GovChime
Notice ID: a04e1d0ea3bc470280862f06b59406b0Solicitation

AZ FLAP SR88(1) Apache Trail

Archived on February 15, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
June 14, 2022
Notice type
Solicitation
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Roosevelt, 85545
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF21B000027
Notice ID
a04e1d0ea3bc470280862f06b59406b0

Description

Project Location The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam (MP 240) and Apache Lake Marina (MP 229) in Maricopa County, Arizona. State Route 88 is currently closed south of the project due to flood damage. Access for construction will be from the north. The figure below provides a visual summary of the project location. Scope of the Work The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved. The project does not propose widening. Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation. Items worth noting: This is a very narrow and winding section of road with steep grades and no shoulder in several locations. Coordination with public traffic will be required. Daytime delays will be a maximum of 15 minutes. Several drainage structures are currently completely plugged and the bench in portions of the project has been narrowed due to flood events in the Fall of 2019. State Route 88 south of the Apache Lake Marina is currently closed. ADOT has not indicated a timeline for reopening this segment and it therefore the project should not be assumed to be accessible from the south. One slope cut will likely require blasting techniques to excavate hard rock. The road has historic characteristics that will require archeological monitors for certain work items. Additionally, environmental resources exist adjacent to the road in several locations. Principal Work Items Approximate quantities for major work items: 16,000 cubic yards of roadway excavation 5,150 cubic yards of rip rap 111,000 square yards of chip seal 38,000 tons of roadway aggregate 6,200 tons of asphalt concrete pavement 3,000 square yards of concrete pavement (low water crossings with cutoff walls) 1,700 linear feet of pipe culvert 465 linear feet of reinforced concrete box culvert Anticipated Schedule Advertise: Late October Bid Opening: Early December Award: Late December Construction: Winter 2022 – Fall 2022 Funding The anticipated cost range is between $12,000,000 and $16,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Eric Grosskreuz

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:6982AF21B000027
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationSep 15, 2021

    AZ FLAP SR88(1) Apache Trail

    Notice 7f33583100234e9e907be7462e71518a on SAM.gov

  2. 7×
    SolicitationCurrentOct 25, 2021

    AZ FLAP SR88(1) Apache Trail

    Notice a04e1d0ea3bc470280862f06b59406b0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF21B000027

Archive Date

Feb 15, 2022

Office Address

LAKEWOOD, CO, 80228