Notice ID: c160e4c78bfc33b76854da07498622e1Award NoticeAwarded
OR Grant 73(1), Silvies-Hopper Lane Reconstruction
Awarded on November 30, 2018. Full description on SAM.gov.
Awarded tounder 69056719C000008 (source: SAM.gov award notice)• $1.7M
Overview
- Posted
- November 30, 2018
- Notice type
- Award Notice
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of Transportation
Notice details
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 10, 2025
- Award date
- Nov 30, 2018
- Award amount (SAM.gov award notice)
- $1.7M
Identifiers
- Solicitation number
- 69056718B000019
- Notice ID
- c160e4c78bfc33b76854da07498622e1
- Award number (PIID)
- 69056719C000008
Description
PROJECT: OR Grant 73(1), Silvies-Hopper Lane Reconstruction LOCATION: 37 Miles South of John Day, Oregon. WORK: This project consists of Pavement repair and an emulsified asphalt concrete overlay. See "Description of Work" for additional details LENGTH: 2.94 Miles TENTATIVE COMPLETION DATE: Summer 2019 ESTIMATED PRICE RANGE: Between $1,000,000 and $2,000,000 To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
Award Overview
Award Number
69056719C000008
Award Amount (SAM.gov award notice)
$1.7M
Award Date
Nov 30, 2018
Awardee
Awardee UEI
FNU8GPNUKGZ5
Original Solicitation
Notice ID: c160e4c78bfc33b76854da07498622e1
Posted Date: Nov 30, 2018
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $7.5MSigned Jul 21, 2026
- $7.5MSigned Feb 25, 2026
- $7.5MSigned Aug 28, 2025
- $7.4MSigned Jun 12, 2025
- $7.4MSigned May 22, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
69056718B000019- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 7×Pre-SolicitationAug 7, 2018
OR Grant 73(1), Silvies-Hopper Lane Reconstruction
- SolicitationNov 16, 2018
OR Grant 73(1), Silvies-Hopper Lane Reconstruction
- AwardedCurrentNov 30, 2018
OR Grant 73(1), Silvies-Hopper Lane Reconstruction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link. | 79% | Pre-Solicitation | Open |
Sources Sought for OR FS FREWN602 28(1), Road 28 Reconstruction This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone, and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following: (a) Company Name (b) Address (c) Point of contact (d) Phone and email (e) UEI number (f) Bonding Capacity (per contract) (g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business (h) Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts. Requirement The proposed contract action is for a firm-fixed-priced construction contract. This work consists of Full Depth reclamation of the existing roadway, aggregate surfacing and drainage. This project is located approximately 6 miles South of Silver Lake, OR. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million. The project is anticipated to go on advertisement in Winter 2027 with construction in Spring 2027. Estimated Price Range: Between $5,000,000 and $10,000,000. Response: Responses to this Sources Sought Notice should include all information requested in (a) through (h) above. Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government. The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. Any offeror capable of providing this service shall respond to this Sources Sought by responding to the MS forms or e-mail to wfl.contracts@dot.gov no later than October 9, 2026, 1400 PST. | 79% | Market Research | 10/09/2026 |
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: NM FLAP SR35(1) PROJECT NAME: GRANT COUNTY BRIDGES SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference PROJECT DESCRIPTION: The Grant County Bridges Project is located near Mimbres, New Mexico, in Grant County, along State Route (SR) 35. SR 35 serves as a 27‑mile highway providing access to the Gila National Forest, connecting SR 15 in Silver City to SR 152 in Mimbres. The proposed improvements include work at four locations along SR 35: Bridge 1330 — Milepost (MP) 0.5 Concrete box culvert — MP 4.65 Bridge 1873 — MP 5.2 Bridge 1876 — MP 8.42 SCOPE OF THE WORK: The project includes reconstruction of three bridges and a concrete box culvert. Improvements would provide reliable and safe access to the Gila National Forest for local and regional travelers. Improvements to these structures would also benefit travelers by accessing residential and commercial properties along SR 35. Schedule A includes: The project includes demolition of the existing bridge and construction of three (3) new simple-span, precast, prestressed concrete bridges: an 80‑ft simple span with precast prestressed I‑girders and a cast‑in‑place reinforced concrete deck; a skewed 55‑ft‑6‑in simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay; and a 36‑ft simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Bridge 1, a 80‑ft simple span: precast, prestressed I‑girders with a cast‑in‑place reinforced concrete deck. Bridge 2, a 55‑ft‑6‑in skewed simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Bridge 3, 36‑ft simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Option X includes: The work consists of removing an existing open-bottom concrete box culvert and replacing it with a 10‑ft by 5‑ft reinforced concrete box culvert. PRINCIPAL WORK ITEMS: Schedule A Removal of Bridge 484 Cuyd of Structural Concrete 707 LNFT of Precast, prestressed concrete slabs 48 inch voided (15” and 18”) 80,900 LB of reinforced steel epoxy coated 511 LNFT Bridge railing steel 800 LNFT drilled shaft 30 inches. 40 weeks of Temporary Traffic control flagger and Traffic Control Supervisor Option X 2 Each Concrete headwall (including wing walls) 60 LNFT, 10 ft span, 5 ft rise precast reinforced box culvert 5 weeks of Traffic Control Supervisor ESTIMATED COST RANGE: The estimated price range is between $10,000,000 and $20,000,000. ITEMS WORTH NOTING: Construction in Mimbres can be maintained through all seasons, but you must factor in cold-weather provisions for the winter months to ensure the integrity and quality of critical bridge and culvert materials like concrete and sealants. | 72% | Pre-Solicitation | 12/01/2026 |
Update 11/16/2026: Bid Tabulation Report posted to attachemnts. Update 11/13/2026: Bid Summary posted to attachemnts. Update 11/12/2026: Interested Vendor List Posted 11/12/2026 Update 10/30/2026: Bid opening due date has been revised from 11/04/2026 to 11/13/2026. Update 10/30/2026: Amendment_A001.pdf posted to attachments. Update 10/30/2026: QandA_10-30-2026.pdf posted to attachments. Update 10/28/2026: QandA_10-28-2026.pdf posted to attachments. Update 10/27/2026: QA_10-27-2026.pdf posted to attachments. Update 10/16/2026: QA_10-16-2026.pdf posted to attachments. Invitation for Bids (IFB) for construction project WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments. | 63% | Solicitation | 11/13/2026 |
Invitation for Bids (IFB) for Construction Project, WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 The IFB, plans, and physical data are posted under Attachments/Links. Note: This project is being advertised as Full and Open INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. | 63% | Solicitation | 12/03/2026 |
Additional Details
Solicitation Number
69056718B000019
Archive Date
Dec 15, 2018
Office Address
VANCOUVER, WA, 98661