GovChime
Notice ID: bfb7e3ce735448368962a8a8ee9cb28bSolicitation

CO FTBR Crystal Dam (1), East Portal Access Road

Archived on May 3, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
April 26, 2021
Notice type
Solicitation
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Montrose, 81401
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF21B000004
Notice ID
bfb7e3ce735448368962a8a8ee9cb28b

Description

THIS IS AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. PROJECT DETAILS: CO FTBR Crystal Dam(1) East Portal Access Road The East Portal Access Road is located in Montrose County, Colorado. The road begins at the intersection with State Highway 347 at the entrance station to the Black Canyon National Park about 6 miles north of US-50. The road continues for 6.85 miles to the northeast where it terminates at the gate to the Crystal Dam facilities road. The Bureau of Reclamation (BOR) maintains the road for access to its Crystal Dam and Power Plant and to the recreational facilities along the Gunnison River. The 21-foot wide road was originally constructed in 1973 and has had no major maintenance projects other than a chipseal done in 2015. The roadway pavement is generally in fair to poor condition. The road has been segmented into three sections based on priority and condition. The upper section from mileposts 0.0 to 2.2, the middle section from mileposts 2.2 to 5.3 and the lower section from mileposts 5.3 to 6.8. The middle section is characterized by steep grades of up to 16%, tall rock cuts (with rockfall problems), poor geometrics, and poor pavement conditions. The focus of the project will be the first 5.3 miles. The scope of the project would be to pulverize and overlay the pavement 5 miles and reconstruct 0.3 miles. The major items of work will include paving, rock excavation (blasting) and rock removal (scaling), rockfall protection, cleaning the ditches and culverts, and full depth reclamation and paving. SIGNIFICANT QUANTITIES: Schedule A: 20401-0000 Roadway Excavation: 14,500 CUYD 26001-0000 Rock Bolt: 200 LNFT 26002-000 Rock Dowel: 100 LNFT 30202-2000 Roadway Aggregate, Method 2: 3,500 TON 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth: 4.890 Mile 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 30,000 TON: 11,500 TON 623032-0100 Special Labor, Slope Scaling: 150 Hours 63401-0300 Pavement Markings, Type B, Solid (White): 110,000 LNFT 63401-0300 Pavement Markings, Type B, Solid (Double Yellow): 110,000 LNFT 65101-1000 Draped Rockfall Protection, Wire Mesh: 2,250 SQYD 65101-2000 Draped Rockfall Protection, Cable Net: 5,000 SQYD Anticipated Schedule The anticipated advertisement date is April 2021. Construction is anticipated from May 2021 to September 2021. Funding The estimated cost range is between $4.5 million and $5.5 million. This will be a full and open competition.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:6982AF21B000004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationFeb 12, 2021

    CO FTBR Crystal Dam (1), East Portal Access Road

    Notice 25e8f27e8d694b5d8415e8ab8ef099a0 on SAM.gov

  2. 11×
    SolicitationCurrentMar 5, 2021

    CO FTBR Crystal Dam (1), East Portal Access Road

    Notice bfb7e3ce735448368962a8a8ee9cb28b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF21B000004

Archive Date

May 3, 2021

Office Address