Notice ID: 1ae4085c34744fbe8dbe226eb111549cSources Sought
CA FLAP SCR T5(1) � Monterey Bay Sanctuary Scenic Trail Mitigation
Archived on May 15, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 AM UTC−07:00
- Posted
- January 27, 2025
- Notice type
- Sources Sought
- NAICS
- 113210: Forest Nurseries and Gathering of Forest Products
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Santa Cruz, CA
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 6982AF25SS00004
- Notice ID
- 1ae4085c34744fbe8dbe226eb111549c
Description
THIS IS NOT A REQUEST FOR PROPOSAL THE PERFORMANCE WORK STATEMENT (PWS) AND PLANS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone Small Businesses, Woman Owned Small Business concerns, 8(a) Small Businesses, or Service-Disabled Veteran-Owned Small Businesses and who intend to submit a proposal for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov Attn: Kelly Palmer for receipt by 4:00 p.m. Mountain Time on February 7, 2025. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), Small-Disadvantaged business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business, EDWOSB, or WOSB status) that apply to your business; (3) Provide a list of habitat restoration, mitigation, and/or native plant establishment projects of equal or greater value and scope described herein and in which you performed work in a National Forest, National Park, National Monument and/or in a natural resource sensitive areas. Experience in habitat restoration, mitigation, and/or native plant establishment is required. State whether you performed as the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ Details: CA FLAP SCR T5(1) Monterey Bay Sanctuary Scenic Trail Mitigation The requirement consists of seed collection, plant propagation, site preparation, planting, seeding, willow pole cuttings/plantings, watering (including potential irrigation system install), invasive species treatment/removal (herbicide application and mechanical), and other items of work necessary to establish new habitat. It includes approximately 33 acres of habitat establishment and approximately 23 acres of enhancement (primarily weed control). Local seed will be collected for propagation of specific plant species (habitat types include Palustrine Emergent Wetland, Arroyo Willow Riparian Forest, Arroyo Willow Scrub, Coastal Scrub, Sand Dune, and Coast Live Oak Forest). The total number of plants for all habitat types is estimated to be up to 53,000; of which approximately 6,350 are willow pole cuttings (2 species), 46,300 are tree band or smaller size containers (17 shrub, forb, or grass species), and 300 are tree pot size containers (4 tree species). When the plants have reached appropriate maturity, theyll be planted in already designated areas adjacent to the trail project area. Work includes preparation of the sites. Irrigation install and watering are some other work items expected with this effort to ensure survival of the plants and successful habitat establishment that meets the permitting agencies success criteria. Seed and mulch the disturbed slopes of the trail project (a sterile seed mix was applied to the slopes during construction of that project). PRINCIPAL WORK ITEMS: Seed collection Plant propagation Site Preparation Planting Seeding Irrigation (system install and watering) Weeding/Invasive Species Treatment ANTICIPATED SCHEDULE: Seed collection: Summer 2025 Spring 2026 Plant propagation: Summer 2025 Fall 2026 Install: Summer 2026
Award Overview
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
6982AF25SS00004- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 2×Market ResearchCurrentJan 23, 2025
CA FLAP SCR T5(1) � Monterey Bay Sanctuary Scenic Trail Mitigation
Similar Opportunities
- Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit
Department of Agriculture · Posted 10/23/2026
- Promenade Park Stewardship IRSC
Department of Agriculture · Posted 07/17/2026
- Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Department of Transportation · Posted 10/28/2026
- CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove
Department of Transportation · Posted 08/13/2026
- BAA 693JJ3-24-BAA-0004 - Advancing Cooperative Perception
Department of Transportation · Posted 09/24/2025
Additional Details
Solicitation Number
6982AF25SS00004
Archive Date
May 15, 2025
Office Address
LAKEWOOD, CO, 80228