Demolition, Remediation and Restoration
Archived on July 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- June 12, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationOFFICE OF THE SECRETARY
Notice details
- Office
- 6913G6 VOLPE NATL TRANS SYS CNTR
- Place of performance
- Clovis, California, 93619
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6913G626Q300030
- Notice ID
- d42287d7fd2e48dca156c2c65f2dc675
Description
Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAA’s Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below:
- CZQ VOR – Clovis, CA (36.884322°, -119.815140°)
The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas.
The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition.
See SOW for further details of requirement.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (9)
- Download
RFQ 6913G626Q3000030 CLARIFICATION QUESTIONS and RESPONSES 6-12-26.pdf
69 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
RFQ 6913G626Q300030 CLARIFICATIONS QUESTIONS and RESPONSES 6-10-26.pdf
111 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
6913G626Q300030 RFQ.pdf
225 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachments (Rev 1) I-III 6-8-26.pdf
353 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
TABLE OF CONTENTS Page 4.pdf
89 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment IV - Rev 1 CZQ VOR SSR -Final.pdf
12 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment V - WD 2015-5609 SAM.pdf
68 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment VI Instructions 5-27-26.pdf
161 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment VII Pricing.pdf
79 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Demolition, Remediation and Restoration
- 2Version 2Combined Synopsis/SolicitationArchived
Demolition, Remediation and Restoration
- 3Version 3Combined Synopsis/SolicitationArchived
Demolition, Remediation and Restoration
- 4Version 4Combined Synopsis/SolicitationArchived
Demolition, Remediation and Restoration
- 6Version 6Combined Synopsis/SolicitationArchivedCurrent
Demolition, Remediation and Restoration
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | 94% | Combined Synopsis | 11/23/2026 |
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | 51% | Combined Synopsis | 06/15/2026 |
Amendment One is posted to extend the due date to December 2nd, 2026 at 12:00PM. The government will post an amendment with the questions and answers received shortly. ______________________________________________________________________ (i) This Request for Quote (RFQ) for construction work located at the Stewart Lee Udall Building, HQ for the Department of the Interior, 1849 C Street, NW, Washington DC 20240. (ii) This requirement is a total small business set-aside under North American Industry Classification System (NAICS) Code 238910 Site Preparation Contractors with a business size standard of $19 million. Federal Supply Code (FSC) Z2AA Repair or Alteration of Office Buildings. This solicitation is issued under Revolutionary FAR Overhaul (RFO) Part 12, Acquisition of Commercial Products and Commercial Services. (iii) This is a combined synopsis/solicitation. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. The Government will award a firm fixed price contract from this solicitation to the responsible vendor whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. The Government intends to evaluate all timely quotes received from eligible vendors on a lowest price technically acceptable (LPTA) basis. The Government intends to evaluate quotations and award a contract without discussions with quoters. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Point of Contact: The Contracting Officer shall serve as the focal point for inquiries from actual or prospective offerors. Address any questions or concerns to Contracting Officer, Nicholas Lesicki; nicholas_lewicki@ibc.doi.gov and contract specialist Haider Al Azzawi; halazzawi@ibc.doi.gov. All inquiries must be written, no phone inquiries will be answered. Questions are due by 12:00 p.m. EST on November 10, 2026. Late questions may not be answered. Quotes are due November 19, 2026, at 2:00 PM Eastern Standard Time (EST). Quotes shall be submitted to Contracting Officer, Nicholas Lewicki; nicholas_lewicki@ibc.doi.gov and contract specialist Haider Al Azzawi; halazzawi@ibc.doi.gov. A site-visit is scheduled for interested vendors on Friday November 6, 2026 at 11:00AM and Monday, November 9, 2026 at 2:00PM. Vendors attending the site-visit must send an email to nicholas_lewicki@ibc.doi.gov and halazzawi@ibc.doi.gov indicating their business, name of person(s), phone number and email address of the representative(s) attending the site-visit. All visitors must have a valid REAL ID to enter the building. The address for the site visit is 1849 C Street NW, Washington, DC, 20240, using the C Street entrance. Please wait at the security desk for a representative to get you. | 46% | Combined Synopsis | 12/02/2026 |
