Notice ID: 5dfdd5b181bb4132a4740bd361550b82JustificationAwardedArchived
Transportation via Barge
Awarded on November 19, 2025. Full description on SAM.gov.
Overview
- Posted
- November 26, 2025
- Notice type
- Justification
- NAICS
- 483211: Inland Water Freight Transportation
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVSUP.NAVSUP GLOBAL LOGISTICS SUPPORT.NAVSUP FLC SAN DIEGO.NAVSUP FLT LOG CTR SAN DIEGO
- Place of performance
- San Diego, California, 92134
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
- Award date
- Nov 19, 2025
- Award amount (SAM.gov award notice)
- Not specified
Identifiers
- Solicitation number
- R200955279S199
- Notice ID
- 5dfdd5b181bb4132a4740bd361550b82
Description
AWARD MADE TO THE JANKOVICH COMPANY, 14066 Garfield Ave, Paramount, CA 90723 FOR $123,600.00 ON 11/19/2025.
Award Overview
Award Number
N0024426PS012
Award Amount (SAM.gov award notice)
Not specified
Award Date
Nov 19, 2025
Awardee
Not specified
Original Solicitation
Notice ID: 5dfdd5b181bb4132a4740bd361550b82
Posted Date: Nov 26, 2025
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $370.8KSigned Jul 2, 2026
- $123.6KSigned Jan 12, 2026
- —Signed Nov 13, 2025
- —Signed Nov 3, 2025
- —Signed Oct 9, 2025
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3JustificationArchivedCurrent
Transportation via Barge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This contract covers dedicated scheduled and on-call fuel barge transportation services for Department of War-owned bulk Jet A Aviation Fuel (JAA), Jet Propellant 5 (JP5), and F76 Marine Diesel by tug and barge between all ordered United States ports and points along the Gulf of America, the Lower Mississippi River, and their connecting waterways and tributaries. QAs Round 1 (POSTED: 22 OCTOBER 2026)AMENDMENT 0001 NOTICE (POSTED: 29 OCTOBER 2026) 1. EXTEND PROPOSAL DUE DATE: Proposal submission deadline is extended to Monday, 16 November 2026 at 5:00 PM Central Time (CT). 2. PRE-PROPOSAL CONFERENCE: A Virtual Pre-Proposal Conference will be held on Monday, 09 November 2026 from 10:00 AM to 11:00 AM CST via Microsoft Teams. RSVP by Friday, 06 November 2026 at 5:00 PM CST to erica.m.weaver2.civ@mail.mil and taylor.n.obermeier.civ@mail.mil (CC: shanda.l.lyman.civ@mail.mil). See uploaded Conference Instructions for details. 3. See SF30 Block 14 Summary of Changes for all updates to the Solicitation. QAs Round 2 (POSTED: 29 OCTOBER 2026)QAs Round 3 and Round 4 (POSTED: 03 NOVEMBER 2026)AMENDMENT 0002 NOTICE (POSTED: 04 NOVEMBER 2026) 1. Update the Area of Performance in PWS Exhibit 1 (Appendix A, Loading/Discharging Points) to remove Goldline, Jennings, LA from the Jet A Aviation Fuel (JAA) Loading Ports. 2. Revise and Streamline Attachment 2 (Contract Documentation Worksheet): Incorporate DFARS 252.204-7025 (Notice of CMMC Level Requirements) as a dedicated item to capture the mandatory SPRS CMMC Unique Identifier (CMMC UID). 3. Implement Restrictive Data Drop-downs: Incorporate the mandatory Restriction on Use and Disclosure of Data acknowledgment drop-downs at the top of all continuation and response pages across Attachments 2, 4, 5, and 7 in accordance with Section III of the Addendum to FAR 52.212-1. | 76% | Combined Synopsis | 11/16/2026 |
Defense Logistics Agency (DLA) Energy has a requirement to transport capitalized Jet Propellant Thermally Stable (JPTS) aviation fuel from Defense Fuel Supply Point (DFSP) Texas City, Texas and DFSP Killingholme, United Kingdom for discharge at DFSP locations identified in the Performance Work Statement (PWS). The Contractor shall provide all personnel, equipment, and services necessary to load, transport, and deliver JPTS in accordance with best commercial practices. | 45% | Combined Synopsis | 11/18/2026 |
Amendment A0003 issued 10/29/2026 *************************************************************** Amendment A0002 issued 10/08/2026 *************************************************************** Amendment A0001 issued 08/31/2026 *************************************************************** The Department of Homeland Security/Federal Emergency Management Agency intents to award a Multiple-Award Indefinite Delivery Indefinite Quantity contract to obtain all-inclusive, multimodal transportation and shipping services from a Continental United States (CONUS) and/or Outside Continental United States (OCONUS) point of origin to American Samoa, Commonwealth of the Northern Marina Islands and Guam. Phase I Responses are due no later than 12:00PM ET, October 2, 2026. Phase II Responses are due no later than 12:00PM ET, November 6, 2026. Please see solicitation and attachments for all details. | 38% | Solicitation | 11/06/2026 |
