GovChime
Notice ID: 5cc099a662c74ba1a59532a34d6f03e2Sources Sought

Commercial Gear Backup Power (CGBP) and Control System Improvements at Fish Barrier

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CST
Posted
November 10, 2026
Notice type
Sources Sought
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST CHICAGO.W072 ENDIST CHICAGO
Place of performance
Romeoville, IL , 60446
PSC
Z2MZ: REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
Last updated
Nov 10, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912P627MR027755
Notice ID
5cc099a662c74ba1a59532a34d6f03e2

Description

I. PURPOSE AND DISCLAIMER**********************The U.S. Army Corps of Engineers (USACE), Chicago District, is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for upgrading our Commercial Gear Backup Power (CGBP) and associated control system at our electronic fish barrier located in Romeoville, Illinois. We are seeking to identify qualified Small Business concerns (including 8(a), HUBZone, SDVOSB, WOSB, and Small Business Joint Ventures/Teaming Arrangements) and Other-Than-Small Business concerns capable of performing this requirement. The intention is to procure these services on a competitive basis.**********************BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES (IN FULL OR IN PART) OR PROCURED THROUGH FULL AND OPEN COMPETITION, and multiple awards MAY be made. All Small Business Set-Aside categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions.**********************DISCLAIMER**********************THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMMATION PERTAINING TO THIS REQUIREMENT. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise as a result of a response to this Sources Sought.********************************************II. COMPREHENSIVE TECHNICAL DESCRIPTION and PROJECT SCOPE********************************************The Chicago Sanitary and Ship Canal (CSSC) Electric Dispersal Barrier facility requires a complex industrial electrical power generation, backup power, and automation and control system modernization project. This system is a critical component of the federal effort to prevent the movement of invasive aquatic species between the Great Lakes and Mississippi River basins. **********************Specifically, USACE needs to upgrade the backup generator and switchgear control systems at Permanent Barrier 1 (PB1) to correct unreliable operation caused by deficiencies in the original design, configuration, and wiring. The project requires replacing generator controllers, modernizing breaker controls and communications, and rebuilding the control software and operator interfaces to improve reliable operation on utility and backup power. Work will require testing, operator training, and a phased changeover to maintain continuous barrier operations. Work will be performed at an active, mission-critical facility requiring careful coordination with ongoing operations, planned equipment outages, and system changeovers to maintain operational readiness and minimize disruptions. A critical requirement is the integration of new equipment into an active industrial facility while protecting existing operations. The anticipated work may include engineering, design review, equipment upgrades and replacement, control system programming, integration, testing, and commissioning of interconnected electrical and industrial automation systems. ******************************************************************TECHNICAL CAPABILITIES:******************************************************************The project requires specialized expertise in: a) generator synchronization and load management, b) switchgear automation, c) protective relaying, d) programmable logic controllers (PLCs), e) human-machine interfaces (HMIs), industrial communications, and associated monitoring and data management systems.**********************Contractors must possess the technical capabilities necessary to work with the existing systems and integrate new equipment while maintaining compatibility and functionality. The existing facility incorporates Rockwell Automation ControlLogix PLCs, FactoryTalk View SE, FactoryTalk Transaction Manager, Microsoft SQL Server, Basler generator synchronization and control equipment, Schweitzer Engineering Laboratories (SEL) protective relays and RTAC equipment, and DEIF generator controllers. ATTACHMENT NOTICE: Interested parties must carefully review Attachment 1 (Equipment_SOW.xlsx PB1 Equipment Modernization and SOW Matrix) attached to this notice in PIEE, the DoW Procurement Integrated Enterprise Environment, which details the specific equipment removals, modifications, additions, hard-wired control conversions, I/O transitions, and as-built drawing updates (across four separate contractor drawing sets) required under our anticipated scope.**********************Contractors must demonstrate their capability of obtaining a specialized Master Systems Integrator (MSI) or Industrial Automation and Control Systems (IACS) engineering firm to perform any needed engineering, programming, integration, testing, commissioning, and troubleshooting of the complex interconnected industrial control systems.**********************Contractors must demonstrate their ability to obtain qualified personnel. Qualified personnel include Electrical Generating Systems Association (EGSA) certified technicians or personnel possessing equivalent documented qualifications to support generator-related engineering, design reviews, integration, testing, and commissioning. If proposing to use equivalent, provide what documentation your firm considers as equivalent for USACE consideration.