Notice ID: f903920bf4a64fa2947eb7398d3f4d7cSolicitation
CA BLM 2020(1), San Vicente Bridge
Archived on April 17, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- April 14, 2021
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Davenport, 95017
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 6982AF21B000005
- Notice ID
- f903920bf4a64fa2947eb7398d3f4d7c
Description
This project includes the replacement of a single lane, 29-foot long single span steel girder bridge (Bridge #1) with a 49-foot long single span prefabricated steel girder bridge with steel decking and aggregate fill supported on spread footing foundations. The project also includes removal of a second out of service bridge (Bridge #2) which is approximately one-mile north of Bridge #1 on San Vicente Road. Bridge #2 consists of a 40-foot long single span structure with a timber deck on a steel railcar superstructure with two steel girders. The condition of the Bridge #2 has deteriorated to such an extent that the structure has been closed. Both bridges span San Vicente Creek. Access to the project sites is along San Vicente Road, a single lane, gravel road. All of the work is occurring in natural resource sensitive areas. Timely completion of construction will be crucial to minimize disruptions to BLM employees and partner agencies throughout construction and to achieve customer satisfaction. San Vicente Road is closed to public use (behind a locked gate) and will remain closed during construction.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Eric Grosskreuz
Secondary Contact
Sheri Walsh
Documents
No documents available.
Lifecycle
Solicitation:
6982AF21B000005- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationFeb 10, 2021
CA BLM 2020(1), San Vicente Bridge
- 11×SolicitationCurrentMar 3, 2021
CA BLM 2020(1), San Vicente Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
78% | Solicitation | 12/01/2026 | |
PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition. | 78% | Solicitation | 11/19/2026 |
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: NM FLAP SR35(1) PROJECT NAME: GRANT COUNTY BRIDGES SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference PROJECT DESCRIPTION: The Grant County Bridges Project is located near Mimbres, New Mexico, in Grant County, along State Route (SR) 35. SR 35 serves as a 27‑mile highway providing access to the Gila National Forest, connecting SR 15 in Silver City to SR 152 in Mimbres. The proposed improvements include work at four locations along SR 35: Bridge 1330 — Milepost (MP) 0.5 Concrete box culvert — MP 4.65 Bridge 1873 — MP 5.2 Bridge 1876 — MP 8.42 SCOPE OF THE WORK: The project includes reconstruction of three bridges and a concrete box culvert. Improvements would provide reliable and safe access to the Gila National Forest for local and regional travelers. Improvements to these structures would also benefit travelers by accessing residential and commercial properties along SR 35. Schedule A includes: The project includes demolition of the existing bridge and construction of three (3) new simple-span, precast, prestressed concrete bridges: an 80‑ft simple span with precast prestressed I‑girders and a cast‑in‑place reinforced concrete deck; a skewed 55‑ft‑6‑in simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay; and a 36‑ft simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Bridge 1, a 80‑ft simple span: precast, prestressed I‑girders with a cast‑in‑place reinforced concrete deck. Bridge 2, a 55‑ft‑6‑in skewed simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Bridge 3, 36‑ft simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay. Option X includes: The work consists of removing an existing open-bottom concrete box culvert and replacing it with a 10‑ft by 5‑ft reinforced concrete box culvert. PRINCIPAL WORK ITEMS: Schedule A Removal of Bridge 484 Cuyd of Structural Concrete 707 LNFT of Precast, prestressed concrete slabs 48 inch voided (15” and 18”) 80,900 LB of reinforced steel epoxy coated 511 LNFT Bridge railing steel 800 LNFT drilled shaft 30 inches. 40 weeks of Temporary Traffic control flagger and Traffic Control Supervisor Option X 2 Each Concrete headwall (including wing walls) 60 LNFT, 10 ft span, 5 ft rise precast reinforced box culvert 5 weeks of Traffic Control Supervisor ESTIMATED COST RANGE: The estimated price range is between $10,000,000 and $20,000,000. ITEMS WORTH NOTING: Construction in Mimbres can be maintained through all seasons, but you must factor in cold-weather provisions for the winter months to ensure the integrity and quality of critical bridge and culvert materials like concrete and sealants. | 76% | Pre-Solicitation | 12/01/2026 |
Update 07/24/2026: QandA_07-24-2026 and updated project discription posted to attachments. Update 07/06/2026: QandA_07-06-2026.pdf posted to attachments. NOTICE OF SUBCONTRACTING OPPORTUNITY This Work consists of constructing a two-lane, temporary traffic bridge and detour, bridge removal, installation of riprap scour protection, bridge construction, stone masonry, geotechnical ground improvements, parking area improvements, approach road reconstruction This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton Project Location: Approximately 7 Miles E of West Yellowstone, MT. Project Length: 0.36 Miles Estimated Price Range: $20,000,000.00 to $30,000,000.00 Tentative Solicitation Date: Fall 2027 - Winter 2028 Tentative Fixed Completion Date: Fall 2030 INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. Contractor Information on the IDIQ contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | 75% | Pre-Solicitation | Open |
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options. SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction. PRINCIPAL WORK ITEMS: 15701-0000 Soil Erosion Control: LPSM 30202-2000 Roadway Aggregate, Method 2: 310 TONS 40301-0100 Asphalt Concrete Pavement, Type 1: 350 TONS 55901-0000 Membrane Waterproofing: 445 SQYD 56205-0000 Debris Shield: LPSM 57201-0000 Repair Concrete (Deep): 38 SQYD 57201-0000 Repair Concrete (Deep Bridge Deck): 80 SQYD 57201-0000 Repair Concrete (Full Depth Bridge Deck): 80 SQYD 60901-1000 Curb, Concrete, 12-Inch Depth: 520 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A, Steel Posts: 263 LNFT ANTICIPATED SCHEDULE: Advertisement: January 2027 Award: March 2027 Notice to proceed: April 2027 Contract completion: October 2027 Total duration for construction: 120 days ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000. | 75% | Market Research | 11/04/2026 |
Additional Details
Solicitation Number
6982AF21B000005
Archive Date
Apr 17, 2021
Office Address
LAKEWOOD, CO, 80228