 2026. 4. REQUEST FOR INDUSTRY FEEDBACK The Government is committed to a collaborative process and encourages all potential offerors to review these draft documents thoroughly. Your feedback is critical to helping us refine and improve the final solicitation. All questions or recommendations regarding the attached documents should be submitted via email to the points of contact no later than 17:00 CET on 22 April 2026. 5. CONCLUSION The Government is providing this information in the spirit of transparency to foster a more competitive environment. All potential offerors should continue to monitor this official SAM.gov posting for all future updates. ___________________________________________________________________________________________________ Amendment 3: Subject: SPECIAL NOTICE - 12 March 2026: Postponement of Türkiye Site Visit for T-S BOS Acquisition 1. PURPOSE: This notice is to inform all potential offerors of a schedule change for the Türkiye Base Operations Support (T-S BOS) site visit. Please note this change only affects the Türkiye visit. The site visit for the Spain (S-BOS) requirement at Morón AB will proceed as originally scheduled. 2. REASON FOR POSTPONEMENT Due to evolving regional events, and in consideration of industry partner expenses, the Government has determined it is prudent to postpone the Türkiye site visit 3. NEW SCHEDULE FOR TÜRKIYE SITE VISIT New Dates: 19 - 20 May 2026 Location: Incirlik Air Base, Türkiye All other details regarding the visit remain the same unless otherwise specified in a future notice. 4. INSTRUCTIONS FOR REGISTERED VENDORS The registration period for the Türkiye site visit is now closed. For all vendors who successfully registered and submitted the required documentation prior to the original deadline, your registration remains valid for the new dates (19-20 May 2026). No further action or resubmission of documents is required from you at this time. If this schedule change impacts your ability to attend, please contact the Points of Contact (POCs) listed in the original announcement. No new or late registrations for the Türkiye site visit will be accepted. 5. WAY FORWARD The site visit for Spain at Morón AB will still occur as scheduled. All potential offerors should continue to monitor this official SAM.gov posting for any further updates. All inquiries related to this notice should be directed to the POCs listed in the original announcement. ------------------------------------------------------------------------------------------------------------- Amendment 2, dated 04 Mar 2026 1. Purpose of this Amendment: To provide interested parties with presentation slides for the TSBOS requirement. These materials were briefed by the Contracting Officer at the Europe Tri-Services Regional Summit - "SAME" conference in Frankfurt, Germany on March 4, 2026. 2. Context: These slides are being posted to provide additional background information to all potential offerors in advance of the upcoming pre-RFP site visit and the eventual release of the solicitation. 3. Disclaimer: This presentation is for informational purposes only. The information contained herein is preliminary and subject to modification. It does not constitute a Request for Proposal (RFP). The definitive requirements will be stated in the official RFP document, which will supersede any and all information provided in these slides. 4. All other information in the original notice, including details of the pre-RFP site visit, remains unchanged. Amendment 1, dated 26 Feb 2026 SPECIAL NOTICE: Pre-RFP Site Visits for Türkiye (T-BOS) AND Spain (S-BOS) Acquisitions GENERAL: The U.S. Government will host two separate pre-proposal site visits: one for the Türkiye Base Operations Support (T-BOS) requirement and one for the Spain Base Operations Support (S-BOS) requirement. This notice contains details for both events. Interested vendors must identify the specific site visit they wish to attend and follow the distinct registration instructions for that location. Firms may attend one or both events but must register for each separately. This is not an RFP. The Government is not liable for any costs incurred by attendees. SITE VIST AT-A-GLANCE Event Türkiye Site Visit (T-BOS) Spain Site Visit (S-BOS) Location: Incirlik Air Base, Türkiye Móron Air Base, Spain Dates: 21 - 22 April 2026 15 April 2026 Registration Deadline: 06 March 2026, 1400 CET (Firm) SECTION A: TÜRKİYE (T-BOS) SITE VISIT - REGISTRATION & DETAILS ACTION REQUIRED: Failure to complete these steps by the deadline will result in denial of base access. Step 1: Submit Registration via email. Email the Primary and Secondary POCs listed