Notice ID: 1e7016be89224f7fbb06bfb59e2a3e07Sources SoughtArchived
AZ FLAP PIM FR510(1) Sabino Canyon Park
Archived on June 14, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM MST
- Posted
- February 14, 2025
- Notice type
- Sources Sought
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Mount Lemmon, 85619
- Last updated
- Nov 17, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6982AF25SS0005
- Notice ID
- 1e7016be89224f7fbb06bfb59e2a3e07
Description
THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on February 28, 2025: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor (include Unique Entity ID (UEI)); (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firms capability to bond for a single project of $10 million, and your firms aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the AZ FLAP PIM FR510(1) Sabino Canyon Park project in which you have constructed new paved parking lots, kiosk, public restrooms, and pathways. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Sabino Canyon Park PROJECT DESCRIPTION: Sabino Canyon Park Road, also known as Forest Road 510, is located within Pima County, Arizona, north of Tucson, Arizona. The project begins on the north at the intersection with Carter Canyon Road and ends at the Forest Service gate. The project length is approximately 0.5 mile. SCOPE OF THE WORK: The purpose of the project is to improve public access, particularly parking, in the community of Summerhaven, which is at the top of Mt. Lemmon, north of Tucson. Note that CFL built the road from Tucson to Summerhaven over several years and phases in the 90 s and 2000 s. It is very popular during the summer months to escape the Tucson heat. There is also an area where people ski slightly to the north of the project. This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement May 2025 Award July 2025 NTP August 2025 Contract Completion April 2026 The estimated price range of the project work is between $5 million and $10 million.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Eric Grosskreuz
Secondary Contact
Kelly Palmer
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
AZ FLAP PIM FR510(1) Sabino Canyon Park
- 7Version 7PresolicitationArchived
Type changed from Sources Sought to Presolicitation
AZ FLAP PIM FR510(1) Sabino Canyon Park
- 5Version 5SolicitationArchived
Type changed from Presolicitation to Solicitation
AZ FLAP PIM FR510(1) Sabino Canyon Park
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6982AF25SS0005
Archive Date
Jun 14, 2025