Notice ID: b81e377d44d0423980eec96ab415a63bSolicitation
TX FLAP FM 709(1) � Access to Navarro Mills Lake
Archived on November 30, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- November 18, 2024
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Dawson
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 6982AF23B000037
- Notice ID
- b81e377d44d0423980eec96ab415a63b
Description
PROJECT NUMBER: TX FLAP FM 709(1) PROJECT NAME: Navarro Mills Lake Road PROJECT DESCRIPTION: The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction. The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety. PRINCIPAL WORK ITEMS: 7,820 Embankment Construction 29,000 tons of Aggregate base 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement) 7000 Tons of Asphalt Concrete Pavement 4000 hours of temporary traffic control, flagger 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel. 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert 390 linear feet, 30-inch pipe culvert (concrete) 660 linear feet, 24-inch pipe culvert (concrete) 210 linear feet, 54-inch pipe culvert (concrete) ANTICIPATED SCHEDULE: Advertise: September 2024 Award: Fall 2024 Construction: November 2024 August 2025 ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Stephanie Navarro
Secondary Contact
Jorey Deml
Documents
Select documents to download
Showing 10 of 14 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Nov 18, 2024 | - |
Showing 1 to 10 of 14 results
Lifecycle
Solicitation:
6982AF23B000037- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 4, 2024
TX FLAP FM 709(1) – Access to Navarro Mills Lake
- 8×SolicitationCurrentSep 26, 2024
TX FLAP FM 709(1) � Access to Navarro Mills Lake
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF23B000037
Archive Date