below no later than 06 March 2026, 1400 CET Subject Line: T-BOS Site Visit Registration: [Your Company Name] Step 2: Provide Attendee Information (max 2 per company) For each representative, include the following in the body of your e-mail: Full Name Company Name & Attendee Title Nationality Email Address & Phone Number Scanned copy of Passport/ID Card (must be a valid, government-issued photo ID) Completed registration package IAW attached guidance. Submit Required Forms via email to the two POCs listed below: All attendees must complete and sign the documents relevant to the individual’s category (see attachment 1 e.g. “Short-Term DOD Contractors & Non-DOD: Contractors, Civilians and Vendors” or “Turkish Contractors / Vendors “) and attachment 2. Only complete package will be processed to request access to Incirlik, AB. Failure to submit a complete package will result in exclusion of the event. SITE VISIT DETAILS: Arrival Date: 21 April 2026 Time: 1100 AM (Attendees must arrive 180 minutes prior for processing) Meeting Point: Incirlik AB, Main Gate Required ID: All attendees must present the same valid, government-issued photo ID that was submitted with their registration. Names must match exactly. SECTION B: SPAIN (S-BOS) SITE VISIT - REGISTRATION & DETAILS Step 1: Submit Registration via email: Email the Primary and Secondary POCs listed below no later than 06 March 2026, 1400 CET Subject Line: S-BOS Site Visit Registration: [Your Company Name] Step 2 For each representative, include the following in the body of your e-mail: Full Name Company Name & Attendee Title Nationality Email Address & Phone Number Scanned copy of Passport/ID Card (must be a valid, government-issued photo ID) Completed registration package IAW attached guidance. Submit Required Forms via email to the two POCs listed below: All attendees must complete and sign the documents relevant to the individual’s category Only complete package will be processed to request access to Incirlik, AB. Failure to submit a complete package will result in exclusion of the event. SITE VISIT DETAILS: Arrival Date: 15 April 2026 Time: 0900 AM (Attendees must arrive 90 minutes prior for processing) Meeting Point: Móron AB, Main Gate Parking Lot Required ID: All attendees must present the same valid, government-issued photo ID that was submitted with their registration. Names must match exactly. RULES AND RESTRICTIONS: Photography/Videography: Photography and Videography are strictly prohibited unless specifically authorized by the on-site contracting officer Electronic Devices: The use of personal electronic devices, including cell phones, laptops and smartwatches, may be restricted in certain areas. Questions: Questions may be submitted in writing prior to the site visit or asked during the designated question-and-answer portion of the tour. All questions and official answers will be posted on SAM.gov as an amendment to this notice. POINTS OF CONTACT (POCs) All inquiries related to this announcement shall be directed to the following POCs: Primary Point of Contact: John S. McLaurin Contracting Officer John.mclaurin.1@us.af.mil Secondary Point of Contact: Christin Buck Contract Specialist Christin.buck.de@us.af.mil Attachments (Türkiye) 1. Attachment 1 - TurAF requirements for Gate Access to Incirlik AB.docx 2. Attachment 2 - Digital Temporary Gate Pass Application.pdf Attachments (Spanish National Contractors) 1. Attachment 3 – Copy of TABLAACCESOStranslated.xlsx Attachments (Foreign National Contractors in Spain) 1. Attachment 4 – 03 CCR Temporary Pass Form (2023).xlsx 2. Attachment 5 – 05 CCR Certificate Insurance Form.docx 3. Attachment 6 – 06 CCR Insurance Companies.docx USAFE BOS ACQUISITION PROGRAM Update to Industry 28 January 2026 SUBJECT: Industry Update #2 on the Turkey-Spain (T-S) Base Operations Support (BOS) Acquisitions 1. Purpose: This notice provides an update to the acquisition strategy for the T-S BOS requirements previously discussed in the industry update posted on 17 April 2025. This acquisition will replace contract FA5641-20-D-0009 referred to as the United States Air Forces in Europe - Air Forces Africa Base Operations Support (UABOS) Services Contract. The Air Force Acquisition team appreciates the valuable feedback received from industry during our one-on-one market research sessions. Your feedback has been instrumental in refining our approach and remains essential in shaping this future requirement as we move forward. 