SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT
Archived on May 1, 2026. Full description on SAM.gov.
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER: SD FLAP SDGFP PARKING(1)
PROJECT NAME: NORTH POINT PARKING LOT
PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area.
SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot’s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities.
PRINCIPAL WORK ITEMS:
- 20401-0000 Roadway Excavation: 5,700 CUYD
- 20402-0000 Subexcavation: 3,000 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 3,800 TON
- 40301-0000 Asphalt Concrete Pavement, 2,300 TON
ANTICIPATED SCHEDULE:
Advertisement – March 2026
Award – May 2026
NTP – June 2026
Contract Completion – September 2026
ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
This will be solicited using full and open competition procedures.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
6982AF26B000002- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentMar 31, 2026
SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
6982AF26B000002
Archive Date
May 1, 2026
Office Address
LAKEWOOD, CO, 80228