Notice ID: 22adc81c1d2f4ce28918de2cdca307e2Solicitation
CO OMAD 300(69) Minuteman Missile Access Road
Archived on November 20, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- October 24, 2024
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- FE Warren AFB, 82005
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 6982AF24B000018
- Notice ID
- 22adc81c1d2f4ce28918de2cdca307e2
Description
PROJECT DESCRIPTION: In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 116.910 miles of existing gravel on Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force. The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. SCOPE OF WORK: With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage awarded. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 116.910 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads. THE BREAKDOWN OF THE ROADS IS: Up to 8.66 miles of reconditioning and regraveling of aggregate surface roads within three segments in Laramie County, Wyoming. Up to 11.90 miles of reconditioning and regraveling of aggregate surface roads within two segments in Weld County, Colorado. Up to 40.83 miles of reconditioning and regraveling of aggregate surface roads within twelve segments in Logan County, Colorado. Up to 14.54 miles of reconditioning and regraveling of aggregate surface roads within five segments in Banner County, Nebraska. Up to 3.1 miles of reconditioning and regraveling of aggregate surface roads within one segment in Cheyenne County, Nebraska. Up to 37.86 miles of reconditioning and regraveling of aggregate surface roads within eleven segments in Kimball County, Nebraska. PRINCIPAL WORK ITEMS: Full utilization of the funding amount to provide Aggregate Surface Reconditioning and Re-Graveling Aggregate Surface Course for up to 116.910 miles of existing aggregate surface roads. Costs for items which are incidental to Section 301: Watering for dust control, sub excavation, rental equipment, general labor. Temporary Traffic Control ANTICIPATED SCHEDULE: Advertise: September 2024 Award: Fall 2024 Construction: June 2025 through September 2025 DISCLOSURE OF MAGNITUDE: $8,650,000.00
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Stephanie Navarro
Secondary Contact
Jorey Deml
Documents
Select documents to download
Showing 7 of 7 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Oct 24, 2024 | - |
Lifecycle
Solicitation:
6982AF24B000018- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationAug 23, 2024
CO OMAD 300(69) Minuteman Missile Access Road
- 4×SolicitationCurrentSep 12, 2024
CO OMAD 300(69) Minuteman Missile Access Road
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF24B000018
Archive Date
Nov 20, 2024