Notice ID: a8b93ed2262143e382b08d0373623767Solicitation
NM FS 141(1) South Fork Negrito Creek Bridge
Archived on September 8, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- August 15, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Reserve
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 6982AF24B000014
- Notice ID
- a8b93ed2262143e382b08d0373623767
Description
THIS IS A REQUEST FOR BID, PLANS AND SPECIFICATIONS ARE AVAILABLE UNDER THE ATTACHMENTS TAB. PROJECT NUMBER: NM FS 141(1) PROJECT NAME: South Fork Negrito Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 7500 ft. The South Fork Negrito Bridge was constructed in 1959 and is past its design life of 50 years. The deck has areas of delamination, the curbs are 100% delaminated and spalled and the stringers have flexure cracks. The most recent inspection report indicates the structural evaluation of the bridge to be in poor condition. Proposal would replace this bridge with a similar structure, add bridge rail, transition and guardrail, and pave approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 141 (MP 24.36) over the South Fork Negrito Creek in Catron County, New Mexico. The existing single-span bridge’s overall length is 40.8-ft and width (out-out) measures 26.4-ft. The existing roadway width is 24.0-ft.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Leslie Karsten
Secondary Contact
Laura Vallejos
Documents
No documents available.
Lifecycle
Solicitation:
6982AF24B000014- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 12, 2024
NM FS 141(1) South Fork Negrito Creek Bridge
- 7×SolicitationCurrentJul 8, 2024
NM FS 141(1) South Fork Negrito Creek Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF24B000014
Archive Date
Sep 8, 2024
Office Address
LAKEWOOD, CO, 80228