Notice ID: 59fc0fa6a73840e08752842e445693dbCombined Synopsis/Solicitation
Installation of a backup generator located at Joint Base Cape Cod
Archived on February 2, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−05:00
- Posted
- November 21, 2024
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of TransportationOFFICE OF THE SECRETARY
Notice details
- Office
- 6913G6 VOLPE NATL.TRANS.SYS CNTR
- Place of performance
- Buzzards Bay, MA, 02542
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 6913G625Q300005
- Notice ID
- 59fc0fa6a73840e08752842e445693db
Description
Amendment No. 00005 to RFQ No. 6913G625Q300005. This combined synopsis/solicitation for commercial items is amended to update the dates the CO is out of the office: When responding to the RFQ during the period 11/29/2024 - 12/6/2024 send your quote to Christopher Dooley at christopher.dooley@dot.gov and cc the contracting officer, Karen Marino. Also, if you have any questions during this period, please send them to Chris Dooley via email (above), as the contracting officer will be out of the office during this time. All other terms and condtions of the RFQ remain the same.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Select documents to download
Showing 6 of 6 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - | |||
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - | |||
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - | |||
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - | |||
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - | |||
| Combined Synopsis/Solicitation | OFFICE OF THE SECRETARY | Nov 21, 2024 | - |
Lifecycle
Solicitation:
6913G625Q300005- Combined Synopsis
- 6×Combined SynopsisCurrentNov 5, 2024
Installation of a backup generator located at Joint Base Cape Cod
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Electronic Systems Directorate (ESG) has a requirement to procure and install a comprehensive technology upgrade for the VTC and A/V systems in conference room 149 of building 1624 (5 Eglin Street, Hanscom AFB, MA 01731) and conference room 120 of building 1630 (75 Vandenberg Drive, Hanscom AFB, MA 01731). Please see Statement of Work (SOW) for complete details. Site Visit Registration Due: 12 November 2026, 12:00 PM ET Site Visit Walkthrough: 18 November 2026, 10:00 AM ET Questions Due: 30 November 2026, 12:00 PM ET Offers Due: 11 December 2026, 12:00 PM ET | - | Combined Synopsis | 12/11/2026 |
The Contractor shall furnish all equipment, materials, labor, installation, integration, programming, testing, documentation, training, preventive maintenance, technical support, repair and replacement support, and other services required to upgrade, modernize, and sustain the Video Teleconferencing (VTC) and Audiovisual (A/V) system in Conference Room 203, Building 1624, Hanscom AFB, MA. All work shall be performed in accordance with Attachment 1, Statement of Work. Site Visit Registration Due: Tuesday, November 17, 2026, 3:00 PM ET Site Visit Walkthrough: Friday, November 20, 2026, 10:00 AM ET Questions Due Cut-Off: Tuesday, November 24, 2026, 3:00 PM ET Quotation Due Date: Friday, December 4, 2026, 3:00 PM ET The previous Notice ID 2026-PZI-0023 | - | Combined Synopsis | 12/04/2026 |
Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Peña Blvd, Denver, CO The Federal Aviation Administration has awarded Contract 697DCK-27-C-00016 to KSC Federal Contractors LLC’s, of Wildwood NJ, in the amount of $103,872.76. | - | Awarded | Open |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
AFLCMC/PZI intends to award a sole-source purchase order to Northern Electric Inc. to complete partially finished Fiber-to-the-Desk (F2D) cabling, four (4) server rack installations, and printer drops for Building 1614 Phase 2 in support of AFLCMC/HNJ. This is not a Request for Proposal (RFP) or Invitation for Bid (IFB); The Air Force does not intend to award a contract on the basis of this notice or to otherwise pay for the information to be solicited. Although “proposal” and “offeror” are used in this Pre-solicitation, your responses will be treated as information only. It shall not be used as a proposal. Please see NOCA Attachment for further information. | - | Special Notice | 11/06/2026 |
Additional Details
Solicitation Number
6913G625Q300005
Archive Date
Feb 2, 2025
Office Address
CAMBRIDGE, MA, 02142