GovChime
Notice ID: ccf64858d7b248a99b2738bb4a5d5b45Solicitation

CA ERFO SIERRA NF 05S07(1) NORRIS CREEK BRIDGE

Archived on November 23, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
January 23, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Oakhurst, 93644
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF22B000037
Notice ID
ccf64858d7b248a99b2738bb4a5d5b45

Description

CA ERFO SIERRA NF 05S07(1) - NORRIS CREEK BRIDGE PROJECT DESCRIPTION AND LOCATION: The Sierra National Forest (SNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The project site is located approximately 37.2 miles northeast of Oakhurst, CA on Forest Service Route 05S007 (Beasore Road) within Sierra National Forest in Madera County, CA. The original bridge was a one lane, two-way traffic single span structure at a 15-degree skew. It had an overall bridge length of 37 feet, roadway width (curb to curb) of 14.1 ft, and deck width (outside to outside) of 15.4 ft. SCOPE OF THE WORK: The purpose of the project is to replace the Norris Creek Bridge over Norris Creek within Sierra National Forest in Madera County, California. The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. A two-lane, 70-ft x 24-ft proposed structure is anticipated. The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to match the existing roadway section. Bridge rail and guardrail with terminals will be included. Items worth noting: The work will be listed within a single Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 05S007 will remain closed during construction and can be used for contractor staging and storage. Access is to both sides of the bridge is possible by an approximate 7.5-mile detour. Deep foundations (micro-piles or drilled shafts) are anticipated PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 8500 CUYD of Excavation/Embankment Construction 250 CUYD of Riprap 300 TON of Roadway Aggregate 70-ft x 256-ft of Prefabricated Steel Bridge 200 TON of Asphalt Pavement 150 LNFT of Guardrail, including terminals 80 hours of Equipment Hours 40 hours of Labor Hours ESITMATED MAGNITUDE: Between $700,000 and $2,000,000

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:6982AF22B000037
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationSep 15, 2022

    CA ERFO SIERRA NF 05S07(1) NORRIS CREEK BRIDGE

    Notice 5d32a21900b74aa3bc862edcf28f1698 on SAM.gov

  2. 9×
    SolicitationCurrentOct 3, 2022

    CA ERFO SIERRA NF 05S07(1) NORRIS CREEK BRIDGE

    Notice ccf64858d7b248a99b2738bb4a5d5b45 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF22B000037

Archive Date

Nov 23, 2022

Office Address

LAKEWOOD, CO, 80228