Notice ID: e1b57590326c4de48f5716f0dd4b865dSolicitation
Solid Oxide Fuel Cell Power System
Archived on September 28, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−07:00
- Posted
- September 9, 2024
- Notice type
- Solicitation
- NAICS
- 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
- Agency
- Department of Homeland SecurityUS CUSTOMS AND BORDER PROTECTION
Notice details
- Office
- BORDER ENFORCEMENT CONTRACTING DIVISION
- Place of performance
- Spokane, 99218
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 70B03C24Q00000387
- Notice ID
- e1b57590326c4de48f5716f0dd4b865d
Description
U.S. Customs and Border Protection (CBP), U.S. Border Patrol, Spokane Sector, requires four brand-name solid oxide fuel cells and filter kits. To enable integration into its existing systems, the following make, model, and part numbers are required: Manufacturer: Edge Autonomy Energy Systems Model.: Energy Performer Series – P250i Solid Oxide Fuel Cell Power System Part No. (fuel cells): P250i-4003 Part No. (filter kits): 90187A-SK01 A copy of the brand-name justification supporting the brand-name requirement is attached to this solicitation notice. The fuel cells shall be delivered to the following address within 8 weeks after receipt of order: U.S. Customs and Border Protection U.S. Border Patrol, Spokane Sector 10710 N Newport Hwy Spokane, WA 99218 This is a Request for Quotations (RFQ). This RFQ is issued on an unrestricted basis under NAICS code 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing. The corresponding size standard is 600 employees. All responsible sources may submit a quotation which shall be considered by the agency. See Section IV.5.1 for quotation preparation and submission instructions. See Section IV.7 for evaluation criteria. It is anticipated that award will be made on or about September 19, 2024. No sustainable acquisition requirements apply. One or more of the items under this acquisition is subject to Free Trade Agreements. In order to be considered for award, vendors must be registered in the System for Award Management (SAM) at www.sam.gov prior to the solicitation closing date. Interested vendors not already registered in SAM are strongly encouraged to register as soon as possible. Quotations shall be submitted by e-mail to Eric Neckel at eric.r.neckel@cbp.dhs.gov with the subject line "RFQ #70B03C24Q00000387 – Solid Oxide Fuel Cells." Questions about this acquisition shall be submitted in writing to Eric Neckel at eric.r.neckel@cbp.dhs.gov.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
70B03C24Q00000387- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationAug 30, 2024
Solid Oxide Fuel Cell Power System
- SolicitationCurrentSep 9, 2024
Solid Oxide Fuel Cell Power System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
THIS SOLICITATION AND ANY SUBSEQUENT AMENDMENTS WILL BE POSTED TO THE SAM WEBSITE: SAM.GOV ELECTRONIC SUBMISSION OF QUOTES IS AVAILABLE THROUGH THE SAM WEBSITE. To be considered for award, if the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 (I.E., not more than 3 years old unless a lesser time is specified in the solicitation) **Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period** Please read the contract in its entirety. If you are able to provide a quote be sure to provide the following information in the sections provided below: Page 1 BLK 17a. Provide Contractor's info and cage code. Section A. A1 – 1. Enter The Contractor's POC Section B. – Enter your Quote and any other info we should know. Please quote FOB Destination BREMERTON, WA. Section B. K21 – Check the appropriate box and provide the Manufacturer’s Name, Address and the Country of Manufacturing Section F. – Provide the Lead Time and/or Delivery Date. Section K. - 52.204-24 (d)(1) and (2) Check the applicable boxes Page 1 - Read box 28 and sign boxes 30 a, b, and c. Return the signed and filled out solicitation with your quote by WEDNESDAY, 11 NOVEMBER 2026 BY 10AM PST FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL. Please be advised that all communications regarding this requirement are governed by the Procurement Integrity Act. In accordance with FAR 3.104, no proprietary bid information, pricing data, or source selection-sensitive metrics may be exchanged or solicited outside of authorized contracting channels. Thank you for your cooperation in maintaining a fair and ethical procurement process." | - | Solicitation | 11/11/2026 |
| - | Solicitation | Open | |
| - | Solicitation | Open | |
ELECTRICAL CABLE THIS SOLICITATION AND ANY SUBSEQUENT AMENDMENTS WILL BE POSTED TO THE NECO WEBSITE: WWW.NECO.NAVY.MIL ELECTRONIC SUBMISSION OF QUOTES IS AVAILABLE THROUGH THE NECO WEBSITE | - | Pre-Solicitation | Open |
No Description Provided | - | Sole Source / J&A | Open |
Additional Details
Solicitation Number
70B03C24Q00000387
Archive Date
Sep 28, 2024
Office Address
WASHINGTON, DC, 20229