GovChime
Notice ID: 5988a90b5fb94514a89cebc7362a22b5Solicitation

Design-Build Services – STM Security Fencing - North Boundary

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MST
Posted
October 22, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of Energy

Notice details

Office
ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR
Place of performance
Golden, Colorado, 80401
PSC
5660: FENCING, FENCES, GATES AND COMPONENTS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
RFP-2027-27107
Notice ID
5988a90b5fb94514a89cebc7362a22b5

Description

This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.

Project Overview

The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.

Design‑Build Requirements

The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.

Construction Requirements

All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.

Management, Coordination, and Quality Assurance

The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Construction Inbox

Documents

Files (3)

  • AMENDMENT NO. 1 - RFP-2027-27107.pdf

    187 KBAdded in Solicitation version 3Posted
    Download
  • 0 - RFP-2027-27107 - STM Security Fencing- North Boundary - LPTA.pdf

    304 KBAdded in Solicitation version 2Posted
    Download
  • SAM Post Narrative - STM North Boundary Fencing.pdf

    158 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    Design-Build Services – STM Security Fencing - North Boundary

    Notice 2fa822e893384a93bccb65cb8ac7aea4 on SAM.gov

  2. 2
    Version 2Solicitation

    Design-Build Services – STM Security Fencing - North Boundary

    Notice 02fdc748f70d471abfba3cc6f8ac5a06 on SAM.gov

  3. 3
    Version 3SolicitationCurrent

    Design-Build Services – STM Security Fencing - North Boundary

    Notice 5988a90b5fb94514a89cebc7362a22b5 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

RFP-2027-27107

Archive Date

Nov 26, 2026

Office Address

Golden, CO, 80402