GovChime
Notice ID: f1d98fd9d5624c41b95a2ea9abfad8f1Solicitation

TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads

Archived on September 20, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−06:00
Posted
September 3, 2020
Notice type
Solicitation
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Big Bend National Park
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF20B000028
Notice ID
f1d98fd9d5624c41b95a2ea9abfad8f1

Description

THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS. THIS IS A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT NUMBER: TX FTNP BIBE 14(2) 13(5) 11(3) PROJECT NAME: Chisos Basin, West, North Entrance Roads PROJECT DESCRIPTION: Work on approximately 2.3 miles of the Chisos Basin Road, from the West Entrance Road to the Campground intersection. Work includes road rehabilitation on its current alignment and at its current width. The rehabilitation would consist of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The first section of repair work on the West Entrance Road would begin at the Park boundary and continue for approximately 1.1 miles. Repair of this section would include approximately sub excavation, replacement of the subgrade, concrete paving, and base and repaving. The remaining road length would be pulverized, shaped and paved. The second section being reconstructed 700 to 500 feet in length construction will include sub excavation, subgrade work, base, asphalt and concrete paving. COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $6,500,000 to $9,000,000. CONSTRUCTION DURATION: October, 2020 through February, 2021 ADDITIONAL INFORMATION: Anticipated Advertisement: July, 2020 Anticipated Bid Opening: August, 2020 Anticipated Award: September, 2020

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Leslie Karsten

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:6982AF20B000028
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 18, 2020

    TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads

    Notice b398c69f9cc0443d9cdeb01f9db5fc19 on SAM.gov

  2. 6×
    SolicitationCurrentJul 20, 2020

    TX FTNP BIBE 14(2) 13(5) 11(3) Chisos Basin, West, North Entrance Roads

    Notice f1d98fd9d5624c41b95a2ea9abfad8f1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF20B000028

Archive Date

Sep 20, 2020

Office Address

LAKEWOOD, CO, 80228