Notice ID: bd14e0ba27c24b069a397e926aa4efdcSolicitation
NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
Archived on January 26, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- January 6, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Las Vegas
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 6982AF25B000001
- Notice ID
- bd14e0ba27c24b069a397e926aa4efdc
Description
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jon Holsopple
Secondary Contact
Leslie Karsten
Documents
Select documents to download
Showing 10 of 17 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 6, 2025 | - |
Showing 1 to 10 of 17 results
Lifecycle
Solicitation:
6982AF25B000001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 25, 2024
NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
- 8×SolicitationCurrentOct 16, 2024
NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF25B000001
Archive Date
Jan 26, 2025