Birches Remedial Action, Demolition, And Groundwater Monitoring
Archived on January 3, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM CST
- Posted
- December 8, 2025
- Notice type
- Presolicitation
- Set-aside
- 8a Competed
- NAICS
- 562910: Remediation Services
- Agency
- Department of TransportationFEDERAL AVIATION ADMINISTRATION
Notice details
- Office
- 697DCK REGIONAL ACQUISITIONS SVCS
- Place of performance
- Tanana, Alaska, 99777
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
- Additional reporting
- Recovery Act
Identifiers
- Solicitation number
- 697DCK-26-R-00076
- Notice ID
- b838be64d598406cab3db24c4a25d4af
Description
The FAA has a requirement for Remedial Action, Demolition, And Groundwater Monitoring in Birches Alaska at the Birches VHF. Below is an abbreviation of the statement of work and no attachments will be provided until solicitation.
- Contractor must remove all known PCB, lead, and petroleum impacted soils at the Engine Generator Building and transport the soil off-site for treatment or disposal in the quantities specified.
- The objective of this removal is to remove contaminants above ADEC Method Two Cleanup Levels.
- All excavations must be guided by field screening methods, including the use of a photoionization detector (PID), X-ray fluorescence (XRF) analyzer, and visual and olfactory observations. The removal area is approximately 5,160 sq ft, with contamination extending from the surface to 15 ft below ground surface (bgs).
- The contractor is responsible for dewatering and managing saturated soils as necessary to complete the scope of work.
- Field-screening and analytical samples must be collected from excavations and stockpiles at frequencies consistent with Tables 2A and 2B of the ADEC Field Sampling Guidance.
- Monitoring well destroyed or damaged as part of the remedial action must be replaced and developed. Due to the remote nature replacement installation via excavator is acceptable to the FAA.
- Demolition consists of the removal of Engine Generator Building Concrete Foundation and Electronics Building Concrete Foundation.
- Birches is not an active FAA facility and therefore does not have generator status nor an Environmental Protection Agency (EPA) or TSCA ID for shipping purposes. The Contractor is responsible for obtaining the appropriate ID on behalf of the FAA necessary to manifest the waste generated.
- The EPA requires in 40 CFR Part 265.16 all personnel working on hazardous waste sites to be trained in hazardous waste management procedures, and emergency response.
- The Contractor must conduct both horizontal and vertical surveys of all groundwater water and soil sample locations, as well as any additional sites deemed relevant to the project
- To accommodate various approaches, limited work seasons, and space constraints this project may be executed in calendar year 2026 and/or 2027.
- Contractor must coordinate all field activities with the CO and FAA Project Engineer. Schedule must be mutually agreed upon by the Contractor and FAA Project Engineer.
***Birches is not connected to the road system and lacks any infrastructure. The land is owned by Doyon, Limited. During previous projects, personnel accessed the site by boat from Tanana or by floatplane from Fairbanks, while heavy equipment and supplies were delivered by barge from Nenana and staged on the riverbank.
In order to better understand the market for this potential requirement, the FAA requests the following information from interested SEDB 8(a) certified vendors:
1. Name of Company (the resultant Prime contractor that may ultimately be awarded the subsequent contract)
2. Address
3. Point of Contact name, email address and telephone number
4. UEI Number
5. Relevant experience on similar projects within the last five years. Please provide specific contract numbers, contact names and email information to support claimed capabilities.
The System for Award Management (SAM) registration for interested Contractors must show that they are an active SBA certified 8(a) program participant or the interested Contractor must provide a copy of their SBA 8(a) certification letter in their response to this notice to be considered for inclusion in the future solicitation.
Please submit your capability statement and the above information to Sonia.o.holguin@faa.gov no later than December 19, 2025 at 1200 Central Time.
