Notice ID: e1fdb852ece2487ba954e1101c3b1ea6Solicitation
NM FLAP SJU 10(1) Cottonwood Campground Bridge
Archived on December 20, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- November 22, 2021
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Navajo Dam, 87419
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 6982AF21B000023
- Notice ID
- e1fdb852ece2487ba954e1101c3b1ea6
Description
PROJECT DETAILS: NM FLAP SJU 10(1) Cottonwood Campground Bridge THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT DESCRIPTION: The project is to provide an accessible and maintainable roadway to the campground, a bridge will be constructed to span the width of the arroyo to the north of the existing roadway at the arroyo crossing, and will be elevated high enough to allow for the park service to continue to use maintenance equipment to keep the arroyo clear of excessive sediment accumulation. The new bridge will be constructed offline such that access to the campground will be maintained without interruption to traffic flow. The alignment of the roadway will be reconstructed upon completion of the bridge with profile adjustments as necessary to meet the deck elevation of the new bridge. SIGNIFICANT QUANTITIES: 3,950 cubic yard of embankment construction 2,120 cubic yard of placed riprap, class 3 1,220 cubic yard of placed riprap, class 4 194 cubic yard of structural concrete class A 430 liner feet precast prestressed concrete girder 186 liner feet of drilled shaft 36-inch diameter MISCELLANEOUS: The proposed work for this project includes installation of a new bridge which will free span the arroyo crossing. The new bridge is proposed to include two 12 foot lanes by 105 feet long with 4-foot-wide shoulders and metal railings for a total out to out width of 35 feet. All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. COST RANGE: The proposed project is estimated at a cost between $1,500,000 and $3,500,000. CONSTRUCTION DURATION: Construction is anticipated from FALL 2021 to April 2022. ADDITIONAL INFORMATION: Anticipated Award: Late November 2021
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jackie Schmuhl
Secondary Contact
Sheri Walsh
Documents
No documents available.
Lifecycle
Solicitation:
6982AF21B000023- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 14, 2021
NM FLAP SJU 10(1) Cottonwood Campground Bridge
- 5×SolicitationCurrentOct 7, 2021
NM FLAP SJU 10(1) Cottonwood Campground Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF21B000023
Archive Date
Dec 20, 2021
Office Address
LAKEWOOD, CO, 80228