GovChime
Notice ID: b81e377d44d0423980eec96ab415a63bSolicitation

TX FLAP FM 709(1) � Access to Navarro Mills Lake

Archived on November 30, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
November 18, 2024
Notice type
Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Dawson
Last updated
Jan 23, 2026

Identifiers

Solicitation number
6982AF23B000037
Notice ID
b81e377d44d0423980eec96ab415a63b

Description

PROJECT NUMBER: TX FLAP FM 709(1) PROJECT NAME: Navarro Mills Lake Road PROJECT DESCRIPTION: The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction. The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety. PRINCIPAL WORK ITEMS: 7,820 Embankment Construction 29,000 tons of Aggregate base 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement) 7000 Tons of Asphalt Concrete Pavement 4000 hours of temporary traffic control, flagger 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel. 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert 390 linear feet, 30-inch pipe culvert (concrete) 660 linear feet, 24-inch pipe culvert (concrete) 210 linear feet, 54-inch pipe culvert (concrete) ANTICIPATED SCHEDULE: Advertise: September 2024 Award: Fall 2024 Construction: November 2024 August 2025 ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Stephanie Navarro

Secondary Contact

Documents

Select documents to download

Showing 10 of 14 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 18, 2024-

Showing 1 to 10 of 14 results

Lifecycle

Solicitation:6982AF23B000037
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationSep 4, 2024

    TX FLAP FM 709(1) – Access to Navarro Mills Lake

    Notice d89070957e8e4d7dab94a9ed50ad0b24 on SAM.gov

  2. 8×
    SolicitationCurrentSep 26, 2024

    TX FLAP FM 709(1) � Access to Navarro Mills Lake

    Notice b81e377d44d0423980eec96ab415a63b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF23B000037

Archive Date

Nov 30, 2024