Failure to respond to this pre-solicitation with all of the requested information will preclude a Contractor’s ability to receive a copy of the future solicitation. Limit complete responses to no more than five pages. Information will not be released; however, mark PROPRIETARY on all documents submitted, as applicable.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3PresolicitationArchivedCurrent
Birches Remedial Action, Demolition, And Groundwater Monitoring
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Federal Aviation Administration (FAA) contemplates issuing a Screening Information Request (SIR) for Remedial Action (RA) activities at the Kahuku Point Former Radio Range site (Site), located on the North Shore of Oahu, Hawaii. Activities include excavating 3,768 tons of soil contaminated with lead and polychlorinated biphenyls (PCBs) and disposing of the soil offsite according to applicable regulations. The purpose of this pre-solicitation is to solicit statements of interest and capabilities from Small Business Administration (SBA) small business concerns capable of performing the type of work described in this notice. The Contractor will provide all equipment, supplies, labor, transportation, and supervision necessary to perform the tasks described in the scope of work (SOW), not attached. The SOW includes, but is not limited to, the following: - The Contractor must excavate contaminated soil that was identified in reports that will be available at time of solicitation. - The Contractor must arrange for proper storage, transport, and disposal of all investigation-derived waste (IDW) generated from this RA, including necessary sampling for proper disposal. Backfilling of the excavated area will not be required. - Excavation, hauling, and disposal, quantities are as follows: Area to be excavated: 3.2 acres. Average depth of excavation: 1 foot. Average density of excavated soil excavation reports at the site): 0.73 tons per cubic yard. Total tons to be excavated: 3,768 tons. - The Contractor must decommission and remove the five (5) groundwater monitoring wells at the Site. The wells must be decommissioned according to the regulatory requirements of HDOH. The wells are very shallow and will not require the use of a drill rig for removal. - The Contractor must identify all buried utility systems where subsurface work will take place. A request for locate services with the appropriate public utility dig-line for the area must be filed within the required timeline prior to site work. - The Contractor must use GIS to generate the survey coordinates of the perimeters of the DUs to be excavated according to the attached Figure 2. The perimeters of the DUs to be excavated must be located in the field to the horizontal accuracy of 1 foot. - The Contractor is responsible for obtaining all permits and permissions and submitting all notifications required to complete this scope of work. - The Contractor is required to submit pre and post project documentation for this contract. Acceptance of Contractor submittals is subject to the approval of the FAA and other local, state, and federal regulatory agencies as applicable to the specific project. - Confirmation sampling is not required in this solicitation. Any sampling and analysis required for waste characterization purposes must be conducted according to requirements of the facility accepting the waste. In order to better understand the market for this potential requirement, the FAA requests the following information from interested small business vendors (no preference given at this time): 1. Name of Company (the resultant Prime contractor that may ultimately be awarded the subsequent contract) 2. Address 3. Point of Contact name, email address and telephone number 4. UEI Number 5. Relevant experience on similar projects within the last five years. Please provide specific contract numbers, contact names and email information to support claimed capabilities. Please submit your capability statement and the above information to Sonia.o.holguin@faa.gov no later than November 5, 2026 by 1500 Central Daylight Savings Time. Failure to respond to this pre-solicitation with the information requested above will preclude a Contractor’s ability to receive a copy of the future solicitation. Subsequent award will be made on lowest price technically acceptable basis. Limit complete responses to no more than five pages. Information will not be released; however, mark PROPRIETARY on all documents submitted, as applicable. Funds are not currently available for this requirement. | - | Pre-Solicitation | 11/05/2026 |
Fairchild Air Force Base (AFB) Optimized Remediation Contract (ORC) Draft Request for Proposal (RFP) Industry Questions and Government Answers/Responses. FA8903-25-R-0035 will be revised to FA8903-26-R-0019. Primary Point of Contact is the Contracting Officer, Mr. Christopher L. Keyes, at christopher.keyes.2@us.af.mil. | - | Pre-Solicitation | 03/31/2026 |
Providing the DRAFT RFP question and answers for the Mississippi Group Optimized Remediation Contract at Columbus Air Force Base and Keesler Air Force Base, Mississippi. | - | Special Notice | Open |
Department of Transportation /Maritime Administration has a need for Removing and Scrapping Three Steel Underground NO.2 Heating Oil Storage Tanks at Delano & O’Hara Hall (SOW) for USMMA. Site visit is scheduled on Tuesday, August 25, 2026 at 10:30am at USMMA. See the RFQ for emailing attendees names by Monday, August 24, 2026 before 12pm ET. All questions are due by August 26, 2026, 2pm ET and The RFQ will close on September 9, 2026 due to time constraints. All proposals must be emailed to durba.ray@dot.gov before the close of the RFQ. Past Peformance questionnaires must be directly email by the offeror's reference directly to durba.ray@dot.gov before the close of the RFQ. See the RFQ and it's attachments. The purpose of amendment one is to extend the RFQ closing date to Septmeber 11, 2026, 2PM ET. Incorporate Attachment 1- Amendmen One - Updated RFQ and incorporate and attach Attachment 2-Amendment one - Questions and answers under the RFQ. All terms and conditions remain unchanged. No extension or additional questions will be allowed due to time constraints of the requirement to be awarded by Septmeber of 2026. All Volumes to the RFQ must be emailed to durba.ray@dot.gov and cc brian.wiley.ctr@dot.gov prior to the close of the RFQ. Past Performance questionniares must be directly sent to durba.ray@dot.gov offeror's reference. Amendment two is issued to delete clause FAR 52.211-12 Liquidated Damages- Construction (Sept 2000) from section F.4 of the solicitation in it's entirety and to extend the RFQ closing date to Monday, September 14, 2026, 11:30AM. EST. All terms and conditions remain unchanged. Do not forget to submit the signed Amendment two with your propropsal prior to the close of the RFQ. Past Performance questionnires must be emailed directly to durba.ray@dot.gov by the offerors reference before the close of the RFQ. Amendment three is issued to extend the RFQ closing date to 9/15/2026, 11:30am ET. All other terms and conditions remain unchanged. Submit all signed SF1449 and all (SF30) amendments. Acknowledge Amendment three with your proposal. | - | Solicitation | 09/15/2026 |
EV32, NIROP Fridley Site 5 O M, 8aThe goal of this Contract Task Order (CTO) is to allow for the completion of tasks necessary to the Navy Environmental Restoration Program (NERP) at former Naval Industrial Reserve Ordnance Plant (NIROP)Groundwater Treatment Facility GWTF located at 54 Northern Stacks Drive in Fridley, Minnesota the former location of NIROP Fridley. These tasks are ongoing and support the management, implementation and execution of the NERP at NIROP Fridley Minnesota | - | Awarded | Open |
Additional Details
Solicitation Number
697DCK-26-R-00076
Archive Date
Jan 3, 2026
Office Address