GovChime
Notice ID: afc0f81e80a743f5b81bf8e9d40ee2a2Award NoticeAwarded

WY TIGER US212(9) Beartooth Roadway

Awarded on February 28, 2020. Full description on SAM.gov.

Awarded tounder 6982AF20C000018 (source: SAM.gov award notice)• $25.0M

Overview

Posted
February 29, 2020
Notice type
Award Notice

Notice details

Place of performance
Shoshone National Forest Park County, Wyoming, WY, 82414
Last updated
Dec 4, 2025
Award date
Feb 28, 2020
Award amount (SAM.gov award notice)
$25.0M

Identifiers

Solicitation number
6982AF19B000008
Notice ID
afc0f81e80a743f5b81bf8e9d40ee2a2
Award number (PIID)
6982AF20C000018

Description

THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. PROJECT DETAILS: This project is being developed in cooperation with the Shoshone National Forest (SNF), the Wyoming Department of Transportation (WYDOT), and the National Park Service (NPS). The Beartooth Highway in Wyoming begins at the Wyoming/Montana State Line east of Cooke City, Montana, following US 212 for 56.1 kilometers to the Wyoming/Montana State Line southwest of Red Lodge, Montana. The project is located entirely within the Shoshone National Forest and is maintained by the NPS out of Yellowstone National Park. In addition to being a Forest Highway, the route carries the special designation as a National Park Approach Road, a Scenic Byway, and All American Road. This project includes realignment and reconstruction of 2.61 km (1.6 miles) of roadway and a new bridge on U.S. 212, otherwise called Beartooth Highway. The project is located at an elevation of 10,950 feet with an anticipated construction season of 4-6 months per year. This project is located in an environmentally sensitive remote location with potential for unusually severe weather. TYPE OF CONSTRUCTION: Roadway realignment, reconstruction, rock excavation, grading, drainage, 600 ft steel bridge, MSE walls, aggregate base course, and paving, traffic control, public information. This project consists of: Principal work items on Schedule A include: 44,000 cm (cubic meters) of roadway excavation; 800 cm structural backfill; 2,400 m2 (square meters) mechanically stabilized earth wall; 25,000t (metric tons) aggregate base; 5,000t of hot asphalt paving; 10,000 m2 pulverizing; 2,000 cm structural concrete; 291,700 kg structural steel, furnished, fabricated and erected; 475m of pipe culvert placement; 6 Ha (hectares) hydraulic seeding; 580 L (liters) of pavement markings; 9,000 flagger hours. This project will have one Schedule and four Options; Option W includes .68 miles of roadway improvements, Option X will be used for plantings and landscaping, Option Y places stone masonry on the bridge, and Option Z constructs masonry guide signs along the project. Estimated total cost for the project is $14,000,000 to $17,000,000.

Full description on SAM.gov

Award Overview

Award Number

6982AF20C000018

Award Amount (SAM.gov award notice)

$25.0M

Award Date

Feb 28, 2020

Awardee

Awardee UEI

HAYCE9S7YYX3

Awardee CAGE Code

7Q5X6

Original Solicitation

Notice ID: afc0f81e80a743f5b81bf8e9d40ee2a2

Posted Date: Feb 29, 2020

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 69056726F00069N
    MISSOURI RIVER CONTRACTORS, LLC
    Department of TransportationNAICS 237310
    $1.6MSigned Aug 12, 2026
  • 69056726F00005N
    MISSOURI RIVER CONTRACTORS, LLC
    Department of TransportationNAICS 237310
    $2.1MSigned Jul 23, 2026
  • 69056724D000012
    MISSOURI RIVER CONTRACTORS, LLC
    Department of TransportationNAICS 237310
    —Signed Jul 1, 2026
  • 69056724C000018
    MISSOURI RIVER CONTRACTORS, LLC
    Department of TransportationNAICS 237310
    $12.8MSigned Jun 25, 2026
  • 69056726F00069N
    MISSOURI RIVER CONTRACTORS, LLC
    Department of TransportationNAICS 237310
    $1.6MSigned May 19, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:6982AF19B000008
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 20×
    Pre-SolicitationMar 13, 2019

    WY TIGER US212(9) Beartooth Roadway

    Notice 2962e79c9c2529867608db2d563998f9 on SAM.gov

  2. 2×
    SolicitationJul 1, 2019

    WY TIGER US212(9) Beartooth Roadway

    Notice 824c88a56330208733d7bc20c2005684 on SAM.gov

  3. AwardedCurrentFeb 29, 2020

    WY TIGER US212(9) Beartooth Roadway

    Notice afc0f81e80a743f5b81bf8e9d40ee2a2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF19B000008

Archive Date

Mar 14, 2020

Office Address

LAKEWOOD, CO, 80228