6991PE25Q000007 SBRF Landing Platform Fabrication
Archived on October 4, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM PDT
- Posted
- September 12, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of TransportationMARITIME ADMINISTRATION
Notice details
- Office
- 6933A2 DOT MARITIME ADMINISTRATION
- Place of performance
- Benicia, 94510
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6991PE25Q000007
- Notice ID
- d6fba71c9daf48f69f6c2bc61781a024
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (10)
- Download
CS-S 6991PE25Q000007 Landing Platform Amend 1.pdf
333 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
6991PE25Q000007 Amendment 3 Bidder questions.pdf
85 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
6991PE25Q000007 Amendment 2 Bidder questions.pdf
132 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
4. Vendor Price Sheet REV1.xlsx
11 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
6991PE25Q000007 Amendment 1 Bidder questions.pdf
147 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
CS-S 6991PE25Q000007 Landing Platform Fabrication.pdf
333 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
1. FAR CD 2025 01 02.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
2. Fabricate Landing Platforms SOW.pdf
115 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
3. LANDING PLATFORM ASSEMBLY DESIGN.pdf
1004 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
5. E-Invoicing Instructions.pdf
135 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
6991PE25Q000007 SBRF Landing Platform Fabrication
- 2Version 2Combined Synopsis/SolicitationArchived
6991PE25Q000007 SBRF Landing Platform Fabrication
- 3Version 3Combined Synopsis/SolicitationArchived
6991PE25Q000007 SBRF Landing Platform Fabrication
- 4Version 4Combined Synopsis/SolicitationArchived
6991PE25Q000007 SBRF Landing Platform Fabrication
- 7Version 7Combined Synopsis/SolicitationArchivedCurrent
6991PE25Q000007 SBRF Landing Platform Fabrication
- 9Version 9Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
6991PE25Q000007 SBRF Landing Platform Fabrication
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The United States Coast Guard Deputy Commandant for Systems (DCS) is issuing this combined synopsis/solicitation on behalf of the Surface Forces Logistics Center (SFLC) to award a firm-fixed-price service contract, as detailed in the attached Statement of Work. This requirement consists of performing all on-site labor and services to perform open, inspect, report, and repair services on the anchor windlass and gearbox assembly in support of the USCGC KATMAI BAY (WTGB 101). All work must be performed on-site at 337 E Water St, Sault Sainte Marie, MI 49783 and the Contractor's off-site repair facility as required for machining and shop inspection. The planned Period of Performance (PoP) is from 16 November 2026 through 20 November 2026. This acquisition is a 100% total small business set-aside under NAICS code 811310, with a corresponding small business size standard of $12.5 million. The applicable Product Service Code is J020. The Government will award a contract resulting from this solicitation to the responsible offeror whose quote conforming to the solicitation is most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers: 1. Technical Capability (Pass/Fail) 2. Past Performance (Pass/Fail) 3. Total Price A quotation must receive an Acceptable rating for all non-price factors to be eligible for award. Among all acceptable quotations, award will be made to the responsible offeror submitting the lowest evaluated price. To establish Technical Capability (Pass/Fail), the quotation must demonstrate a clear understanding of the work statement requirements, conform strictly to all specifications in the attached Statement of Work, and provide any adequate capability and corporate experience documentation required by the solicitation. Failure to meet these criteria will render the quotation unacceptable. The Government will evaluate recent (completed within the last three years) and relevant past performance to assess the likelihood of successful performance. Past performance will be evaluated on an acceptable or unacceptable basis. To receive an acceptable rating, past performance must demonstrate a rating of satisfactory or higher performance of similar work. Offerors without recent or relevant past performance will be assessed as "Neutral" and considered acceptable for award. Past performance demonstrating marginal or below performance is unacceptable. Offerors shall identify all subcontractors anticipated to perform work under this contract. For each subcontractor, the offeror shall provide the subcontractor’s name, address, point of contact, phone number, the specific work items/specifications they will perform, and the percentage of work they will execute. Submit offers electronically via email to the points of contact identified in this notice. The Government does not prescribe a specific quotation format. Offerors must submit a quotation that clearly identifies the items offered and demonstrates compliance with the stated requirements. Submissions must be complete, clear, and presented in a format that allows effective evaluation by the Government. Submit all questions via email to the points of contact identified in this notice. The Government will not accept telephone inquiries. Submit offers on a firm-fixed-price basis. Prices must be all-inclusive and must cover all costs associated with providing the services, including but not limited to manufacturing, packaging, handling, transportation, duties, tariffs, fees, and any other costs. The Government may consider offers nonresponsive if they include conditional pricing, price escalation language, or statements indicating that prices are subject to adjustment based on future costs or fees. The Government intends to evaluate offers and make award without discussions; therefore, offerors should submit their best offer with initial submission. The Statement of Work and the list of applicable FAR provisions and clauses are attached to this notice. | - | Combined Synopsis | 11/12/2026 |