**********************The contractor must possess the technical and organizational capabilities to execute phased modifications, coordinate authorized shutdowns and system changeovers, implement temporary control arrangements where necessary, perform pre-commissioning and acceptance testing, and develop contingency measures to minimize operational disruptions and maintain the safety, reliability, and continuity of existing barrier operations.**********************III. REQUESTED INFORMATION FROM INTERESTED PARTIES********************************************Interested firms are invited to submit a Capability Statement (not to exceed 10 pages) addressing the following four (4) sections after reviewing the technical capability narrative above and Attachment 1 (Equipment_SOW.xlsx):SECTION A: ADMINISTRATIVE AND BUSINESS SIZE********************************************1. Company Name, Address, Point of Contact, telephone number and email, CAGE Code, and Unique Entity Identifier (UEI).**********************2. Business Size under NAICS 238210 ($19.0M Size Standard) and all applicable socioeconomic designations.**********************3. If proposing as a Small Business, confirm your understanding of FAR 52.219-14 (Limitations on Subcontracting) and your ability to perform at least 25% of the cost of contract performance (excluding the cost of materials) with your own organization or similarly situated small business entities. **********************4. Should this requirement be solicited as Full and Open Competition, other-than-small-business offerors will be required to submit an acceptable Small Business Subcontracting Plan in accordance with RFO 19.109 and FAR 52.219-9, as applicable. All respondents are asked to: a) Describe your experience meeting small business subcontracting goals on comparable construction or modernization projects, b) Identify potential subcontracting opportunities for small businesses within the attached scope of work, c)Provide preliminary estimated subcontracting percentages by socioeconomic category (e.g., WOSB, SDVOSB, HUBZone, SDB), and d) Identify anticipated challenges and strategies to maximize small business participation during execution.**********************SECTION B: TECHNICAL AND INTEGRATION EXPERIENCE********************************************1. TECHNICAL CAPABILITIES. Tailored capability statements addressing the particulars of this effort under the technical capabilities section above, with appropriate documentation supporting claims of organizational and staff capability. Detail what specific technical skills does your company possess which ensure capability to perform the tasks. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements, as well as experience of managing similar teams in the past.********************2. EQUIPMENT LIST REVIEW: Confirm your firm has reviewed Attachment 1 (Equipment_SOW.xlsx) and describe up to three (3) comparable projects executed within the past seven (7) years involving turnkey switchgear/generator control remediation, hard-wired relay conversions, and multi-vendor integration (Rockwell ControlLogix, SEL Relays/RTAC, Basler, and FactoryTalk View SE). Clearly delineate whether experience is based upon the prime, or any proposed subcontractors.**********************3. CERTIFICATIONS AND QUALIFICATIONS: Confirm your proposed teams compliance with the EGSA certification requirement or identify the equivalent documented qualifications your personnel possess to support this scope. Identify whether your proposed lead personnel hold: (a) Control Systems PE Licensure, (b) EGSA Certification, or (c) CSIA/Rockwell Integrator Certification.**********************4. PHASED CUTOVER AND FAT: Describe your firms capability to perform Factory Acceptance Testing (FAT), simulation prior to site delivery and execute a phased cutover at an active 24hr, 7day a week facility without unplanned outages.**********************SECTION C: COMMERCIAL SOLUTIONS AND LEAD-TIME********************************************1. COMMERCIAL SOLUTIONS: Based on your review of Attachment 1, identify what commercial solutions or minor modifications are available in the marketplace to meet these functional requirements.**********************2. ESTIMATED LEAD-TIME: Provide an estimated lead-time required to procure the necessary hardware components and complete the on-site upgrades, testing, drawing updates, and commissioning.********************************************IV. INSTRUCTIONS FOR RESPONSE SUBMISSION**********************Please submit capability packages electronically through the PIEE Solicitations Portal or via email to the designated Point of Contact by December 2, 2026, at 1:00 PM CST. Your response to this Sources Sought, including any capabilities statement, shall be electronically submitted to the Contract Specialist, Jane Doe, in either Microsoft Word or Portable Document Format (PDF). All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government.**********************The Government will evaluate market information to ascertain potential market capacity to: 1) provide services consistent, in scope and scale, with those described in this notice and otherwise anticipated; 2) secure and apply the full range of corporate financial, human capital, and technical resources required to successfully perform similar requirements; 3) implement a successful project management plan. **********************All questions must be submitted to the contract specialist.

