Notice ID: c2b12757a4a6465a93cebab7c3382b21Presolicitation
Construction of a Pendleton Backup Emergency Communication System (PDT BUEC) in Pendleton, OR (AND) Construction of a Pullman Remote Communications Outlet (PUWA RCO) in Pullman, WA
Archived on February 27, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:30 PM UTC−08:00
- Posted
- February 20, 2020
- Notice type
- Presolicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of TransportationFEDERAL AVIATION ADMINISTRATION
Notice details
- Office
- FAA WESTERN-PACIFIC REGION
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 697DCK-20-R-00191
- Notice ID
- c2b12757a4a6465a93cebab7c3382b21
Description
The acquisition strategy for this procurement has not yet been determined at this time; however, either an unrestricted competition or set-aside will be chosen depending on the response to this market survey. The responses to this market survey will be used for information purposes only. This is not a Screening information request for proposals of any kind. The FAA is not seeking or accepting unsolicited proposals. The FAA will not pay for any information received or costs incurred associated with the preparation or in response to this market survey. The Federal Aviation Administration (FAA) Western Service Area has a requirement as follows: Construction of PUWA RCO in Pullman, WA Major Items of Work: A. Furnish all equipment and materials necessary for the modifications to the communication facilities in satisfactory conformance with the contract drawings and specifications. All equipment and materials shall be new. B. Install new 24x24x8 (GFM) junction box mounted at a new strut rack near the new antenna tilt downs. Box type is NEMA 4x SS junction box. Work includes installation of pass-thru plates inside the new J-boxes. See drawing S002 for details. (GFM) C. Install new 24x24x8 (GFM) box mounted on the shelter exterior wall. Box type is NEMA 4x SS junction box. Work includes installation of bulkhead plates inside the new J-box. See drawing E001 for details. (GFM) D. Install two 15 tilt down antenna towers and foundations. See drawing S003 for details. (GFM) E. Install 2 3 GRS D.E.B. Conduit between shelter J-Box and strut J-Boxes Run 4 runs of heliax cable in one conduit and leave second conduit as spare with rope. See drawing C001 for details. AND Construction of PDT BUEC in Pendleton, OR Major Items of Work: A. Furnish all equipment and materials necessary for the modifications to the communication facilities in satisfactory conformance with the contract drawings and specifications. All equipment and materials shall be new. B. Install new 24x24x8 (GFM) junction boxes mounted at a new strut racks near the new antenna tilt downs. Box type is NEMA 4x SS junction box. Work includes installation of pass-thru plates inside the new J-boxes. See drawing S002 for details. (GFM) C. Install new 24x24x8 (GFM) box mounted on the shelter exterior wall. Box type is NEMA 4x SS junction box. Work includes installation of bulkhead plates inside the new J-box. See drawing E001 for details. (GFM) D. Install 20 tilt down antenna tower and foundation. See drawing S003 for details. (GFM) E. Install 2 3 GRS D.E.B. Conduit between shelter J-Box and strut J-Boxes Run 4 runs of heliax cable in one conduit and leave second conduit as spare with rope. F. Demolish existing antennas at QTY BUEC shelter. Interested offerors are required to submit their written interest in response to this procurement to elsa.gonzalez@faa.gov by 4:30 PM local time on Thursday, February 27, 2020. Response replies must include the following information: 1. Company Name 2. Address 3. Point of contact name, e-mail address and telephone number 4. Business size status: 8(a) Certified, Small Business, SDVOSB, etc. 5. DUNS Number
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
697DCK-20-R-00191- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentFeb 20, 2020
Construction of a Pendleton Backup Emergency Communication System (PDT BUEC) in Pendleton, OR (AND) Construction of a Pullman Remote Communications Outlet (PUWA RCO) in Pullman, WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
697DCK-20-R-00191
Archive Date
Feb 27, 2020
Office Address
EL SEGUNDO, CA, 90245