The Contractor shall furnish all necessary labor, materials, services, equipment, supplies, power, accessories, facilities, and all other items required—except as otherwise specified—to perform dockside repairs in accordance with this solicitation and all attached specifications. The scope of work includes ship repair and associated support work and may include work not currently listed as individual Work Items. Work Items 01 and 03 will require the presence onsite of an AUTHORIZED/LICENSED OEM service provider for Caterpillar Marine Diesel engine/Generators (see attached Justification and approval). | - | Combined Synopsis | 11/13/2026 |
SOW for RWTH 01-21-1 Renew USCGC STRATTON (WMSL-752) This solicitation is to renew Raised Watertight Hatch 01-21-1 ON STRATTON The Contractor shall provide all necessary labor, supervision, tools, equipment, materials, safety controls, and services to remove and replace RWTH 01-21-1 on STRATTON. The Government will furnish the replacement 60” x 60” hatch, including the associated coaming. The Contractor shall remove the existing hatch and associated components; prepare, repair, or modify the deck opening and surrounding structure as necessary; install and weld the replacement hatch and coaming; and adjust all latches, locks, sensors, supports, and related hardware to ensure proper fit, operation, and security. The Contractor shall protect adjacent shipboard equipment and spaces; comply with all applicable safety, hot-work, ammunition, welding, inspection, preservation, and environmental requirements; and coordinate work with Coast Guard personnel. The Contractor shall inspect and test the completed installation, including weld examination, alignment, watertightness, and operational testing, and restore affected insulation, sheathing, coatings, labels, nameplates, sensors, and security hardware. The completed hatch must be structurally sound, watertight, properly secured, and fully operational. Contractor is to perform work IAW WORK ITEM 1: RWTH 01-21-1, Renew Vendor to Perform work at ships homeport: CGC STRATTON UNITED STATES COAST GUARD BASE ALAMEDA 1 EAGLE ROAD ALAMEDA, CA 94501 All drawings are available upon request from the technical librarian. Vendor must submit drawing requests to provided POC. Security requirements: No special security requirements needed. POP: 30NOV26 - 11DEC26 POC: APM PE LT Adrian Rubio 657-944-8163 LT Summer Gould 206-827-5310 | - | Combined Synopsis | 10/29/2026 |
STATEMENT OF WORK (SOW) FOR USCGC SMILAX Crane ServiceSMILAX bent a support lattice on the CG300 crane and is in need for rental crane services for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL 1.1 BACKGROUND The 100' WLIC asset, USCGC SMILAX, has a bent the lattice on the upper section of the CG300 and requesters a crane and qualified rigger that can lift the boom off to the pier and replace it with a new 8500 LB 720in x 70inx 70in boom section being provided by Sparrows. 1.2 SCOPE The scope of this contract is defined by the efforts and tools required to support USCGC SMILAX. The Contractor shall provide all labor, materials, and tools necessary to lift, up to 8500 lb boom off the Cutter and back onto the Cutter 1.3 OBJECTIVE The goal is to return CGC SMILAX CG300 to designed system parameters. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: 2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC 2.1 Boom lift - Remove boom from cutter.The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. 2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Crew will unbolt boom stops and boom and Contractors will lift boom stops then boom and place on pier. 2.1.4 CGC SMILAX will remove pins holding top boom section. LAST UPDATED: 10/13/2026 Diminsions Boom stop -1000 lb 240in x 10in x 10in Boom - 8500 LB 720in x 70inx 70in 1.3 OBJECTIVE The goal is to return CGC SMILAX CG300 to designed system parameters. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: 2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC 2.1 Boom lift - Remove boom from cutter.The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. 2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Crew will unbolt boom stops and boom and Contractors will lift boom stops then boom and place on pier. 2.1.4 CGC SMILAX will remove pins holding top boom section 2.1.6 The Contractor will lift boom back onto cutter where the crew will bolt it to the crane. 2.2 Test Thoroughly and Document The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative. 2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office. 3.0 CONTRACTOR PERSONNEL 3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 4.0 OTHER APPLICABLE CONDITIONS 4.1 PERIOD OF PERFORMANCE The period of performance for this contract shall not exceed 2 calendar from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC SMILAX at 2301 E. Fort Macon RD. Atlantic Beach, NC 28512. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. 4.4 TRAVEL Contractor travel may be required to support this requirement. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications). Contractors will lift old boom section off and place new boom section in its place, where crew will attach sections together 2.1.6 The Contractor will lift boom back onto cutter where the crew will bolt it to the crane. 2.2 Test Thoroughly and Document The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative. 2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office. 3.0 CONTRACTOR PERSONNEL 3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 4.0 OTHER APPLICABLE CONDITIONS 4.1 PERIOD OF PERFORMANCE The period of performance for this contract shall not exceed 2 calendar from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC SMILAX at 2301 E. Fort Macon RD. Atlantic Beach, NC 28512. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. 4.4 TRAVEL Contractor travel may be required to support this requirement. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications). 5.0 GOVERNMENT FURNISHED RESOURCES NA 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. 7.0 GOVERNMENT ACCEPTANCE PERIOD The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 8.0 DELIVERABLES The Contractor shall provide a trip report IAW 2.2 of this SOW. | - | Combined Synopsis | 10/26/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
6991PE25Q000007
Archive Date
Oct 4, 2025