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    Commercial Gear Backup Power (CGBP) and Control System Improvements at Fish Barrier

    Notice 5cc099a662c74ba1a59532a34d6f03e2 on SAM.gov

Similar Opportunities

Title
Phase
Deadline
Notice of Intent to Sole Source for Fish Barrier North Light Mast RepairsIn compliance with FAR Subpart 13.106-1(b) and 13.501(a) (1)(i) coupled with the provisions set forth by FAR Subpart 5.101(a)(1), this Notice is hereby published to inform of the following:The USACE Chicago District intends to award a sole source contract to ROSO CONSTRUCTION INC. (CAGE: 9P1L1). This requirement is for the following:The U.S. Army Corps of Engineers needs to repair a light mast at the Aquatic Nuisance Species Dispersal Barrier in Lockport, IL. They initially contracted Roso Construction Inc. to do similar work. During that time, they discovered additional issues. They tried to modify the existing contract with Roso to cover the new repairs, but system issues caused a delay, and by the time they were resolved, the contract had already expired. To ensure the light mast is fixed quickly and safely, and to avoid potential operational disruptions at the barrier, they are awarding a new sole-source contract to Roso Construction Inc. Roso is already familiar with the equipment, the site, and the safety procedures because of the previous contract, making them the most efficient option.The Government intends to negotiate solely with Roso Construction Inc. under the authority of FAR 13.106-1(b), Only One Source being reasonably available to meet the Government?s needs. Far Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures, apply. The North American Industrial Classification System (NAICS) Code will be 238210, the size standard will be $19.0M dollars and the Product Service Code (PSC) will be J059.Please be advised the aforementioned information is anticipatory in nature and is not binding.THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE QUOTES and no solicitation will be issued; however, any responsible source believing that it can fulfill the requirement may be considered by the agency. Interested parties may identify their interest and capabilities in response to this synopsis and must clearly show the firm?s ability to be responsive without compromising the quality, accuracy, and reliability of services provided. A determination by the Government not to compete the proposal contract based upon responses to this notice is solely within the discretion of the Government.All Correspondence in conjunction with this notice shall be submitted via e-mail only to the Government points of contact (POC) identified below by Noon Central Time on Dec 3, 2025.All responding vendors must be registered to the System for Award Management (SAM). Information can be found at https://sam.gov. Complete SAM registration means a registered DUNS and CAGE code numbers.Primary POC: Jim Parizek, Contract Specialist, Email: James.P.Parizek@usace.army.milSecondary POC: Sam Stiles, Contracting Officer, Email: Samantha.L.Stiles@usace.army.milContracting Office: U.S. Army Corps of Engineers, Chicago District, 231 South LaSalle Street, Suite 1500, Chicago, IL 60604-1437.
Special Notice12/04/2025
657A5-26-111, Triennial Electrical Testing
Solicitation11/13/2026
The Department of Veterans Affairs is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in, and the resources to support replacement of automatic transfers switches at multiple buildings located at Captain James A. Lovell FHCC, North Chicago, IL 60064. The result of this market research will contribute to determining the method of procurement and potential interest. The anticipated North American Industry Classification System (NAICS) code for this procurement is 238210 – Electrical Contractors and Other Wiring Installation. It is also anticipated this will be set-aside 100% Service Disabled Veteran Owned Small Bussiness, unless research indicates otherwise.
Market Research11/09/2026
Under this notice, the United States Army Corps of Engineers - Chicago District is issuing a Request for Quotation (RFQ) to relocate chiller supply/return pipes and electrical conduits overhead at the CSSC Fish Dispersal Barrier in Lockport, IL. Work includes installing new CPVC, conduits, Unistrut supports, insulation, and refilling glycol.For any issues related to registration or other technical difficulties, offerors must contact the PIEE helpdesk directly (866-618-5988) and not the Contracting Officer.