GovChime
Notice ID: adc4eef8b6324871a7edc645cf58aaeeSolicitation

WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge

Archived on November 1, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
October 15, 2024
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Buffalo
Last updated
Jan 23, 2026

Identifiers

Solicitation number
6982AF24B000023
Notice ID
adc4eef8b6324871a7edc645cf58aaee

Description

Project Details: WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the U.S. Forest Service (USFS) and Johnson County, Wyoming, is proposing to replace the existing bridge structure on Crazy Woman Canyon Road/Route 33. The project road is classified as a rural recreational local road and is in mountainous terrain. The project scope includes the replacement of North Fork Crazy Woman Creek Bridge on Crazy Woman Canyon Road/Route 33, reconstruction of the roadway approaches on both ends of the bridge, object markers installed on the four corners of the bridge, and pullout improvements. The project consists of replacing an existing bridge structure on Route 33/Crazy Woman Canyon Road. The roadway portion will consist of aggregate surface course approaches required for raising the existing profile as well as reconditioning of a pull-off area near the bridge. The existing bridge removal will include existing superstructure and partial demolition of concrete caps (enough to allow new girder clearance). The proposed structure is a 14 feet wide and 51 feet long (out-out abutment) single span structure, leaving existing concrete/grouted riprap embankments in place and building new concrete caps directly behind existing caps after squaring off existing skew. The prefabricated bridge consists of rolled girders and structural steel decking with gravel deck surface similar to the approaches. New abutments are cast-in-place concrete caps and wingwalls supported by micropile foundations, no additional scour protection is assumed to be required with existing rock grouted embankments. A temporary bridge or diversion is not required; however, the existing bridge to be replaced is load rated: 2-3 Axles: 11T 4-5 Axles: 12T 6+ Axles: 13T Semi-Truck: 20T Tandem: 21T Route 33/ Crazy Woman Canyon Road is geometrically tight west of the bridge location, it is not considered feasible to enter the project site from US-16.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 10 of 16 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONOct 15, 2024-

Showing 1 to 10 of 16 results

Lifecycle

Solicitation:6982AF24B000023
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationAug 12, 2024

    WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge

    Notice d8f03a991404443db6f5daa093bcf3b3 on SAM.gov

  2. 11×
    SolicitationCurrentAug 28, 2024

    WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge

    Notice adc4eef8b6324871a7edc645cf58aaee on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF24B000023

Archive Date

Nov 1, 2024