2. Acquisition Strategy Revision: A) Separation of Türkiye and Spain BOS requirements: Based on extensive market research and analysis, the Government has determined it will contractually separate the current combined requirement. The revised strategy is to simultaneously issue two RFPs and award two independent contracts: Base Operating Support (BOS) services in Türkiye (T-BOS) Base Operating Support (BOS) services at Morón Air Base, Spain (S-BOS) To the maximum extent practicable, the Government intends to use identical acquisition timelines, proposal instructions, evaluation criteria, and source selection methodologies for both solicitations. This parallel approach is specifically designed to reduce the administrative burden and proposal preparation costs for offerors who choose to compete for both contracts. While the acquisition structures will be aligned, the decision to separate the requirements allows the Government to tailor the specific contract terms and Performance Work Statements to the unique operational and economic dynamics of each location. B) Scope Reduction for Türkiye BOS (T-BOS) Requirement Following extensive market research on the capability of local Turkish Service Providers and an assessment of local acquisition capabilities, the Government will remove the following five functions from the future T-BOS requirement: Full Food Services/Dining Hall Operations Custodial/Housekeeping Grounds Maintenance/Landscaping Golf Course Maintenance Refuse Services at the Ankara Support Facility The USAF intends to transition these capabilities from the current UABOS to a local service providers prior to the end of the current BOS contract. The 39th Air Base Wing at Incirlik Air Base has been designated requirement owner and the 39th Contracting Squadron is the responsible acquisition organization for these five discrete requirements. Interested parties in these specific requirements should contact the 39th Contracting SQ for additional information and should monitor SAM.gov for solicitations issued by the 39th Contracting Squadron. 3. Projected Acquisition Timelines: The following timeline is tentative and subject to change. All official dates will be published in the formal RFP announcements. Solicitation Issuance: 1 May 2026 Site Visits: Site visits for both the Türkiye and Spain locations will be scheduled in close proximity to the RFP release date. The Government intends to conduct these visits on consecutive days to facilitate travel between locations, though the order of the visits has not yet been determined. Participation will be limited to a maximum of two representatives per company. Prospective offerors are advised that both locations have strict and lengthy entry approval requirements for foreign nationals. Once submitted, attendee information cannot be changed. Detailed instructions will be provided in the formal site visit announcement. Proposal Due Date: A minimum of 60 calendar days will be afforded for proposal submission. Contract Award: As soon as practicable in Calendar Year 2027. Full Performance Start: No later than 28 January 2028, preceded by a 60-day transition period. To ease the start-up burden, the Government reserves the right to stagger the full performance start dates for Spain and Türkiye Contract Type and Duration: The Government currently envisions both the T-BOS and S-BOS contracts to be Indefinite Delivery, Indefinite Quantity (IDIQ) vehicles. The pricing structure will primarily consist of Firm-Fixed-Price (FFP) Contract Line Item Numbers (CLINs) for the core BOS functions, supplemented by Cost-Reimbursable CLINs for materials, travel, unscheduled work, mission changes, and other direct costs, and future labor adjustments. S-BOS (Spain) contract: Three-year base with four 12-month Options (7 years) T-BOS (Türkiye) contract: Due to the unique economic risks associated with labor and currency volatility, the Government anticipates a contract with a three-year base and two 12-month Options (5 years). 4. Union Labor Agreements: Collective Labor Agreements: The efforts require any prospective provider manage their local national workforce IAW Host Nation labor law, social security, employment tax laws and the terms and adhere to the conditions of the Collective Labor Agreements (CLA) for Türkiye and Spain, including all available wage and benefit schedules: For the Türkiye (T-BOS) requirement, the successor contractor is required by CLA to initially assume predecessor’s workforce. The U.S. Government (USAFE-AFAFRICA/A1K) reserves the right to negotiate the CLA directly on behalf of the contractor. If this right is exercised, the contractor will provide all necessary administrative support to the U.S. Government during the CLA negotiations. For the Spain (S-BOS) requirement, the successor contractor is required to initially assume