GovChime
Notice ID: bd14e0ba27c24b069a397e926aa4efdcSolicitation

NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge

Archived on January 26, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
January 6, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Las Vegas
Last updated
Jan 23, 2026

Identifiers

Solicitation number
6982AF25B000001
Notice ID
bd14e0ba27c24b069a397e926aa4efdc

Description

PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Leslie Karsten

Documents

Select documents to download

Showing 10 of 17 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 6, 2025-

Showing 1 to 10 of 17 results

Lifecycle

Solicitation:6982AF25B000001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationSep 25, 2024

    NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge

    Notice d9e98b24a44c401298e40957c19015b3 on SAM.gov

  2. 8×
    SolicitationCurrentOct 16, 2024

    NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge

    Notice bd14e0ba27c24b069a397e926aa4efdc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF25B000001

Archive Date

Jan 26, 2025