GovChime
Notice ID: 3160821d655545bab739aa81b6c9f202Solicitation

AZ FLAP NAV FR136(1) Joe Tank Road

Archived on April 12, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
May 15, 2024
Notice type
Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Springerville, AZ, 85938
Last updated
Dec 4, 2025

Identifiers

Solicitation number
6982AF24B000004
Notice ID
3160821d655545bab739aa81b6c9f202

Description

PROJECT NUMBER: AZ FLAP NAV FR136(1) PROJECT NAME: Joe Tank Road 151604NAV1361 PROJECT DESCRIPTION: Joe Tank Road (FR136) provides access to the Los Caballos Trailhead and to Apache-Sitgreaves National Forest. The Project is northwest of Show Low, Arizona in Navajo County. The Project is accessed from North Clark Road (AZ-260) about two miles northwest of West Deuce of Clubs Avenue in Show Low. The project extends 0.6 miles west along Joe Tank Road past the Los Caballos Trailhead #638 in the Apache-Sitgreaves National Forest. There is a base Schedule (0.32 miles) and an Option (0.28 miles). SCOPE OF THE WORK: The project scope includes providing a wider roadway bench and paved shoulders for approximately 0.6 miles from State Route (SR) 260 to Apache-Sitgreaves National Forest (ASNF) land. The improvements will consist of the removal of the existing asphalt surface and base material and the construction of a new roadway structural section, including new aggregate base and a new asphalt surface. The Project will provide a new paved surface, ditch construction or reconditioning to improve drainage, extending, or replacing culverts, the replacement of a cattle guard, minor City of Show Low utility valve box and manhole adjustments and the installation of new street signage. The existing roadway bench width of approximately 20 feet is proposed to be widened to 24 feet, allowing for curb and curb and gutter on both sides of Joe Tank Road. Access to all approach roads within the project limits must be maintained during construction. PRINCIPAL WORK ITEMS (Totals reflect base Schedule plus Option): 4,500 cubic yards of roadway excavation 5,000 tons of roadway aggregate 1,900 tons of asphalt concrete pavement 6,600 linear feet of curb and curb and gutter 1,150 linear feet of pipe culvert, 3 manholes and 3 inlets 125 cubic yards of rip rap ANTICIPATED SCHEDULE: Advertisement Late February 2024; Award Late March 2024; Construction May 2024 through August 2024. The estimated bid range is between $2,000,000 and $5,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:6982AF24B000004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationFeb 5, 2024

    AZ FLAP NAV FR136(1) Joe Tank Road

    Notice 5c8d6c2f22f44c0d96b7f33314355d7e on SAM.gov

  2. 10×
    SolicitationCurrentFeb 23, 2024

    AZ FLAP NAV FR136(1) Joe Tank Road

    Notice 3160821d655545bab739aa81b6c9f202 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF24B000004

Archive Date

Apr 12, 2024

Office Address

LAKEWOOD, CO, 80228