GovChime
Notice ID: 9e79397de09d44288e5bc446b2ea7209Solicitation

CA ERFO NP DEVA 2023-3(2) Repairs and Armoring

Archived on August 28, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−06:00
Posted
August 26, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Death Valley
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF24B000010
Notice ID
9e79397de09d44288e5bc446b2ea7209

Description

PROJECT NUMBER: CA ERFO NP DEVA 2023 – 3(2) PROJECT NAME: REPAIRS AND ARMORING PROJECT DESCRIPTION: The project is located in Death Valley National Park in Inyo County. Death Valley National Park sustained significant roadway damage park wide due to historic rainfall from Hurricane Hillary. The base schedule consists of pavement patching and armoring on multiple routes, removing and replacing asphalt on harmony borax trail, and roadway reconditioning and placing new culverts on West Side Road. Option X consists of pavement patching and armoring on Emigrant Canyon Road from MP 0.0 to MP 8.0. SCOPE OF THE WORK: This project consists of pavement patching, roadway reconditioning, armoring, sign installation and replacement, and installing new gates on multiple routes throughout the park. Armoring consists of paved shoulders, gabion walls, revet mattresses and a combination of revet mattresses with concrete barrier. The desert tortoise is present along some routes at elevations higher than 2,000 feet. Biological and Archeological monitors will be required for the duration of the project. The contractor will be allowed to set up stand tanks at three locations within the park to collect water. There are limitations to the quantity of water that can be pulled from each source per day. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): Schedule A Removal of Pavement, Asphalt – 2,200 SQYD Revet Mattress, Galvanized or Aluminized Coated – 2,500 SQYD Roadway Reconditioning – 3 Mile Asphalt Concrete Pavement Patch, Type 1 – 7,700 SQYD 24-Inch Pipe Culvert – 100 LNFT Sidewalk, Asphalt – 2,100 LNFT Concrete Barrier – 2,800 LNFT Option X Gabions, Galvanized or Aluminized Coated – 3,500 CUYD Revet Mattress, Galvanized or Aluminized Coated – 650 SQYD Contractor Furnished Gabion Wall Design - LPSM Asphalt Concrete Pavement Patch, Type 1 – 4,500 SQYD Concrete Barrier – 550 LNFT ANTICIPATED SCHEDULE: Advertise: July 2024; Award: August 2024; Construction: August 2024 through February 2025. The estimated bid range is between $10,000,000 and $20,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Laura Vallejos

Secondary Contact

Leslie Karsten

Documents

No documents available.

Lifecycle

Solicitation:6982AF24B000010
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 14, 2024

    CA ERFO NP DEVA 2023-3(2) Repairs and Armoring

    Notice 819d2b2b07814036a1dff36b1354a3c9 on SAM.gov

  2. 16×
    SolicitationCurrentJul 1, 2024

    CA ERFO NP DEVA 2023-3(2) Repairs and Armoring

    Notice 9e79397de09d44288e5bc446b2ea7209 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF24B000010

Archive Date

Aug 28, 2024

Office Address

LAKEWOOD, CO, 80228