GovChime
Notice ID: 2ce105568e5503883fecfcab4d9e65fbSolicitation

CO FLAP CHA306(1), Cottonwood Pass East Side

Archived on May 1, 2018. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
April 6, 2018
Notice type
Solicitation
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
San Isabel National Forest , CO
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025

Identifiers

Solicitation number
6982AF18B000003
Notice ID
2ce105568e5503883fecfcab4d9e65fb

Description

PROJECT DETAILS: CO FLAP CHA 306(1) Cottonwood Pass East Side This 18.5 mile project is for improvements to Chaffee County Road 306, known as the east side of Cottonwood Pass, located in Chaffee County, Colorado. The project starts at the summit (Gunnison/Chaffee County Line) and ends at County Road 321 (Rodeo Road) at the Town Limits of Buena Vista, CO. Major work items include approximately: • 19,000 CUYD of Roadway Excavation • 10,700 CUYD of Subexcavation • 1,500 CUYD of Rock Buttress • 18.5 Miles of Full Depth Reclamation, 8-Inch Depth • 56,000 Tons of Asphalt Concrete Pavement • 1,000 LNFT of 24-Inch Corrugated Metal Pipe • 9,000 LNFT of MGS Guardrail ESTIMATED Cost: The estimated cost of construction is between $12 and $17 million. SCHEDULE: It is anticipated that advertisement for this project will occur in Winter 2017 with an award in early 2018. A portion of the road will be closed to public travel within the project limits for the duration of the project, with the remainder utilizing pilot cars and flaggers for traffic control. The anticipated completion date is fall of 2018. Additional Information: Cottonwood Pass Road begins at an elevation of 8,000 feet and reaches a height of 12,110 feet at the summit. The upper reaches are characterized by rugged topography and adverse climatic conditions. The adjacent terrain is generally steep with tall slopes. This project is in a sensitive natural setting. The west side of Cottonwood Pass (Gunnison County Road 209) is anticipated to remain closed to public traffic for the majority of the 2018 construction season due to a separate project. County Road 306 is a Chaffee County facility and the project lies within the San Isabel National Forest. The Federal Highway Administration, Central Federal Lands Highway Division is the contracting agency and will be administering this construction contract.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:6982AF18B000003
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 11×
    Pre-SolicitationOct 10, 2017

    CO FLAP CHA306(1), Cottonwood Pass East Side

    Notice 67b87ddefcbbeb9bf5a3192857f868bc on SAM.gov

  2. AwardedApr 6, 2018

    CO FLAP CHA306(1), Cottonwood Pass East Side

    Notice cddd690e361ff38bf69cd1cb8966d44d on SAM.gov

  3. SolicitationCurrentApr 6, 2018

    CO FLAP CHA306(1), Cottonwood Pass East Side

    Notice 2ce105568e5503883fecfcab4d9e65fb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF18B000003

Archive Date

May 1, 2018

Office Address

LAKEWOOD, CO, 80228