GovChime
Notice ID: 1149cc3943f9491a8cc184d2f7400a5bSolicitation

CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road

Archived on May 31, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
May 24, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
King City, CA, 93930
Last updated
Dec 4, 2025

Identifiers

Solicitation number
6982AF23B000014
Notice ID
1149cc3943f9491a8cc184d2f7400a5b

Description

THIS IS A REQUEST FOR BIDS. PLANS AND SPECIFICATION ARE AVAILABLE AT THIS TIME. The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA. The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements. SCOPE OF THE WORK: The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design. Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated. Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites. Items worth noting: *The terrain is mountainous with steep slopes. *The roadway widths vary from 16-ft to 24-ft. *The road is currently closed to the public. However, residents along the route do have access. *The roadway serves as the primary route between King City and the Pacific Coast. *Access for the residents will be maintained during construction. *Shoring is anticipated for MSE wall excavations and to allow access. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 2,500 CUYD of Excavation/Embankment Construction 2,200 SQFT of Mechanically Stabilized Earth wall 220 CUYD of Riprap 700 TON of Roadway Aggregate 650 TON of Asphalt Pavement 3 EACH of Concrete Headwall 150 LNFT of 24-inch Culvert 80 LNFT of 36-inch Culvert 150 LNFT of 78-inch Culvert 110 LNFT of 72-inch Culvert 9 EACH End Section for Culverts 120 hours of Equipment Hours 1 (LPSM) Traffic Control ANTICIPATED SCHEDULE: Award: May 2023 Construction: May 2023 December 2023 ESTIMATED COST RANGE: The anticipated cost range is between $10,000,000 and $20,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:6982AF23B000014
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 7, 2023

    CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road

    Notice 7472710dd76f487393889c4512e3ddc6 on SAM.gov

  2. 9×
    SolicitationCurrentMar 27, 2023

    CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road

    Notice 1149cc3943f9491a8cc184d2f7400a5b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF23B000014

Archive Date

May 31, 2023

Office Address

LAKEWOOD, CO, 80228