GovChime

Wilburt mast installation

Overview

Response deadline
1:00 PM UTC−05:00
Posted
September 5, 2018
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
Unknown NAICS (as reported): 811213
Agency
Department of Homeland SecurityFEDERAL EMERGENCY MANAGEMENT AGENCY

Notice details

Office
NATIONAL CONTINUITY SECTION(CON50)
Place of performance
4420 Buckeystown Pike, Fredrick, MD, 21704
PSC
58: COMM/DETECT/COHERENT RADIATION
Last updated
Jan 23, 2026

Identifiers

Solicitation number
70FA5018Q00000011
Notice ID
19fec702f0f90d59440fbb6cca8d04a3

Description

THE FOLLOWING QUESTIONS AND ANSWERS HAVE BEEN RECEIVED: #1-Is it possible to get pictures of both MERS Trailers? We can provide pictures if needed. We just need specifics of what pictures you would like. However, we cannot release these photos during solicitation stage due to security concerns. #2-Does the existing Mast being moved from Trailer #1 currently HAVE all the associated (same)equipment being quoted as the new mast install? No, some of the items quoted are in additional to what the current mast has. #3-Will Trailer #1 New Mast need an oiler and regulator quoted? Yes, because the current system has a Mast and Compressor only that is being reused. #4- Are the trailers identical as far as height?(from ground level to trailer deck) No, the two trailers are different #5- Does Trailer #1 currently have a mast guy kit and foot control? It has the Guy Kit, but no foot control #6- What is the timeframe on-site for this project? The work is to be done at a local shop within 75 miles of Frederick, MD and needs to be completed within #7- Are there any restrictions for this project? Yes, it must be done by a certified Wilburt mast Installer and be completed at a shop within 75 miles of Frederick, MD #8- Will the compressor need to be installed inside the shelter? No, the compressor will be installed in an existing storage box sitting on the deck of the trailer in front of the large shelter box #9- Do both trailers have grounding kits? Both trailers have grounding capabilities/grounding kits for the two trailers in reference (Trailer having mast removed and trailer having that same mast installed) Trailer listed as APG tower has grounding capabilities but no kit currently. It will have one in the future. #10- Is the voltage provided by the generator 120 volts? ie. for the air compressor Yes, it provides regular 110 power for all AC equipment in the shelter #11- Would you prefer to have any redundant cables in your nycoil for future use? No, as we have already accounted for this

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationFEDERAL EMERGENCY MANAGEMENT AGENCYSep 5, 2018-

Lifecycle

Solicitation:70FA5018Q00000011
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentAug 29, 2018

    Wilburt mast installation

    Notice 19fec702f0f90d59440fbb6cca8d04a3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

70FA5018Q00000011

Archive Date

Sep 22, 2018

Office Address

BERRYVILLE, VA, 22611