Notice ID: f78e56b3c19c48a3b1ba78931358932fAward NoticeAwarded
B--Subsurface Soil/Groundwater Sampling Eielson AFB
Awarded on July 30, 2024. Full description on SAM.gov.
Awarded tounder 68HE0B24P0654 (source: SAM.gov award notice)• $39.1K
Overview
- Posted
- July 30, 2024
- Notice type
- Award Notice
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Environmental Protection Agency
Notice details
- Place of performance
- 3338 Central Avenue, Eielson Air Force Base
- Last updated
- Sep 9, 2025
- Award date
- Jul 30, 2024
- Award amount (SAM.gov award notice)
- $39.1K
Identifiers
- Solicitation number
- 68HE0B24Q0196
- Notice ID
- f78e56b3c19c48a3b1ba78931358932f
- Award number (PIID)
- 68HE0B24P0654
Description
SUBSURFACE SOIL/GROUNDWATER SAMPLING AT EIELSON AFB
Award Overview
Award Number
68HE0B24P0654
Award Amount (SAM.gov award notice)
$39.1K
Award Date
Jul 30, 2024
Awardee
Awardee UEI
WNCGXAR9LMW3
Original Solicitation
Notice ID: f78e56b3c19c48a3b1ba78931358932f
Posted Date: Jul 30, 2024
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
68HE0B24Q0196- Combined Synopsis
- Awarded
This opportunity has been awarded.
- Combined SynopsisJul 10, 2024
Subsurface Soil/Groundwater Sampling Eielson AFB
- AwardedCurrentJul 30, 2024
B--Subsurface Soil/Groundwater Sampling Eielson AFB
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Y1AZ - Fire Sprinkler System Design & Installation for Building 10 at the US Environmental Protection Agency, Edison Environmental Center, located at 2890 Woodbridge Avenue, Edison, New Jersey 08837. | - | Awarded | Open |
Replace Building Ramp | - | Solicitation | 10/15/2026 |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
Fermi National Accelerator Laboratory (Fermilab) is soliciting proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) type Master Subcontract for Utilities Excavation and Repair Services for Fermilab located in Batavia, IL. Fermi Forward Discovery Group (FFDG) seeks to find a qualified subcontractor to perform on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order. Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing. Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations. The Request for Proposal and all Exhibits are located at Sam.gov under Solicitation number 385439GMK. Questions Close on November 18, 2026 at 5:00 pm CST. All questions must be submitted in writing to ginakern@fnal.gov. The Request for Proposal (RFP) CLOSES on December 7, 2026 at 3:00 pm CST. Please email your proposals with all required documents to ginakern@fnal.gov. | - | Solicitation | 12/07/2026 |
See Presolicitation Notice Attachment for full details. ---- The United States Army Corps of Engineers Europe District (CENAU) has a requirement to provide a new laydown area including concrete tent pads, gravel bed, site improvements and utility connections for developing base expeditionary airfield resources (BEAR) to beddown personnel (550 pax) using Deployable Air Base System (DABS) sets supporting United States Air Force (USAF) contingency operations. The type of shelter in the standard DABS set is the Alaska Small Shelter System (AKSSS). BEAR assets in the standard DABS set to be accommodated within the beddown area include 72 billet shelters, two (2) latrine shelters, two (2) shower shelters, one (1) laundry shelter, one (1) 550-person kitchen package, four (4) command operations shelters, and three (3) morale, welfare, and recreation shelters. Supporting facilities include site development, utilities and connections (electrical power, domestic water & wastewater), and storm water drainage. As part of this anticipated construction contract, a utilities connection extension (domestic water and wastewater) to the limit of site will be performed through a host-nation-directed sole-source local contractor. The contact information for this contractor will be provided in the solicitation. The completed DABS Laydown Site electrical distribution system will use power provided via DABS generator sets; no electric utility grid connection is required. Primary Facilities to be Constructed: Gravel Bed - ~30,957 Square Meters Supporting Facilities to be Constructed (not all inclusive): Concrete Pads for Tents/Shelters Fencing Utilities | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
68HE0B24Q0196
Archive Date
Aug 15, 2024
Office Address