GovChime
Notice ID: a8b93ed2262143e382b08d0373623767Solicitation

NM FS 141(1) South Fork Negrito Creek Bridge

Archived on September 8, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
August 15, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Reserve
Last updated
Sep 25, 2026

Identifiers

Solicitation number
6982AF24B000014
Notice ID
a8b93ed2262143e382b08d0373623767

Description

THIS IS A REQUEST FOR BID, PLANS AND SPECIFICATIONS ARE AVAILABLE UNDER THE ATTACHMENTS TAB. PROJECT NUMBER: NM FS 141(1) PROJECT NAME: South Fork Negrito Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 7500 ft. The South Fork Negrito Bridge was constructed in 1959 and is past its design life of 50 years. The deck has areas of delamination, the curbs are 100% delaminated and spalled and the stringers have flexure cracks. The most recent inspection report indicates the structural evaluation of the bridge to be in poor condition. Proposal would replace this bridge with a similar structure, add bridge rail, transition and guardrail, and pave approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 141 (MP 24.36) over the South Fork Negrito Creek in Catron County, New Mexico. The existing single-span bridge’s overall length is 40.8-ft and width (out-out) measures 26.4-ft. The existing roadway width is 24.0-ft.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Leslie Karsten

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:6982AF24B000014
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 12, 2024

    NM FS 141(1) South Fork Negrito Creek Bridge

    Notice a9d36a36534a4f00b7e7911f55a763a6 on SAM.gov

  2. 7×
    SolicitationCurrentJul 8, 2024

    NM FS 141(1) South Fork Negrito Creek Bridge

    Notice a8b93ed2262143e382b08d0373623767 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF24B000014

Archive Date

Sep 8, 2024

Office Address

LAKEWOOD, CO, 80228