Notice ID: f1d98fd9d5624c41b95a2ea9abfad8f1Solicitation
TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads
Archived on September 20, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−06:00
- Posted
- September 3, 2020
- Notice type
- Solicitation
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Big Bend National Park
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 6982AF20B000028
- Notice ID
- f1d98fd9d5624c41b95a2ea9abfad8f1
Description
THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS. THIS IS A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT NUMBER: TX FTNP BIBE 14(2) 13(5) 11(3) PROJECT NAME: Chisos Basin, West, North Entrance Roads PROJECT DESCRIPTION: Work on approximately 2.3 miles of the Chisos Basin Road, from the West Entrance Road to the Campground intersection. Work includes road rehabilitation on its current alignment and at its current width. The rehabilitation would consist of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The first section of repair work on the West Entrance Road would begin at the Park boundary and continue for approximately 1.1 miles. Repair of this section would include approximately sub excavation, replacement of the subgrade, concrete paving, and base and repaving. The remaining road length would be pulverized, shaped and paved. The second section being reconstructed 700 to 500 feet in length construction will include sub excavation, subgrade work, base, asphalt and concrete paving. COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $6,500,000 to $9,000,000. CONSTRUCTION DURATION: October, 2020 through February, 2021 ADDITIONAL INFORMATION: Anticipated Advertisement: July, 2020 Anticipated Bid Opening: August, 2020 Anticipated Award: September, 2020
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Leslie Karsten
Secondary Contact
Ryan Phillips
Documents
No documents available.
Lifecycle
Solicitation:
6982AF20B000028- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 18, 2020
TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads
- 6×SolicitationCurrentJul 20, 2020
TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF20B000028
Archive Date
Sep 20, 2020
Office Address
LAKEWOOD, CO, 80228