UT FTFW OURA 11(1), Auto Tour Route
Archived on August 28, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- August 13, 2020
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- UT, 84026
- Last updated
- Apr 29, 2026
Identifiers
- Solicitation number
- 6982AF20B000030
- Notice ID
- 5f11842838b3446caff281fe79ee6b98
Description
THIS IS AN INVITATION FOR BID, PLANS AND SPECS ARE AVAILABLE AT THIS TIME. Ouray National Wildlife Refuge is managed as part of the Lower Green River Complex as a sanctuary for migratory birds, threatened and endangered species, and species of special concern. The Auto Tour Route (RTE 011) is a 4.7 mile loop road that provides access to the southwest portion of the refuge which primarily consists of riparian, wetland, and grassland habitat. During periods of high flows in the Green River, primarily during peak spring runoff, large portions of the southern segment of the roadway inundates with flood water, requiring a full road closure. The purpose of the project is to improve access to this portion of the refuge by providing turn around locations that allow the east and west segments of the Auto Tour Route (RTE 011) to remain open during periods of high flows. The project also improves safety and provides for longer term access at one location by shifting the roadway alignment away from an area of river bank erosion. The project consists of roadway rehabilitation and aggregate surface course resurfacing of approximately 1.64 miles of the northwest segment and 1.51 miles of the northeast segment of the Auto Tour Route (RTE 011) and 0.04 miles of an adjacent Fishing Access spur. The northeast segment also includes 982 feet of roadway realignment away from an area of embankment instability along the Green River bank and realignment of the intersection at the Refuge Entrance Road to a standard T intersection. The project also includes installation of new gates, bollards, and signs.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
6982AF20B000030- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 26, 2020
UT FTFW OURA 11(1), Auto Tour Route
- 5×SolicitationCurrentJul 13, 2020
UT FTFW OURA 11(1), Auto Tour Route
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Schedule A: $1,823,195.00 Schedule A Incentives: $10,054.00 Schedule B: $3,028,830.00 | 78% | Awarded | Open |
PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition. | 74% | Solicitation | 12/01/2026 |
PROJECT: UT NP DINO PMS(1), Pavement Preservation DINO LOCATION: The project is in Dinosaur National Monument. The approximate latitude and longitude coordinates for the project are: 40°26'17.49"N, 109°18'25.87"W WORK: This project consists of pavement preservation. See “Project Description” posted under Attachments for additional details. LENGTH: Base Schedule- 46.99 miles and parking areas; Option X- 12.89 miles and parking areas TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Firm-Fix-Price Task Order Contract ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000 INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Western Region Pavement Preservation MATOC. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region-pavement-pres This project is anticipated to be solicited Fall/Winter 2026 This project includes a Base Schedule and one Option Schedule (X). PRELIMINARY PLANS and are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | 72% | Pre-Solicitation | Open |
PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. | 68% | Solicitation | 12/02/2026 |
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 | 68% | Solicitation | 11/17/2026 |