the predecessor’s workforce. The contractor is responsible for negotiating its own company-level agreement with the union. This negotiation is economically influenced by minimum wage legislation and applicable CLAs that are declared universally applicable in the sector or region. The Government's reserves the right to provide oversight, guidance, and as needed maximum financial bargaining parameters Key Spain Considerations: Offerors are advised that the Morón Air Base workforce is subject to a company-level Collective Labor Agreement (CLA). While this agreement is currently being renegotiated, the Government will provide the final, binding version with the RFP. Based on the current historical agreements, offerors should anticipate the following critical cost drivers: Mandatory Workforce Inheritance: The successor contractor is required to inherit the incumbent workforce and all their existing employment terms, including seniority and salary. Fixed Wage Increases: The agreement dictates mandatory wage increases. For the prior three years, employees were granted increases of 3.00% (2022), 3.00% (2023), and 2.75% (2024). The current CLA applicable to Spain is under renegotiation and will be provided when available. Employer Provided To/From work transportation: The CLA requires the employer to provide transportation to and from the worksite for all employees via established bus routes. Comprehensive Fringe Benefits: The CLA mandates a complex portfolio of supplemental payments that constitute a significant portion of the total labor cost. These include, but are not limited to, a mandatory employer-funded pension plan, longevity bonuses, a distance-from-work bonus, and shift differentials. Key Türkiye Considerations: The Türkiye workforce is subject to a unique, multi-employer CLA. The USG simultaneously negotiates three CLAs with similar conditions - one for each enterprise. The enterprises are 39ABW, AAFES, and the Primary Base Operating Support contract The successor BOS contractor will be required to adopt and adhere to the terms of this CLA. This agreement creates a "dual risk" environment of high local inflation and currency fluctuation. Critical cost drivers include Mandatory Workforce Inheritance: The successor contractor is required by Turkish Labor Law (Law No. 4857, Article 6) and the terms of the existing CLA (Article 37) to inherit the entire incumbent workforce and their associated rights, obligations, and seniority Automatic Cost Escalation (High Inflation Risk): The CLA mandates semiannual wage and benefit increases every April and October. These increases are tied directly to the Türkiye-wide General Consumer Price Index published by the Statistics Agency of Türkiye; which under the current contract, has resulted in annual cost growth exceeding 50%. Comprehensive Benefit Packages: The mandated percentage increases apply not only to base wages but to the entire compensation package, including annual bonuses, social benefits (e.g., heating, clothing, food allowances), and other subsidies (e.g., child, birth, and funeral) Employer Provided To/From work transportation: The CLA requires the employer to provide transportation to and from the worksite for all employees Currency Fluctuation Risk: The contract is priced and paid in U.S. Dollars (USD), but all Turkish Direct labor costs are incurred in Turkish Lira (TRY), creating significant financial risk due to the volatility of the exchange rate. 5. Hyper Inflation in Türkiye and impact of Direct Labor Cost: The CLA in Türkiye mandates compounding, semi-annual increases to wages and benefits, driven by an established "betterment" rate plus the national rate of inflation. Over the life of the current contract, the compounding effect of these increases, coupled with hyper-inflation, has resulted in a cumulative increase of more than 800 percent in the Turkish Lira-denominated cost of Turkish Direct Labor. It is critical to note that this 800% increase applies only to this specific portion of the contract's cost structure, not to the total contract price. This extreme and uncontrollable cost growth is the primary driver behind the Government's need to implement the new CLAC risk-mitigation clause. To address this significant and uncontrollable cost risk on the future Firm-Fixed-Price (FFP) contract, the Government has developed a unique EPA clause, currently designated as "H-1, Combined Labor and Currency Clause" (C-LAC), a draft of which is provided with this update. This clause is designed to fairly share risk and provide budget stability for both parties. The C-LAC mechanism operates by creating a single, integrated price adjustment