GovChime
Notice ID: 13d6a2a7531bd1eee817c85c4286a846Award NoticeAwarded

NM FLAP US60(1)

Awarded on August 23, 2018. Full description on SAM.gov.

Awarded tounder 6982AF18C000037 (source: SAM.gov award notice)• $6.2M

Overview

Posted
September 21, 2018
Notice type
Award Notice

Notice details

Place of performance
Old US Highway 60 approximately one mile south of the Bernardo/Mountainair exit (Exit 175) on Interstate 25 (I-25), Socorro County, NM
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025
Award date
Aug 23, 2018
Award amount (SAM.gov award notice)
$6.2M

Identifiers

Solicitation number
6982AF18B000023
Notice ID
13d6a2a7531bd1eee817c85c4286a846
Award number (PIID)
6982AF18C000037

Description

PROJECT DETAILS: NM FLAP US60(1), Old US60 Bridge THIS IS AN INVITATION FOR BID, FINAL PLANS AND SPECS ARE AVAILABLE. The project is located on Old US Highway 60 approximately one mile south of the Bernardo/Mountainair exit (Exit 175) on Interstate 25 (I-25). Old US Highway 60 serves as a primary link to Sevilleta National Wildlife Refuge and Bureau of Land Management lands, and a secondary link to Cibola National Forest. The project involves construction of a new 570' long bridge crossing the Rio Puerco River with roadway reconstruction on both ends, partial demolition of the existing bridge, safety improvements, and revegetation on disturbed surfaced outside the stream bed. SIGNIFICANT QUANTITIES (Schedule A): 20420-0000, EMBANKMENT CONSTRUCTION: 21,000 CUYD 25101-2200, PLACED RIPRAP, METHOD 2, CLASS 2: 950 CUYD 55101-2200, STEEL PIPE PILE, IN PLACE (24" X 1"): 1,107 LNFT 55201-0200, STRUCTURAL CONCRETE, CLASS A (AE): 610 CUYD 55401-2000, REINFORCING STEEL, EPOXY COATED: 174,078 LB 55502-0000, STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED: 764,300 LB 55601-0900, BRIDGE RAILING, STEEL (NM TYPE A32): 1,200 LNFT 65001-1000, CONSTRUCT AND MAINTAIN DIVERSION: LPSM MISCELLANEOUS: The successful bidder must submit demolition plan for the partial removal of the existing bridge and submit an erection plan for the new bridge construction. Both will need to be approved by Central Federal Lands Highway Division before construction can begin. The successful bidder will have to store all materials, stockpiles, and staging area outside of the active channel at elevation 4,730 feet. The successful bidder must notify New Mexico Environment Department (NMED) at least five days before starting construction to allow time to schedule monitoring or inspections. The successful bidder will not be allowed to store fuel, oil, hydraulic fluid, lubricants, or other petrochemicals within project limits. All equipment must be refueled at least 100 feet from surface water. The successful bidder must maintain access of the existing road and bridge to public traffic during construction of the new US60 Bridge. All construction equipment crossing the existing bridge must meet existing bridge restrictions including maximum vertical clearance of 14 feet; maximum horizontal width of 10 feet; and maximum weight of 10 tons. All equipment that does not meet the restrictions will have to utilize the diversion. All clearing activities will need to be completed between September 1, 2018 and April 14, 2019. The construction access stream diversion will need to be completely removed and stabilized by July 24, 2019. It is anticipated that this project will be advertised in AUGUST of 2018. The contracting range for this project is between $4 and $6 million. Notice to Proceed is anticipated August, 2018. Tentatively, the project will begin in August 2018 with a completion date in June 2019.

Full description on SAM.gov

Award Overview

Award Number

6982AF18C000037

Award Amount (SAM.gov award notice)

$6.2M

Award Date

Aug 23, 2018

Awardee

Awardee UEI

FDAALH4XFDL6

Original Solicitation

Notice ID: 13d6a2a7531bd1eee817c85c4286a846

Posted Date: Sep 21, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:6982AF18B000023
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 6×
    Pre-SolicitationJun 22, 2018

    NM FLAP US60(1)

    Notice ed125536a77e71063329f63707f328e7 on SAM.gov

  2. SolicitationAug 20, 2018

    NM FLAP US60(1)

    Notice 0a7c66ab3a49b2402e5187da32fb133f on SAM.gov

  3. AwardedCurrentSep 21, 2018

    NM FLAP US60(1)

    Notice 13d6a2a7531bd1eee817c85c4286a846 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF18B000023

Archive Date

Oct 5, 2018

Office Address

LAKEWOOD, CO, 80228