PWS and Combined Synopsis and Solicitation have been updated to reflect amendment to solicitation See Attached Continued Questions and Answers Questions and Answers The RFQ says not to share it with other vendors, while the PWS contemplates subcontractors. May Prime Contractor provide necessary scope details to prospective performing subcontractors solely to obtain pricing? Please identify any approval or nondisclosure requirements. You are allowed to share the PWS and Combined Synopsis and Solicitation with prospective subcontractors. Please provide the referenced Excel Pricing Sheet and Section 889 form, or identify their download location. No excel pricing sheet provided, please provide an excel document format for the pricing referenced in the CLIN structure on Combined Synopsis and Solicitation. You can complete the Section 889 section on the Combined Synopsis and Solicitation. Should the two cultural-event options be separately priced and included in the evaluated total? The pricing table includes options, but the evaluation text states there are no options. Cultural Event CLINs shall also be evaluated. Please reconcile CLIN 0004 for DBA insurance with the instruction that DBA costs will not be separately priced or evaluated. DBA shall not be evaluated, since it would only be an estimate until awardee is selected. But interested vendors are requirement to have an estimate quote for DBA Insurance. Please confirm minimum seating of nine passengers per van and 45 per coach, excluding drivers, given inconsistent wording in PWS 5.2(a)-(b). Minimum seating excluding drivers are 45 Passengers/Seats; Disregard error on PWS 5.2(a) Title 40 Passenger Bus. Requirement is for 45 Passengers Minimum excluding drivers. The PWS describes the daily commute (13–27 February) as “Daily transit from Phum Serey Hotel to the PKO Training Center (morning departure and evening return).” Trips per day: Should vendors assume one round trip per day, with a morning trip from the Phum Serey Hotel to the PKO Training Center and an evening trip back to the hotel? Or should they plan for additional trips during the day? The daily commute trips from Phum Serey Hotel to PKO would typically be early morning anytime from 0500 – 0700 and return evening anytime from 1900 – 2000; please note the COR will provide pickup times in advance to vendor for coordination’s. Approximate times: If it is one round trip, do you know the approximate morning departure time and evening return time? Even a rough window would help vendors plan driver shifts within the 12-hour workday in the PWS. The daily commute trips from Phum Serey Hotel to PKO would typically be early morning anytime from 0500 – 0700 and return evening anytime from 1900 – 2000; please note the COR will provide pickup times in advance to vendor for coordination’s. Vehicles during the day: Should the coaches and drivers remain on standby at the training center between the morning and evening trips, or may they leave and return for the evening pickup? Coaches and Drivers may leave and return after pickup and drop off Could you provide the expected daily call sheet (routes, times, airport shuttle frequency)? Should the coaches be priced as on call 12 hours a day every day from 13 to 27 February, including weekends? . The daily commute trips from Phum Serey Hotel to PKO would typically be early morning anytime from 0500 – 0700 and return evening anytime from 1900 – 2000; please note the COR will provide pickup times in advance to vendor for coordination’s. Will arrivals use the new Techo International Airport (KTI) or the former Phnom Penh airport? Techo International Airport (KTI) Cultural day: how many passengers per coach, and is an overnight stay in Siem Reap expected? Minimum seating excluding drivers are 45 Passengers/Seats; Disregard error on PWS 5.2(a) Title 40 Passenger Bus. Requirement is for 45 Passengers Minimum excluding drivers. Overnight stay at Siem Reap anticipated. What are the expected headcounts and dates for the advance party, main body and rear party at the PKO Training Center? Approximately 90 Passengers, arrrival times stagged. Arrival Window: Two (2) days of dedicated arrival shuttle support. Departure Window: Two (2) days of dedicated departure shuttle support. Will the Government provide a VAT-exemption document that Cambodian subcontractors can apply to their invoices? If not, may VAT paid to subcontractors be included in our price? No VAT exemption document available, Prime Contractor is responsible for their subcontractors. 0001: 3 VAN , 06 Feb – 27 Feb , These three vans will be used for airport shuttle to Hyatt Regency , From Hyatt to Phum Serey Resort , Daily use for Phum Serey Resort and training site daily and sometime travel to Phnom Penh or Embassy . Correct, 3 Vans will be used for airport shuttle from Techno International Airport to Hyatt Regency Phnom Penh, From Hyatt Regency Phnom Penh to Training Center (PKO) Kampong Speu or Phum Serey Resort Hotel, and Daily travel between Phum Serey Resort and training site and sometime travel to Phnom Penh or Embassy. 