GovChime
Notice ID: ea49bfd139f8db9b756de9d7332c2911Combined Synopsis/Solicitation

CO FTFW TWPO 900(2)Two Ponds Visitor Parking Lot Rehabilitation

Archived on October 8, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−07:00
Posted
September 5, 2019
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Two Ponds National Wildlife Refuge 9210 W 80th Avenue , Avarda, CO, 80005
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Jan 23, 2026

Identifiers

Solicitation number
6982AF19Q000026
Notice ID
ea49bfd139f8db9b756de9d7332c2911

Description

This project will consist of the removal and replacement of the existing pavement and grade adjustments to meet ADA requirements to retrofit a concrete pad for two parking stalls and aisles. Work also includes the removal and replacement of sidewalk, curb and gutter, sign replacement, and parking markings. The existing bike rack located on the median will be removed and reset in a new location. The location of work is in the Two Ponds National Wildlife Refuge parking lot located near the corner of W. 80th Avenue and Kipling Street in Arvada, Colorado. This work consists of moving personnel, equipment, material, and incidentals to the project and performing all necessary work to mobilize and demobilize to and from the site to perform all work included in this contract. Mobilization includes the obtaining of permits, insurance, and bonds. Also included is any testing and survey required to complete the work. Mobilization: This work consists of moving personnel, equipment, material, and incidentals to the project and performing all necessary work to mobilize and demobilize to and from the site to perform all work included in this contract. Mobilization includes the obtaining of permits, insurance, and bonds. Also included is any testing and survey required to complete the work. Asphalt Concrete Pavement: This item includes the removal and disposal of the existing asphalt concrete pavement, the conservation and reconditioning of the aggregate base, and all necessary work and materials for the placement of new asphalt. Included in this item is additional aggregate base necessary to raise grade and maintain the structural section. Minor Concrete Pavement: This item includes all necessary work and materials to grade, form, reinforce, pour and cure the ADA concrete pad and bike rack pad. Included in this item is additional aggregate base necessary to raise grade and maintain the structural section at the concrete ADA pad. Also included is the labor and material used to relocate the bike rack to the new concrete pad and attach. Concrete Curb and Gutter: This item covers all necessary work and materials necessary to grade, form, pour and cure the curb and gutter. The concrete curb and gutter item includes the removal and disposal of the existing curb and gutter and additional aggregate base necessary to raise grade, maintain the structural section, and backfill new curb. Also included is the yellow paint to mark a no parking zone. Concrete Sidewalk: This item includes the work and materials needed to form, place and cure the concrete sidewalk. The concrete sidewalk item includes removal and disposal of the existing median sidewalk and ADA ramp and additional aggregate base necessary to raise grade and maintain the structural section. Also included is any potholing necessary to ensure the underground electrical cables will not be disturbed when constructing the sidewalk. Striping and Pavement Markings: This item includes the work and materials necessary to reestablish the parking stall striping and paint new pavement markings as noted in the signing and pavement markings plan. Sign System: This item includes the removal of existing signage and installation of new signage as noted in the signing and pavement markings plan. Also included is furnishing signs, posts, and mounting hardware. Temporary Traffic Control: This item includes setup, operation, maintenance, and removal of temporary traffic control for the duration of the project. Traffic control devices include temporary construction signs, barricades and cones, to allow closure of the parking lot during construction. No Site Visit is scheduled at this time, but prospective quoters are encouraged to visit the work site on there own. Magnitude of the requirement; Between $100,000 and $250,000. Commencement, Prosecution, and Completion of Work. Follow the requirements of FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work. Complete all work by 10/31/2019.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationFEDERAL HIGHWAY ADMINISTRATIONSep 5, 2019-
Combined Synopsis/SolicitationFEDERAL HIGHWAY ADMINISTRATIONSep 5, 2019-
Combined Synopsis/SolicitationFEDERAL HIGHWAY ADMINISTRATIONSep 5, 2019-
Combined Synopsis/SolicitationFEDERAL HIGHWAY ADMINISTRATIONSep 5, 2019-

Lifecycle

Solicitation:6982AF19Q000026
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentAug 13, 2019

    CO FTFW TWPO 900(2)Two Ponds Visitor Parking Lot Rehabilitation

    Notice ea49bfd139f8db9b756de9d7332c2911 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF19Q000026

Archive Date

Oct 8, 2019

Office Address

LAKEWOOD, CO, 80228