Notice ID: 75197ed0188e5db82b326202917ef923Solicitation
WY FLAP 6WX(1), Southfork Road
Archived on May 9, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- April 22, 2019
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- County Route 6WX Park County, WY
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 6982AF19B000004
- Notice ID
- 75197ed0188e5db82b326202917ef923
Description
The proposed project is located in Park County, Wyoming on County Route 6WX, also known as the Southfork Road. The project beings at the Cabin Creek Trailhead or end of the road (MP 42.7) and heads northeast approximately 15 miles. This project includes 7.3 miles of gravel rehabilitation and resurfacing, 6.3-7.5 miles of roadway reconstruction and paving, replacement of the EGF or Ishawooa Bridge and potential replacement of the Little Boulder Creek Bridge (on Hunter Creek Road). Significant items and quantities: Project will include excavation, aggregate base, surface course aggregate, paving, bridge, riprap, drainage, survey, erosion control, permanent and temporary traffic control, and revegetation. Major quantities include: • 60 +/- acres of clearing and grubbing • 65,000 +/- cuyd of roadway excavation • 2,500 +/- cuyd of riprap • 180 +/- cuyd of structural concrete • 180,000 +/- lbs of structural steel • 18,000 +/- cuyd of surface course aggregate • 26,000 +/- cuyd of aggregate base course • 21,000 +/- tons of Superpave PavementWolfsen Road (Local Route R337). The Southfork Road will remain open during construction. Delay and one-lane road scenarios will be allowed. Weather conditions on this route are extreme; cold weather and snow are likely during fall, winter and spring months. Snow pack recession time frame varies, and is dependent upon accumulation and temperatures. Anticipated Anticipated Construction Duration: April 2019 through November 2019 Note: Note that the weather conditions on this route are extreme; cold weather and snow are likely during fall, winter, and spring months. Snow pack recession timeframe varies, and is dependent upon accumulation and temperatures. Anticipated Award Amount: $7-12M
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Select documents to download
Showing 10 of 20 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Apr 22, 2019 | - |
Showing 1 to 10 of 20 results
Lifecycle
Solicitation:
6982AF19B000004- Pre-Solicitation
- Solicitation
- Awarded
Award typically follows within 30–90 days after the response deadline. (estimate)
- 10×Pre-SolicitationFeb 12, 2019
WY FLAP 6WX(1), Southfork Road
- Pre-SolicitationApr 22, 2019
WY FLAP 6WX(1), Southfork Road
- SolicitationCurrentApr 22, 2019
WY FLAP 6WX(1), Southfork Road
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Project No. ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements See attachments for Request for Proposal (RFP), plans, and phyiscal data files. THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS: *Contract No. 69056725D000002 Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION Address: 217 College Ave. STE 5, Orofino, ID 83544 Phone: 208-476-3617 *Contract No. 69056725D000003 Contractor: GRANITE CONSTRUCTION Address: 585 W Beach St., Watsonville, CA 95076 Phone: 360-606-1335 *Contract No. 69056725D000004 Contractor: HAMILTON CONSTRUCTION Address: 2213 South F Street, Springfield, OR 97477 Phone: 541-746-2426 *Contract No. 69056725D000005 Contractor: M.A. DEATLEY CONSTRUCTION, INC. Address: 829 Evans Road, Clarkston, WA 99403 Phone: 509-751-1580 *Contract No. 69056725D000006 Contractor: MJ HUGHES CONSTRUCTION, INC. Address: 11510 NE 87TH AVE, Vancouver, WA 98662 Phone: 360-314-2024 *Contract No. 69056725D000007 Contractor: THOMPSON CONTRACTING, INC Address: 502 Gruber Rd., Libby, MT 59923 Phone: 406-293-5392 THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE PRIME CONTRACTORS. This information is also available on our website: Idaho, Montana and Surrounding Areas MATOC:https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-andsurrounding-areas-idiq-matoc Interested Vendor List The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. | 83% | Solicitation | 12/08/2026 |
