GovChime
Notice ID: 18f6ffdbbd4749d2b0ddd210ba695e2fAward NoticeAwarded

DIA ATCT Modernization

Awarded on April 12, 2023. Full description on SAM.gov.

Awarded tounder 697DCK-23-C-00146 (source: SAM.gov award notice)• $10.9M

Overview

Posted
April 12, 2023
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Transportation

Notice details

Place of performance
Denver, CO, 80249
Last updated
Dec 4, 2025
Award date
Apr 12, 2023
Award amount (SAM.gov award notice)
$10.9M

Identifiers

Solicitation number
697DCK-23-R-00508
Notice ID
18f6ffdbbd4749d2b0ddd210ba695e2f
Award number (PIID)
697DCK-23-C-00146

Description

GENERAL The work described here is representative at best and is not all-encompassing of the project scope modernization and refurbishment of the Federal Aviation Administrations Airport Traffic Control Tower (ATCT) and Base Building located at the Denver International Airport. The ATCT is a 24/7 operational facility. This project is to complete the facility modernization; most of the work in the upper floors of the ATCT was completed before the original construction contract was terminated due to COVID in 2020. The ATCT and Base Building are constructed of architectural precast concrete panels. The ATCT panels cover cast-in-place concrete up to 240 feet in building elevation and above this level, the tower is constructed of precast panels over structural steel. Adjacent to the ATCT is the 3-story Base Building and the Mechanical / Cooling Tower Building. Coordination will be required with all Mechanical, Plumbing, and Fire Suppression refurbishment and replacement work, along with movement of parts, equipment and labor when using the ATCTs elevator. Periods of sustained elevator usage will need to be coordinated with the facility so as to avoid impacting air traffic operations. Refurbishment will be designed and sequenced to prevent interruption of operations in the Base Building and ATCT, and may include night work. Any required interruption of services will require advanced scheduling and coordination with the responsible authorities and managers of the FAA and in some case the Denver International Airport. Estimated value is between $5,000,000.00 and $10,000,000.00. Architectural Work includes: Replacement of all interior finishes in the Base Building and stairways with Class A finishes. Penetrations and openings at fire-rated floor and wall assemblies will be repaired with the appropriate fire-stopping assemblies. Repair and refinishing of the exterior soffit at the ATCT Junction Level, approximately 22 stories above ground level Remodel Base Building restrooms and break rooms to meet ABA/ADA requirements. ABA/ADA compliant signage will be provided inside and outside of the stair enclosures. Handrails and metal stair tread riser panels will be added between ground level and junction level to the existing fire exit stairs in the ATCT. Replace new room signage in both the Base Building and ATCT. Remediate mold contamination, previously identified at interior walls and at perimeter unit heaters. Replace drywall in areas where it has been damaged by water, primarily due to leaking mechanically/plumbing systems. Replace backflow preventer, hose bibs, and valves. Remove and relocate water heater and mop sink, necessary to accommodate mold remediation work. Water closets, sinks and water coolers will be replaced and installed in compliance with the ABA/ADA accessibility requirements. Remediate exterior sealant joints at the 2nd Floor Base Building window perimeters due to water infiltration with a weeped two-stage joint added at the architectural concrete panel joints at the windows heads of the north and west facing windows. Fire and Life Safety Work includes repair or replacement to existing fire-rated walls and door assemblies, adjustment or replacement where damaged or deficient in order to restore fire ratings. Listed firestop assemblies will be provided where missing at all rated barriers. Provide UL approved fire-stopping assemblies at penetrations of fire rated walls and floor assemblies. Replace fire rated doors with full flush steel construction, minimum 1-3/4 thick. All exterior hollow metal doors and frames will be galvanized and insulated meeting NFPA 80 requirements. Provide flush, solid core wood doors with paint, veneer, or plastic laminate clad finish to match facility standard and meeting NFPA 80 requirements. Access Doors: Replace existing floor hatch at Cable Access level with fire rated hatch. Replace existing door knobs with ADA-ABA compliant levers. Provide power assist door openers and door closers at fire rated door assemblies and meeting NFPA 80A requirements. Install pre-finished steel semi-recessed Fire Extinguisher cabinets with solid doors and magnetic flashlight. Install stair access and fall protection atop of the diesel fuel tank and a guardrail around the access hatch to the cooling towers. Fire Suppression work includes: Maintenance and service to all existing fire suppression riser assemblies including new gaskets, valve packing replacement and verification of each risers operation. Provide releasing modules at each pre-action riser assembly. Install butterfly valves above each pre-action riser assembly. Replace sprinkler head escutcheons in ceiling. Provide automatic chemical suppression system at one (1) break room in the Base Building with a range hood with manual electric disconnect and manual suppression system activation. Replace existing ATCT fire pump. Add damper control and damper control strategy through DDC to the ATCT Stairwell as well as the fire alarm system. The sequence will interrupt the stair pressurization to allow occupancy. Fire Alarm work includes: Relocating the smoke detector in