0002: 1 VAN , 27 Feb – 05 Mar , This van will be used for travelling to PKO daily from Phnom Pen and airport shuttle This Van will be used for travel from PKO back to Phnom Penh on/around 26 or 27 Feb, it shall be used for airport shuttle from Hyatt Regency Phnom Penh to Techno International Airport, and trips within Phnom Penh. 0003: 2 (45 seats bus ) , 13 Feb – 27 Mar These two buses will be used for airport shuttle to Hyatt Regency , From Hyatt to Phum Serey Resort , Daily use for Phum Serey Resort and training site daily. and from Hyatt to airport when the team departure. Period of Performance is 13 Feb – 27 Feb 2027; and correct the two buses will be used for airport shuttle from Techno International Airport to Hyatt Regency Phnom Penh (Arrival Window: Two (2) days of dedicated arrival shuttle support & Departure Window: Two (2) days of dedicated departure shuttle support) Airport Arrival Window TBD on/around 13-14 Feb; Airport Departure Window TBD on/around 26-27 Feb. From Hyatt Regency Phnom Penh to Training Center (PKO) Kampong Speu or Phum Serey Resort Hotel, and Daily travel between Phum Serey Resort and training center 0004: Defense Base Act (DBA Insurance) , please advise the DBA insurance mean ? because our vehicle covered by insurance and covered passenger too , So we don't need to add cost on this clin 0004 DBA Insurance is required for services with the US Government, it is only required to cover your employee not the passengers. Please read 52.212-1 INSTRUCTIONS TO OFFERORS – ADDENDUM Option 1 & 2 , Will need 2 or 5 bus from designated hotel/PKO vicinity (Kampong Speu) to Siem Reap/Angkor Wat area. Option 1: Cultural Event Day Transportation Cost US Forces Two (2) × 45-passenger Coach Buses with Drivers, fully air-conditioned / climate-controlled, privacy blinds. Round-trip from designated hotel/PKO vicinity (Kampong Speu) to Siem Reap/Angkor Wat area. Includes all driver costs, fuel, tolls, parking, and necessary support. This would be an extension of CLIN 0003, the two buses shall be used for a cultural event trip to Siem Reap during the estimated window, dates/times shall be confirmed NLT 14 days prior. Option 2: Cultural Event Day Transportation Cost Cambodia Forces Five (5) × 45-passenger Coach Buses with Drivers, fully air-conditioned / climate-controlled, privacy blinds. Round-trip from designated hotel/PKO vicinity (Kampong Speu) to Siem Reap/Angkor Wat area. Includes all driver costs, fuel, tolls, parking, and necessary support. This is an additional 5 Buses to be used for a cultural event trip to Siem Reap during the estimated window, dates/times shall be confirmed NLT 14 days prior. Total of 7 Buses for Cultural Event Day. Signed 889 Form , What is form mean ? Contractors are required to be registered on SAM.gov. If you have an 889 compliant screenshot from SAM.gov that would be sufficient, you can also complete provision 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION on combined synopsis and solicitation. Amendment to Combined Synopsis and Solicitation Changes to PWS 5.2.7 c) From: "Equipment operators shall be proficient in conversational Basic English and able to translate directions / instructions from the COR." To: "Contractor Specified Contract Manager shall be proficient in conversational Basic English and able to translate directions / instructions from the COR while Equipment operators are recommended to be proficient in conversational Basic English and able to translate directions / instructions from the COR but not required. See attached Performance Work Statement (PWS) and Combined Synopsis and Solicitation Documents Questions can be sent to MAJ Pandy, Phillip at phillip.d.pandy2.mil@army.mil and SSG Mbawuike, Uchechukwu at uchechukwu.mbawuike.mil@army.mil. Last Date/Time for questions is 06 November 2026 @ 1300 1PM Hawaii Standard Time Zone. All responses must be submitted in PDF format and the Pricing Sheet must be submitted in Excel format via email to MAJ Pandy, Phillip at phillip.d.pandy2.mil@army.mil and SSG Mbawuike, Uchechukwu at uchechukwu.mbawuike.mil@army.mil. All submissions are due to the responsible Contracting Office no later than 20 November 2026 @ 1300 1PM Hawaii Standard Time Zone. | 35% | Combined Synopsis | 11/27/2026 |
Award made to Jankovich Company, 307 E 22nd St. San Pedro, CA 90731 for $123,600.00. See attached Jusitifcation for Urgency attached. | 100% | Sole Source / J&AArchived | Open |
Additional Details
Solicitation Number
R200955279S199
Archive Date
Dec 26, 2025
Office Address
SAN DIEGO, CA, 92136