Update 09/14/2026: QA_09.14.26.pdf posted to attachments. PROJECT: ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements LOCATION: The project is located along Dent Bridge Road in Clearwater County, Idaho, beginning at the Cedar Street intersection in Orofino, northeast to the Wells Bench Road intersection. WORK: This project consists full depth pavement reclamation, asphalt concrete pavement, shoulder reconditioning, deep patch repair, intermittent guardrail improvements, signing, and striping. See “Project Description” posted under Attachments for additional details. LENGTH: 4.8 miles TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $5,000,000 and $ 10,000,000. INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Idaho, Montana, and Surrounding Areas MATOC contractors. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc. This project is anticipated to be solicited Fall/Winter 2026. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | 83% | Pre-Solicitation | Open |
Update 11/12/2026: QA_11.12.2026.pdf posted to Attachments. Update 11/10/2026: QA_11.10.2026.pdf posted to Attachments. Update 11/09/2026: QA_11.09.2026.pdf posted to Attachments. Update 11/04/2026: Amendment A001 and QA_11.04.2026.pdf posted to Attachments. Update 10/29/2026: QA_10.29.2026.pdf posted to Attachments. Project: ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 See attachments for Request for Proposal (RFP), plans, and phyiscal data files. THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS: *Contract No. 69056725D000002 Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION Address: 217 College Ave. STE 5, Orofino, ID 83544 Phone: 208-476-3617 *Contract No. 69056725D000003 Contractor: GRANITE CONSTRUCTION Address: 585 W Beach St., Watsonville, CA 95076 Phone: 360-606-1335 *Contract No. 69056725D000004 Contractor: HAMILTON CONSTRUCTION Address: 2213 South F Street, Springfield, OR 97477 Phone: 541-746-2426 *Contract No. 69056725D000005 Contractor: M.A. DEATLEY CONSTRUCTION, INC. Address: 829 Evans Road, Clarkston, WA 99403 Phone: 509-751-1580 *Contract No. 69056725D000006 Contractor: MJ HUGHES CONSTRUCTION, INC. Address: 11510 NE 87TH AVE, Vancouver, WA 98662 Phone: 360-314-2024 *Contract No. 69056725D000007 Contractor: THOMPSON CONTRACTING, INC Address: 502 Gruber Rd., Libby, MT 59923 Phone: 406-293-5392 THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE PRIME CONTRACTORS. This information is also available on our website: Idaho, Montana and Surrounding Areas MATOC:https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. | 80% | Solicitation | 11/13/2026 |
PROJECT: ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 LOCATION: 7.5 Miles E of Coeur D’Alene WORK: The work consists of installation of a new structure, realigning and reconstructing the roadway, and stabilizing the rock-mass below the structure. The project includes a single-span precast, prestressed concrete structure, approx. 55 feet in length. See “Project Description” posted under Attachments for additional details. LENGTH: 0.20 miles TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $2,000,000 and $ 5,000,000. INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Idaho, Montana, and Surrounding Areas MATOC contractors. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc. (added to Attachments/Links) This project is anticipated to be solicited Fall 2026. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | 80% | Pre-Solicitation | Open |
NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Idaho, Montana, and Surrounding Areas MATOC contractors. PROJECT: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road LOCATION: 7 miles south of Kuna, Idaho WORK: This project consists of shoulder widening, paving, signage, parking lot improvement, and culvert replacement. See “Project Description” and preliminary plans posted under Attachments for additional details. LENGTH: Up to 8.5 miles This project will include 4 bid schedules. Only one schedule will be awarded. TETATIVE SOLICITATION DATE: Summer 2026 TENTATIVE COMPLETION DATE: Summer 2027 CONTRACT TYPE: MATOC Task Order; Firm-Fixed-Price ESTIMATED PRICE RANGE: Between $5,000,000 and $ 10,000,000 . INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. Contractor Information on the IDIQ contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | 73% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
6982AF19B000004
Archive Date
May 9, 2019
Office Address
LAKEWOOD, CO, 80228