every six months to correspond with the required semi-annual CLA wage and fringe benefit increases. The core of the clause is a “ledger" system. The process is as follows: The formula first calculates the net financial impact of two opposing economic forces: the mandatory, CLA-driven labor inflation, and the savings from a strengthening USD Both POSITIVE credits to the Government and NEGATIVE costs are calculated semi-annually. The resulting balance of the Government-held CLAC ledger is then formally documented via a no-cost administrative modification to the contract. In the case of a semi-annual “positive credit” where currency savings are greater than labor inflation (a positive financial benefit to the provider), no funds would be obligated or deobligated. If the result is a NEGATIVE cost to the Government (i.e., labor inflation is greater than currency savings), the cost is first paid by subtracting any existing balance on the CLAC ledger. A subsequent task order modification to provide funding is executed against the task order only if the balance on the running ledger is depleted and there is a remaining shortfall. This refined ledger system ensures the contractor is protected from uncontrollable inflation while guaranteeing the Government receives the full benefit of favorable currency movements in a way that is administratively efficient and avoids problematic contractor reimbursement actions. The Government invites all prospective offerors to review the draft CLAC H-clause and provide feedback. We are particularly interested in your responses to the following questions: On the Turkish Labor Component (TLC): A key input to the CLAC formula is the "Turkish Labor Component," or TLC. This is a single, fixed percentage that represents the portion of the contract's fixed price CLINs attributable only to Turkish National direct labor costs. To ensure a fair and level competition where all offerors use the same baseline, the Government's strategy is to mandate this TLC percentage in the final RFP, based on our market research indicating a realistic rate of approximately 55%. From your perspective, does this Government-mandated approach provide the predictability and clarity needed to develop a competitive proposal without adding unnecessary risk contingency? On Pre-Performance Currency Risk: The contract baseline for currency (the BCER) will be set at the start of performance in January 2028. We recognize this creates an 18-month gap of currency risk between proposal submission and the start of performance. How does your firm typically approach pricing for this specific type of pre-performance currency fluctuation risk on a FFP contract? 6. Accessing Draft Documents and Points of Contact: Documents Available for Review: To foster transparency and gather feedback, the Government is releasing a series of draft documents with this notice. These documents are considered Source Selection Information and access to them is controlled. The available documents include The draft H-1 Combined Labor and Currency Clause (C-LAC) The current Collective Labor Agreements for Türkiye and for Moron Air Base including current wage and benefit schedules. Note that the current CLAs expire on 1 April 2026. The most current versions will be released with the RFP Draft Workload Estimates (Spain only) Informational Brochures on the Social Security Programs Base Maps for Moron AB and Incirlik AB Instructions for Accessing Controlled Documents: Interested parties must request access to these documents directly through the SAM.gov system. The process is as follows: Log in to your official SAM.gov account Navigate to this announcement page Locate the "Attachments/Links" section Click the "Request Access" button next to the listed documents You will be prompted to provide a brief justification for your request. Please state your company's name and your intent to review the documents as a potential prime or subcontractor for this requirement Approval Process: Once your request is submitted, the Government Contracting Officers will review it. Upon approval, you will receive an automated email notification from SAM.gov granting your account access to view and download the documents directly from the site. This system provides a secure and auditable record of all requests and approvals. The official points of contact for this acquisition are the Contracting Officers, Mr. John S. McLaurin, at john.mclaurin.1@us.af.mil, and Ms. Christin Buck, at christin.buck.de@us.af.mil
63%
Market Research05/25/2026

Additional Details

Solicitation Number

68HERF26R0010

Archive Date

Oct 31, 2026

Office Address

Durham, NC, 27709