****Technical Difficulties: Prospective vendors may experience difficulties, either because the PIEE system is not operational, the vendor has not properly registered in PIEE, or the vendor is encountering other technical difficulties. In the unlikely event that the PIEE system is not operational, and vendors are unable to access or use the system, offerors must immediately notify the Contracting Officer and provide sufficient evidence to demonstrate the system is not operable. If the PIEE Solicitation Module is indeed down, the Contracting Officer may authorize an alternate method for bid submission, such as via email to the Contracting Officer and Contract Specialist. However, offerors must obtain prior approval from the Contracting Officer to use the alternate submission method. Notifications and approvals must occur prior to the submission deadline and be in writing.****PIEE System Registration: Your firm must register with sam.gov as a pre-requirement to do business with the federal government and prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE). Your firm must register with PIEE in order to access the solicitation and submit quote responses. Use the PIEE System Registration link: https://piee.eb.mil, and follow the instructions on their website. For detailed steps on how to set up vendor registration, visit: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the Vendor User Registration Doc, which will guide you through the process of registering as a vendor and ensure you select SOL-Solicitation in the drop-down list, choosing the Proposal Manager role for proper permissions.****Electronic Method of Submissions: The Procurement Integrated Enterprise Environment (PIEE) is the only authorized electronic transmission method for responses to this RFQ. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. In order to submit a quote in response to this RFQ through PIEE, offerors must be registered and in an active status in the System for Award Management (SAM).Under this notice, the United States Army Corps of Engineers - Chicago District is issuing a Request for Quotation (RFQ) to relocate chiller supply/return pipes and electrical conduits overhead at the CSSC Fish Dispersal Barrier in Lockport, IL. Work includes installing new CPVC, conduits, Unistrut supports, insulation, and refilling glycol. For any issues related to registration or other technical difficulties, offerors must contact the PIEE helpdesk directly (866-618-5988) and not the Contracting Officer.****Technical Difficulties: Prospective vendors may experience difficulties, either because the PIEE system is not operational, the vendor has not properly registered in PIEE, or the vendor is encountering other technical difficulties. In the unlikely event that the PIEE system is not operational, and vendors are unable to access or use the system, offerors must immediately notify the Contracting Officer and provide sufficient evidence to demonstrate the system is not operable. If the PIEE Solicitation Module is indeed down, the Contracting Officer may authorize an alternate method for bid submission, such as via email to the Contracting Officer and Contract Specialist. However, offerors must obtain prior approval from the Contracting Officer to use the alternate submission method. Notifications and approvals must occur prior to the submission deadline and be in writing.****PIEE System Registration: Your firm must register with sam.gov as a pre-requirement to do business with the federal government and prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE). Your firm must register with PIEE in order to access the solicitation and submit quote responses. Use the PIEE System Registration link: https://piee.eb.mil, and follow the instructions on their website. For detailed steps on how to set up vendor registration, visit: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the Vendor User Registration Doc, which will guide you through the process of registering as a vendor and ensure you select SOL-Solicitation in the drop-down list, choosing the Proposal Manager role for proper permissions.****Electronic Method of Submissions: The Procurement Integrated Enterprise Environment (PIEE) is the only authorized electronic transmission method for responses to this RFQ. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. In order to submit a quote in response to this RFQ through PIEE, offerors must be registered and in an active status in the System for Award Management (SAM).****DUE DATE AND TIME: The Contractor submittal packages must be received by the USACE- Chicago District Office no later than 9/3/26 at 2:00 pm (Central Time). All questions must be submitted prior to one calendar week prior to the deadline. This announcement constitutes the only solicitation, and the Government will not reimburse any quoters for their submission. Please reference the subject solicitation number on all correspondence. Detailed submittal requirements are contained in the Solicitation document. Estimated Award Date: September 2026. This is a combined synopsis/solicitation for commercial products or commercial services.
AwardedOpen
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
Solicitation09/09/2026

Additional Details

Solicitation Number

W912P627MR027755

Archive Date

Nov 10, 2027

Office Address

CHICAGO, IL, 60604-1437