Retention Pond Vegetation Removal
Archived on June 6, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM CDT
- Posted
- May 14, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 561730: Landscaping Services
- Agency
- Department of AgricultureAGRICULTURAL RESEARCH SERVICE
Notice details
- Office
- USDA ARS AFM APD
- Place of performance
- Gainesville, Florida, 32608
- PSC
- S208: HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1232SA26Q0567
- Notice ID
- 6cf1325b9bf64eee91e02e61f92b33fe
Description
This project is to Remove Vegetation from the Retention Pond at the USDA, ARS, Gainesville, FL location.
Please review the attached documents for the required information.
Please sent you r quotes directly to the email Point of Contact in this solicitaion.
A site visit has been scheduled for Wednesday May 13, 2026, at 8:00 am EST. If you would like to attend, please send the name of the personnel requesting to attend with the name of the compnay which they are representing to lynn.hults@usda.gov by 2:00 pm CST Tuesday May 12, 2026.
Questions and Answers.
Q1: Overhead and street views indicate a need to get the surrounding shoreline cleaned up in order to gain access to the retention pond. We have equipment for that, but the steepness of the bank would dictate the use of either a track loader or an excavator to facilitate the job. Would this bid require debris removal to a landfill?
A1:
- A tracked excavator will be necessary to preform the work required. The requirements are as follows.
- Removal of all vegetation in retention pond
- Removal of specified trees and vegetation immediately around retention pond
- Wet debris may be piled for removal after drying
- All debris will either be hauled off site or mulched on site
Q2: Would we be able to leave equipment and trailers at the job site?
A2: Equipment can be left on site during the prefomance of contractual work.
Q3: Is there any special permitting required?
A3: No special permitting is required on site. DOT may regulate the transportation of wet debris.
Q4: What is the approximate pond size (acreage and depth)?
A4: 150’ in diameter and 8’ below surrounding grade at bottom. These are NOT actual dimensions but estimates.
Q5: Are stumps required to be removed as part of tree clearing?
A5: Yes, stumps are to be removed.
Q6: Are there any environmental restrictions or permits required for this work?
A6: No permits are required on site for this work to our knowledge.
Q7: Is there a preferred debris disposal method (mulching on-site vs. hauling off-site)?
A7: No preferred method. The area is to be left tidy with no piles of debris at job completion.
Q8: Are there any site access limitations we should plan for?
A8: No.
Q9: What is the required completion timeframe for the project?
A9: 4 weeks from start of work.
Q10: Does the pond have water in it? Does it need to be pumped to do the job?
A10: We are in an exceptional drought this year. No water is visible right now. As to whether it needs to be pumped to do the job that would be up to the contractor to determine.
Added a overview photo and the sign in sheet from the site visit.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (6)
- Download
Pond Elevation.jpeg
4.2 MBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Pond sign-in sheet.pdf
889 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
C05a_Highest Technically Rated with Fair and Reasonable Pricing Evaluation Criteria 1232SA26Q0567.docx
57 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05_CSS_Commerical Products and Services_Revised 22 Apr 2026 1232SA26Q0567.docx
33 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Wage Rates 2015-4537 Rev 29 042926.pdf
512 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
SOW_Retention Pond.docx
15 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Retention Pond Vegetation Removal
- 2Version 2Combined Synopsis/SolicitationArchived
Retention Pond Vegetation Removal
- 3Version 3Combined Synopsis/SolicitationArchived
Retention Pond Vegetation Removal
- 4Version 4Combined Synopsis/SolicitationArchived
Retention Pond Vegetation Removal
- 5Version 5Combined Synopsis/SolicitationArchived
Retention Pond Vegetation Removal
- 7Version 7Combined Synopsis/SolicitationArchivedCurrent
Retention Pond Vegetation Removal
- 9Version 9Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Retention Pond Vegetation Removal
Similar Opportunities
Additional Details
Solicitation Number
1232SA26Q0567
Archive Date
Jun 6, 2026
Office Address
BELTSVILLE, MD, 20705