the supply ductwork of AHU-1 to be upstream of the duct humidifier. Fire alarm system devices where affected or modified, will be coordinated with the FAA Building Management and the local fire alarm control panel to avoid all trouble/alarm signals. The existing Fire Alarm System will be modified and/or expanded to include additional fire detection devices, release of sprinkler system detection, and notification devices including strobes, and combination horn/strobe appliances where deficiencies have been identified. The system devices will be addressable, non-coded, with sufficient capacity for required coverage. Manufacturer type will be compatible with existing system. Mechanical work includes: Below is a list of major mechanical equipment that is to be replaced as part of this project. This equipment will be identified in the project design documents and is not all encompassing of the project scope: Replacement of existing Air-Handling units in the Base Building. Replacement Existing Boiler units and Control Panels in the Base Building. Replacement Existing Hot Water System Pumps in the Base Building. Replacement Existing Exhaust Fans in the Base Building & ATCT. Replacement Existing Unit Heaters in the ATCT pipe chase. Replace AHU-1 on a one-for-one basis in the Base Building. Replace AHU-2, AHU-3, and AHU-4 and all ancillary devices with CRAC units of similar capacity in the Base Building. Replace AHU-5 and AHU-6 and all ancillary devices with vertical air handling units of similar capacity in the Base Building. Replace AHU-7 and AHU-8 and all ancillary devices with CRAC units of similar capacity in the Base Building. The supply air will be ducted above the ceiling to supply diffusers to better distribute airflow between racks of equipment. Replace AHU-11 and AHU-12 and all ancillary devices on a one-for-one basis on the Sub-junction level of the ATCT. Provide temporary, portable AHUs and ducting during the replacement. Remove portion of wall at sub-junction level to allow for replacement of AHU-12. Infill opening after replacement is complete. Replace AHU-13 and 14 on a one-for-one basis on the Junction level of the ATCT. Remove and provide new finned tube elements, control valves, balancing valves, shut off valves and associated piping on a one-for-one basis in the Base Building. The covers for the existing finned tube heating will be removed and re-installed. New valves will be installed in the hot water piping branch lines to facilitate work. Provide a full capacity temporary boiler plant with 100% redundancy during the removal and replacement of existing boilers, pumps and heat exchanger. Including (2) new boilers, (2) Tower hot water pumps, (2) Base Building hot water pumps, insulated steel piping between temporary boilers and temporary pumps, flexible piping between temporary pumps and existing system, temporary heated pump enclosures for winter operation, and temporary controls that mimic the existing configuration. Note: the temporary boiler plant was partially constructed at the time of original contract termination. The temporary boilers, pumps and associated piping and electrical supplies have already been purchased and are stored off-site and will be available for use, along with the original design drawings. Remove the existing boilers and replace with high efficiency boilers. The new boilers will be capable of local DDC control. Replace the hot water expansion tank and air separator on a one-for-one basis. The existing three hot water pumps were designed at 50% heating load each which provided partial redundancy. Replace with two (2) new hot water pumps designed each at 100% of the heating load providing 100% redundancy. New pumps provided with VFD for balancing to match existing flow characteristics. Replace hot water heat exchanger in the mechanical room of the Base Building. Replacement will include adding a second heat exchanger and the required valves, piping, and accessories for a fully redundant system. Replace all hydronic unit heaters in the pipe chase from the ground floor to the 13th floor with electric unit heaters. Existing hydronic piping taken back to the mains and capped. Re-locate humidifier wand diffusers for AHU-1 downstream of the duct smoke detector in the mechanical room of the Base Building. Add air handling units and humidifier to the 10th floor of the tower to serve the 11th floor of the tower. Remove AHU from the ASDE equipment room on the 11th floor above the Cab of the ATCT. Increase outside air circulation for ATCT stairwell free-cooling. This will include tying a new fan into the supply ductwork for the stair pressurization system to provide ventilation air into the space, and using the relief air damper and louver near the top of the stairwell to relieve air from the space. Controls will be modified to disable the ventilation system in case of emergency, and allow the stair pressurization system to function. Replace the chemical feed system for the heating hot water system. In the UPS room in the Base Building, install a filter bank on the air intake hood. Thermostat protection for cab under architectural scope of work. Provide 13th floor battery room ventilation. Replacement of duct electric coil EDH-11 located on the cable access level of the tower. Install electric unit heater in boiler room. Cap existing grilles in ATCT stairwell. The Electrical Work As part of this project, includes additional receptacles, fire alarm, telecommunications outlets and additional electrical equipment associated with new Architectural, Mechanical and Plumbing installations. Other miscellaneous electrical work is to be performed in various panels (for code and FAA order compliance) as noted in the design drawiings

