Notice ID: e5178b9c0f874602ad85575769316a67Award NoticeAwarded
CA FLAP CR 109(1), Sir Francis Drake Blvd. and Point Reyes Roads
Awarded on February 13, 2020. Full description on SAM.gov.
Awarded tounder 6982AF20C000016 (source: SAM.gov award notice)• $45.7M
Overview
- Posted
- February 13, 2020
- Notice type
- Award Notice
Notice details
- Place of performance
- Point Reyes National Seashore, CA
- Last updated
- Dec 4, 2025
- Award date
- Feb 13, 2020
- Award amount (SAM.gov award notice)
- $45.7M
Identifiers
- Solicitation number
- 6982AF19B000023
- Notice ID
- e5178b9c0f874602ad85575769316a67
- Award number (PIID)
- 6982AF20C000016
Description
CA FLAP CR109(1) & FTNP PORE 10(4), 200(1), & 201(1) Sir Francis Drake Boulevard & Limantour, Lighthouse, and Chimney Rock Roads & Pavement Preservation PROJECT DETAILS: This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 12.9 miles of roadway and pavement preservation of approximately 20.9 miles of roadway within Point Reyes National Seashore (PRNS) in Marin County, California. Rehabilitation and reconstruction is included on 12.0 miles of Sir Francis Drake Boulevard (SFDB) from Pierce Point Road to Chimney Rock/Lighthouse Roads (including bridge construction at Schooner Creek), and on 0.9 miles of Chimney Rock Road. Pavement preservation is included on 7.5 miles of Limantour Road, 1.5 mile of Lighthouse Road and 11.9 miles of various roadways and parking areas within PRNS. Also included is construction of a 2-acre wetland restoration site at the existing Drakes Beach parking lot. The estimated price range is over $30,000,000. Principle work items include 45,000 tons of superpave hot asphalt concrete pavement, 40,000 cubic yards of roadway excavation and embankment, 13,000 cubic yards of subexcavation, 25,000 tons of roadway aggregate, 145,000 square yards of pulverizing, 260,000 square yards of asphalt surface treatment (chipseal), and 30,000 square yards of micro-surfacing. Additional work includes replacement of the two existing 84-inch culverts at the Schooner Creek crossing of SFDB with a 56-foot-long prestressed concrete voided slab bridge including 80 cubic yards of structural concrete and 350 linear feet of 30-inch drilled shafts. Additional drainage improvements including culvert cleaning, lining and replacement, reconstruction and rehabilitation of multiple parking areas, 20,000 linear feet of asphalt curb, 5,000 square yards of asphalt paved ditch, and 4,500 linear feet of concrete curb and gutter. All of the work is occurring in cultural and natural resource sensitive areas. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control and timely completion of work. This is a full and open solcitiation.
Award Overview
Award Number
6982AF20C000016
Award Amount (SAM.gov award notice)
$45.7M
Award Date
Feb 13, 2020
Awardee
Awardee UEI
CG9LLGDTW3E4
Original Solicitation
Notice ID: e5178b9c0f874602ad85575769316a67
Posted Date: Feb 13, 2020
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
6982AF19B000023- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationOct 3, 2019
CA FLAP CR 109(1), Sir Francis Drake Blvd. and Point Reyes Roads
- 11×SolicitationNov 4, 2019
CA FLAP CR 109(1), Sir Francis Drake Blvd. and Point Reyes Roads
- AwardedCurrentFeb 13, 2020
CA FLAP CR 109(1), Sir Francis Drake Blvd. and Point Reyes Roads
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF19B000023
Archive Date
Feb 28, 2020
Office Address
LAKEWOOD, CO, 80228