GovChime
Notice ID: 24e56ce9e49b4573a360bb0731d05b8aSolicitationArchived

SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

Archived on August 1, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM MDT
Posted
July 17, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
South Dakota, 57042
PSC
Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
6982AF26B000008
Notice ID
24e56ce9e49b4573a360bb0731d05b8a

Description

PROJECT NUMBER: SD FTFW MADI 10(2) & 9000(1)

PROJECT NAME: REHAB MADISON WMD HQ ROAD

PROJECT DESCRIPTION: 

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

SCOPE OF THE WORK: 

The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.

The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Douglas Whitcomb

Secondary Contact

Documents

Files (8)

  • Bid Opening Summary Sched A.pdf

    119 KBAdded in Solicitation version 7Posted
    Download
  • Amendment A002 - 6982AF26B000008.pdf

    496 KBAdded in Solicitation version 5Posted
    Download
  • Amendment A001 - 6982AF26B000008.pdf

    1.5 MBAdded in Solicitation version 3Posted
    Download
  • 6982AF25B000008 - SD FTFW MADI 10(2) and 9000(1).pdf

    2.9 MBAdded in Solicitation version 2Posted
    Download
  • SD FW MADI 10(2) and 9000(1) PLANS_SEALED.pdf

    59 MBAdded in Solicitation version 2Posted
    Download
  • SD FW MADI 10(2) and 9000(1) PVMT Report.pdf

    20 MBAdded in Solicitation version 2Posted
    Download
  • FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf

    5.7 MBAdded in Solicitation version 2Posted
    Download
  • Design Files.zip

    3.7 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice a442187093f144308f1dd4cf57ba5f2b on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 1e204264e99547fb84c479a65e830450 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 05ccea04d4934ada80f29d40e474b4ee on SAM.gov

  4. 5
    Version 5SolicitationArchived

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 7cd090efd5fd40a78190914d587e457f on SAM.gov

  5. 7
    Version 7SolicitationArchived

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 17fe9d04c13f4ec0adbb088b26c42a42 on SAM.gov

  6. 12
    Version 12SolicitationArchivedCurrent

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 24e56ce9e49b4573a360bb0731d05b8a on SAM.gov

  7. 11
    Version 11Award NoticeArchived

    Type changed from Solicitation to Award Notice

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice c021b5d539294d3488fad61be4da8e60 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationApr 29, 2026

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Notice 0d4ee4b34fc24dcfa5a6ed4cec740f12 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

6982AF26B000008

Archive Date

Aug 1, 2026

Office Address

LAKEWOOD, CO, 80228