Full description on SAM.gov

Award Overview

Award Number

697DCK-23-C-00146

Award Amount (SAM.gov award notice)

$10.9M

Award Date

Apr 12, 2023

Awardee

Awardee UEI

G1DMJZKBDRZ5

Awardee CAGE Code

4CMK4

Original Solicitation

Notice ID: 18f6ffdbbd4749d2b0ddd210ba695e2f

Posted Date: Apr 12, 2023

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 697DCK27C00030
    GUARDIAN CONSTRUCTION, INC.
    Department of TransportationNAICS 236220
    $181.7KSigned Nov 5, 2026
  • 697DCK26C00036
    GUARDIAN CONSTRUCTION, INC.
    Department of TransportationNAICS 236220
    $10.3MSigned Oct 13, 2026
  • 697DCK25C00051
    GUARDIAN CONSTRUCTION, INC.
    Department of TransportationNAICS 236220
    $709.3KSigned Sep 10, 2026
  • 697DCK23G00033
    GUARDIAN CONSTRUCTION, INC.
    Department of TransportationNAICS 236220
    —Signed Jul 21, 2026
  • 697DCK23G00039
    GUARDIAN CONSTRUCTION, INC.
    Department of TransportationNAICS 236220
    —Signed Jul 21, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:697DCK-23-R-00508
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentApr 12, 2023

    DIA ATCT Modernization

    Notice 18f6ffdbbd4749d2b0ddd210ba695e2f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
MT RAINIER - MORA- NEW CAMP MUIR GUIDE BLDGS
-Solicitation12/10/2026
REHABILITATE KIOSK RESTROOMS TO IMPROVE VISITOR ACCESS AND EXPERIENCE, OREGON CAVES NATIONAL MONUMENT & PRESERVE, JOSEPHINE COUNTY, OREGON. HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a quotation. SITE VISIT INFORMATION: A site visit is scheduled for Friday, November 6, 2026 at 10:00 AM Pacific Standard Time (PST). Participants will meet at 20000 Caves Hwy, Cave Junction, OR 97523. Drive to the parking lot and meet at the restrooms near the kiosk. RSVP to David M. John at david_john@nps.gov or by phone, as specified in Section VII of the Solicitation. While not mandatory, quoters are urged and expected to inspect the site where the work will be performed. QUESTIONS? Submit any questions regarding this solicitation in writing to Contracting Officer Alanna Gardner at alanna_gardner@ios.doi.gov and include solicitation number 140PP027Q0018 in the subject line of the email.
-Solicitation11/16/2026
BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT This is a solicitation announcement for warehouse improvements at the Bureau of Land Management UFO MPLC WAREHOUSE IMPROVEMENT, Montrose, CO. 1.1 PROJECT DESCRIPTION Montrose Public Lands Center. The work includes, but is not limited to; - Asbestos abatement, - Remodel bathrooms, - Replace flooring, - Replace rooftop heating and cooling unit (RTU), - Replace manual overhead door with electric overhead door, - Add luminaires and replace existing luminaires, - Add and relocate electrical outlets, - Service and maintain metal roof, - Repair and maintain existing overhead doors and, - Photovoltaic inverter replacement. 1.2 LOCATION Montrose Public Lands Center 2465 South Townsend Ave Montrose, CO 81401 1.3 WORK SCHEDULE Work shall occur Monday - Friday. Work shall not occur on Federal Holidays, the day after Thanksgiving and December 26-31. Work shall be completed within 180 days of the Notice to Proceed. Period of Performance: Work shall be completed within 180 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 236220 - Commercial and Institutional Building Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Best Value see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov
-Solicitation10/30/2026
Rocky Mountain Construction IDIQ Solicitation. Please see the attached solicitation, Amendment 01, Amendment 02 & Amendment 03 documents.
-Solicitation08/18/2026
DENA 332037 Eielson Roof Replacement
-Pre-SolicitationOpen

Additional Details

Solicitation Number

697DCK-23-R-00508

Archive Date

Apr 27, 2023

Office Address

FORT WORTH, TX, 76177