Notice ID: 70027ff52cdb8d045ab4cc0c884e478aAward NoticeAwarded
34--Machine Spring yoke
Awarded on November 3, 2010. Full description on SAM.gov.
Awarded tounder W912EK-11-P-0012 (source: SAM.gov award notice)• $10.4K
Overview
- Posted
- November 5, 2010
- Notice type
- Award Notice
- NAICS
- 331513: Steel Foundries (except Investment)
Notice details
- Place of performance
- ILLINOIS WATERWAY PROJECT OFFICE 257 GRANT STREET PEORIA IL 61603-3503 US
- PSC
- 34: METALWORKING MACHINERY
- Last updated
- Dec 3, 2025
- Award date
- Nov 3, 2010
- Award amount (SAM.gov award notice)
- $10.4K
Identifiers
- Solicitation number
- W912EK-11-T-0002
- Notice ID
- 70027ff52cdb8d045ab4cc0c884e478a
- Award number (PIID)
- W912EK-11-P-0012
Description
Machine Spring Yoke
Award Overview
Award Number
W912EK-11-P-0012
Award Amount (SAM.gov award notice)
$10.4K
Award Date
Nov 3, 2010
Awardee
Original Solicitation
Notice ID: 70027ff52cdb8d045ab4cc0c884e478a
Posted Date: Nov 5, 2010
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Sue Robinson, 309-794-5442 USACE District, Rock Island
Documents
No documents available.
Lifecycle
Solicitation:
W912EK-11-T-0002- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 4×Pre-SolicitationOct 13, 2010
34--SPRING YOKE MACHINING
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Ladles | 45% | Combined Synopsis | 06/29/2026 |
Proposed procurement for NSN 4730014684368 COUPLING HALF,QUICK DI: Line 0001 Qty 54 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0251 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0060 DAYS ADO All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | 36% | Combined Synopsis | 11/27/2026 |
Material and Labor to Build ten culvert valve roller assemblies | 63% | Awarded | Open |
63% | Awarded | Open | |
Steel Castings shall be produced and heat treated in accordance with ASTM A 148, Grade 90-60. Nondestructive Testing. The steel castings shall be visually examined for surface cracks or discontinuities. Any substantive defects will be cause for rejection and the casting shall be replaced at the Contractor's expense. Weld documentation and material certification is required as per ASTM A148 Grade 90-60.GENERAL REQUIREMENTS: All steel castings shall be annealed before machining to remove casting process stresses. Castings that are warped or otherwise distorted or that are oversize to an extent that will interfere with proper fit with other parts of the machinery or structure will be rejected. Repairs to castings shall not be made without the knowledge and prior approval by the Contracting Officer. Excessive segregation of impurities or alloys at critical points in a casting will be cause for rejection. | 58% | Awarded | Open |
Additional Details
Solicitation Number
W912EK-11-T-0002
Archive Date
Dec 19, 2010