This project includes all work to demolish the existing fuel system. The existing fuel system consists of, but is not limited to, a 5,000-gallon diesel tank, diesel dispenser, concrete containment, light poles, and Automatic Tank Gauge. | 46% | Market Research | 10/01/2026 |
SOLICITATION NOTICE: The RFP and all attachments for the Standard Chlorine of Delaware- Remediation Services Single Award Task Order Contract (SATOC) are attached as part of this solicitation posting. Site Visit: Site visit is scheduled for 02 October 2025 starting at 9:30AM EST. Address: 745 Governor Lea Road, New Castle, DE 19720Point of Contact for site visit: Bishel Baby, Bishel.Baby@usace.army.mil Proposals are due: 21 October 2025 5:00PM EST. AMENDMENT 0001- This amendment provides responses to some RFIs, outline site visit instructions, and extends the proposal due date to 29 October 2025 5:00PM EST. RFI phone inquiries will not be accepted. AMENDMENT 0002- The purpose of Amendment 0002 is to incorporate the Governments responses to the Requests for Information (RFIs) and to update the Statement of Work (SOW) for the Base SATOC for the Standard Chlorine of Delaware project. All other terms and conditions shall remain unchanged. (Please note that responses Amendment 0001 response are also included in the Amendment 0002 RFI response document.) AMENDMENT 0003- The purpose of this amendment is to extend the closing date to 1:00 pm (EST) 19 November 2025 and extend the deadline for RFI submissions to 3:00 pm (EST) 27 October 2025. All other terms and conditions remain unchanged. AMENDMENT 0004- The purpose of this amendment is to provide additional Government responses to RFIs. The proposal deadline is extended to Tuesday 25 November 2025 by 3PM EST. Additional RFIs may be submitted by Friday November 7, 2025 3PM EST. All other terms and conditions remain unchanged. UPDATE NUMBER 0005- This update provide a list of contractors interested in networking for the SCDE project (see attachment). AMENDMENT 0005- The purpose of this amendment is to provide Government responses to RFIs. Please take note of all revised attachments as part of this amendment. All other terms and conditions remain unchanged. UPDATE NUMBER 0007- The purpose of this update is to remove the RFI responses and the document provided with Amendment 0005 and provide a revised document with Government responses. As a result, the document titled |W912BU25RA015_Amendment_0005_Responses| is removed from this solicitation, and is now replaced with revised government responses to the RFIs submitted under Amendment 0005-. The revised document title is |W912BU25RA015_Amendment_0005_Responses_rev1|. Please use the most updated document to provide responses/proposals to this RFP. All other terms and conditions remain unchanged. AMENDMENT 0006- The purpose of this amendment is to extend the proposal deadline for Solicitation No: W912BU25RA015 from 25 November, 2025 3:00PM EST to 05 December 2025 by 3:00PM EST. All other terms and conditions remain unchanged. Note- A conformed copy of the solicitation has been uploaded/included with this amendment. ALL Amendments MUST be acknowledged when submitting a final proposal. AMENDMENT 0007- The purpose of this amendment is to restore the _Sample Task Order Proposal Spreadsheet / Work Breakdown_ language under Section L, Volume IV, Factor 3 - Total Evaluated Price. This language was inadvertently removed in Amendment 0006. The due date for proposals is now extended to Monday, 8 December, 2025 by 5PM EST. CLIN 0001 is a placeholder CLIN only to provide flexibility at the task order level. Should this CLIN be utilized post award, pricing will be negotiated at the order level at which time funds will be realigned from CLIN 0002, as required. Conformed copy is uploaded with highlighted changes. | 41% | Solicitation | 12/08/2025 |
Additional Details
Solicitation Number
6913G626Q300030
Archive Date
Jul 2, 2026
Office Address
CAMBRIDGE, MA, 02142