OR FLAP DOT CRGNSA 100(9), Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point
Archived on November 1, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- October 21, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 690567 WESTERN FEDERAL LANDS DIV
- Place of performance
- Hood River, Oregon
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Dec 1, 2025
Identifiers
- Solicitation number
- 69056725B000012
- Notice ID
- 5210ac551bbd4989a8d447246a95877d
Description
Update 10/21/2025: Bid tabulation posted to attachments.
Update 2 10/17/2025: Bid Summary posted to attachments.
Update 10/17/2025: QA_10-17-2025.pdf posted to attachments.
Update 2 10/10/2025: Amendment A001 and QA2_10-10-2025.pdf posted to attachments.
Update 10/10/2025: QA_10-10-2025.pdf posted to attachments.
Update 10/07/2025: QA_10-07-2025.pdf posted to attachments.
Invitation for Bids (IFB) for construction project: OR FLAP DOT CRGNSA 100(9), Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point
The Invitation for Bids (IFB), Plans, Physical Data, Link to Bid Opening, and the Construction Contract Administration Document per FAR 36.211 are posted under Attachments/Links.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Showing 10 of 19 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
ora-dot-crgnsa100-9_plans.pdf | Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 76.86 MB | ||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 161.56 KB | |||
IFB_69056725B000012_OR FLAP DOT CRGNSA 100(9)_Final.pdf | Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 27.02 MB | ||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 8 MB | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 384.95 KB | |||
ora-dot-crgnsa100-9_escp.pdf | Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 31.18 MB | ||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 5.25 MB | |||
WFLHD GR 3-19 (Geotechnical Report Appendix).pdf | Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 89 MB | ||
Physical Data.zip | Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 4.35 MB | ||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 21, 2025 | 38.49 KB |
Showing 1 to 10 of 19 results
Lifecycle
69056725B000012- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationAug 19, 2025
OR FLAP DOT CRGNSA 100(9), Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point
- 7×SolicitationCurrentSep 17, 2025
OR FLAP DOT CRGNSA 100(9), Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point
Similar Opportunities
- OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Department of Transportation · Posted 10/22/2026
- OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Department of Transportation · Posted 07/15/2026
- Sources Sought for OR FS FREWN602 28(1), Road 28 Reconstruction
Department of Transportation · Posted 09/10/2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Department of War · Posted 10/20/2026
- NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge
Department of Transportation · Posted 10/28/2026
Additional Details
Solicitation Number
69056725B000012
Archive Date
Nov 1, 2025
Office Address
VANCOUVER, WA, 98661