Notice ID: 4617788ceb8ea4c7af471f49f27fb2e8Award NoticeAwarded
NV/AZ FTBR US93(2), Hoover Dam Access Road
Awarded on February 14, 2018. Full description on SAM.gov.
Awarded tounder 6982AF18C000013 (source: SAM.gov award notice)• $2.2M
Overview
- Posted
- February 15, 2018
- Notice type
- Award Notice
Notice details
- Place of performance
- Hoover Dam, Boulder City, NV, 89005
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Feb 14, 2018
- Award amount (SAM.gov award notice)
- $2.2M
Identifiers
- Solicitation number
- 6982AF18B000007
- Notice ID
- 4617788ceb8ea4c7af471f49f27fb2e8
- Award number (PIID)
- 6982AF18C000013
Description
NV/AZ FTBR OLD US93(2), Hoover Dam Access Road The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the Bureau of Reclamation (BOR) is proposing to rehabilitate the Hoover Dam Access Road and associated parking lots through the NV/AZ FTBR OLD US93(2), Hoover Dam Access Road project. The Hoover Dam Access Road project is located at the Hoover Dam, approximately 33.5 miles east of Las Vegas, NV. The project does cross the dam, with work in both Nevada and Arizona. The project focuses on a pavement preservation approach to the existing roadway and parking lots, consisting of primarily surface treatments, ranging from a crack sealing and pavement patching to micro-surfacing, thin bonded overlays and pavement milling and asphalt overlays. SIGNIFICANT QUANTITIES (Schedule B): Schedule A: •· 40301-0100, Asphalt Concrete Pavement, Type 1, 1,600 TON •· 41801-2000, Asphalt Concrete Pavement Patch, Type 2, 2,100 SQYD •· 42901-0000, Ultra-Thin Bonded Wearing Course, 2,500 TON •· 63402-0300, Pavement Markings, Type B, Solid and Broken, 35.5 MILE Option X: •· 40901-2000, Micro Surfacing, Type 2, 38,850 SQYD •· 63402-0300, Pavement Markings, Type B, Solid, 13.0 MILE Option Y: •· 30402-5300, Full Depth Reclamation, Method 2, 6-Inch Depth, 6,500 SQYD •· 40301-0100, Asphalt Concrete Pavement, Type 1, 1,000 TON MISCELLANEOUS: The contractor will be required: •· To provide the Bureau of Reclamation a minimum of 3 days notice for all equipment and fuel being delivered to the project site. No equipment will be allowed to mobilize to the site and no fuel deliveries will be allowed without advance notification. •· Pay differing Davis-Bacon wage rates for Arizona and Nevada. The contractor will need to track the work in each state to insure the proper Davis-Bacon wages are paid where the work is performed. •· Provide a historical monitor for all construction operations within 3' of the historical rock wall located at Hoover Dam project site for Schedule A and Option X. •· Perform all asphalt milling, asphalt patch repairs, and asphalt concrete pavement placement during the night for Schedule A. •· Maintain traffic and traffic control to keep the traveling public safe during all construction operations. It is anticipated that the project will be advertised in December, 2017 with a Notice to Proceed issued in February, 2018.
Award Overview
Award Number
6982AF18C000013
Award Amount (SAM.gov award notice)
$2.2M
Award Date
Feb 14, 2018
Awardee
Awardee UEI
KGFXA94SLKF8
Original Solicitation
Notice ID: 4617788ceb8ea4c7af471f49f27fb2e8
Posted Date: Feb 15, 2018
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $14.0MSigned Jun 26, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
6982AF18B000007- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 8×Pre-SolicitationDec 4, 2017
NV/AZ FTBR US93(2), Hoover Dam Access Road
- SolicitationJan 24, 2018
NV/AZ FTBR US93(2), Hoover Dam Access Road
- AwardedCurrentFeb 15, 2018
NV/AZ FTBR US93(2), Hoover Dam Access Road
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF18B000007
Archive Date
Mar 1, 2018
Office Address
LAKEWOOD, CO, 80228